Several prediction model of penetration rate (PR) of tunnel boring machines (TBMs) have been focused on applying to design stage. In construction stage, however, the expected PR and its trends are changed during tunneling owing to TBM excavation skills and the gap between the investigated and actual geological conditions. Monitoring the PR during tunneling is crucial to rescheduling the excavation plan in real-time. This study proposes a sequential prediction method applicable in the construction stage. Geological and TBM operating data are collected from Gunpo cable tunnel in Korea, and preprocessed through normalization and augmentation. The results show that the sequential prediction for 1 ring unit prediction distance (UPD) is R2≥0.79; whereas, a one-step prediction is R2≤0.30. In modeling algorithm, a gradient boosted regression tree (GBRT) outperformed a least square-based linear regression in sequential prediction method. For practical use, a simple equation between the R2 and UPD is proposed. When UPD increases R2 decreases exponentially; In particular, UPD at R2=0.60 is calculated as 28 rings using the equation. Such a time interval will provide enough time for decision-making. Evidently, the UPD can be adjusted depending on other project and the R2 value targeted by an operator. Therefore, a calculation process for the equation between the R2 and UPD is addressed.
최근 저탄소 녹색성장 등 건설 환경의 변화에 따라 친환경적이고 시공 효율성을 극대화할 수 있는 유닛모듈러 공법 등과 같은 새로운 건축시스템에 대한 요구가 증대되고 있다. 유닛모듈러 공법은 전체 공정의 80%이상을 공장에서 제작하고 현장에서는 유닛모듈 조립과 마감작업 위주로 작업이 진행되므로 설계 및 공장 제작 등 현장시공 이전 단계의 품질이 건축물 전체의 품질을 좌우하는 특성을 가진다. 국내 유닛모듈러 공법은 2003년 학교 건축물의 적용을 시작으로 점차 확대되고 있지만, 적용 사례와 관련 자료의 부족, 모듈러 생산업체의 영세성 등으로 유닛모듈러 공법의 특성을 충분히 반영한 설계, 공장제작 및 현장시공은 아직 이루어지지 못하고 있는 실정이다. 본 연구는 국내 유닛모듈러 건축물의 설계품질 향상의 일환으로 공장제작 및 현장시공 단계에서의 문제점을 도출하고, 그 원인을 비교 분석함으로써 유닛모듈러 건축물의 설계 초기 단계에서 고려해야 할 주요 검토 항목을 제시하였다.
초기평형상태를 만족하는 간략해석법(Jung et al., 2015)의 무응력길이를 이용하여 사장교의 임의 시공단계를 직접적으로 모사할 수 있는 무응력길이 기반의 시공단계 해석법을 제시하고, 이 방법의 효용성과 정확성을 보이고자 한다. MIDAS해석 시 unknown load factor기능을 이용한 초기형상해석과 lack of fit force기능을 이용한 순방향해석을 실시하는데 반하여 ULM (unstrained length method)해석법은 무응력길이만 알고 있으면 중간단계를 거치지 않고 직접적으로 특정중간단계를 해석할 수 있다. 2차원 인천대교모델을 구축하고 ULM과 MIDAS를 각각 적용하여 시공단계해석을 수행하고, 수치예제를 통하여 두 해석결과를 분석한 결과, 완공계의 주탑, 주거더의 길이 차이로 인한 오차를 제외하면 비교적 서로 일치하는 결과를 보였다. 아울러, 포장무게와 카운터웨이트를 역으로 재하하여 폐합해석을 수행하고, 결과비교를 통하여 두 해석결과의 타당성을 보였다.
Currently in the drought evaluation, which is a supplier-oriented standard that applies storage rates of reservoirs, evaluation for users that use agricultural water is not done. Therefore, this study established drought evaluation items for drought evaluation based on farmers' judgement, conducted a survey on farmers and experts, compared and analyzed weighted value between two groups, and then classified the evaluation standards per each evaluation item. The agricultural drought evaluation items are 5 major items of water supply lapse rate, agricultural weather, agricultural irrigation facility, crop and soil, and 12 subsections for regional characteristics and opinions of consumers that use water to be reflected. The result of analyzing weighted value of farmers and experts' major items shows that farmers is agricultural irrigation facility(0.219), water supply lapse rate(0.211), agricultural weather(0.204), crop(0.183) and soil(0.183). Experts is agricultural weather(0.297), agricultural irrigation facility(0.202), water supply lapse rate(0.189), crop(0.162) and soil(0.150), which displays difference between the two groups. The agricultural drought criteria standards are established based on precedent studies and cases, and grades of evaluation items are 1st grade(extreme stage), 2nd grade(warning stage), 3rd grade(alert stage) and 4th grade(attention stage). The above analysis per each consumer-oriented agricultural drought evaluation item and the analysis on the standards of evaluation grades are expected to be used as a basic resource for establishing agriculture drought policy and selecting drought area in the future.
Steel corrosion in embedded steel causes a significant durability problems and this usually propagates to structural degradation. Large-scaled concrete structures, PSC (Pre-stressed Concrete) or RC (Reinforced Concrete) structures, are usually constructed with mass concrete and require quite a long construction period. When they are located near to sea shore, chloride ion penetrates into concrete through direct or indirect exposure to marine environment, and this leads durability problems. Even if the structures are sheltered from chloride ingress outside after construction, the chloride contents which have been penetrated into concrete during the long construction period are differently evaluated from the initially mixed chloride content. In the study, chloride profiles in cores extracted from anchorage concrete block in two large-scaled suspension bridge (K and P structure) are evaluated considering the exposure periods and conditions. Total 21 cores in tendon room and chamber room were obtained, and the acid-soluble chlorides and compressive strength were evaluated for the structures containing construction period around 3 years. The test results like diffusion coefficient and surface chloride content from the construction joint and cracked area were also discussed with the considerations for maintenance.
Recently, world-wide focusing on the interest for the reduction of greenhouse gas emissions associated with climate change and global warming, South Korea also has set up a national greenhouse gas reduction target and action plans seeking to achieve them. In particular, in the construction area, to encourage green building certification of the building and carbon labeling acquisition of building products, in order to reduce the environmental impact caused by the industrial activities have been in steady efforts. Therefore, this study estimates the life cycle carbon footprint of building construction materials applied to carbon emissions reduction technology and analyzes the results. Through the CO2 emissions analysis in construction phase and maintenance phase of the building, it provides basic resource for future research expansion and establishes a step-by-step whole life cycle carbon emissions reduction plan in new construction and existing buildings.
Recently, CM at Risk delivery system(CM@R) that could solve the problems of Design Bid Build delivery(DBB) system has been emerging. In the CM@R delivery system, the contractor negotiates for a maximum guaranteed price(GMP) with the client at the design stage, and the contractor carries out the construction within the GMP. In CM @ R, the construction company with expertise in construction participates from the design stage to reflects the construction know-how in the design. On the other hand, the modification design frequently occurs due to the change of the construction cost when negotiating the GMP. In addition, uncertainties are inherent in the GMP calculation because the calculation is based on unfinished drawings and documents. This study proposes a probabilistic GMP estimation method applying MCS to the BIM - based cost prediction model, in order to extract the accurate quantity information when estimating the GMP and to cope with the change of the construction cost inherent in uncertainty.
As the number of defects in apartments has increased recently, lawsuits and disputes related to defects have also increased. As a result, the loss of time and money is enormous. Therefore, fundamental measures are needed to reduce the occurrence of defects. Therefore, the purpose of this study is to propose a plan to reduce defects, focusing on window construction. To this end, existing studies were reviewed, and data from domestic construction companies were collected and classified to organize the types of defects. Based on the classified data, eight types with a high incidence of window glass were analyzed according to the time of occurrence, and the cause and causal relationship of the defect were schematized. It aims to identify the degree of possibility of recurrence of defects for each of the eight defect types for experts and derive key management elements using the RII method. Therefore, the goal is to select key management elements of window construction that actively reflect the characteristics of the construction stage.
This study investigated the effect of fly ash content on the isothermal hydration heat of cement pastes. Two different pastes with fly ash content were studied to cure at 35℃. The hydration heat flow deceleration stage of slurry was simulated and compared by Jander Equation and Ginstling-Brounshtein Equation. The results show that Jander Equation and Ginstling-Brounshtein Equation have certain defects in the modeling of the deceleration stage of the heat flow of cement fly ash paste, and the fitted curve can not describe the deceleration stage well.
Saemangeum reclaimed area is needed to construct much green zone to make high-quality multi-functional land such as tide embankment, lake dike, industrial complex, environmental spaces, etc. However, growth of plants is somewhat difficult because a salinity of Saemangeum soil is very high and a soil fertility, water content of soil are low. Therefore, it is essential to initial desalination of soil and continuous management for planting base. It is recommended that a group of grassland to raise the efficiency of covering should be made in the first stage and a forest by improvement of vegetation should be made in the mid and long term stage. It is recommended that the construction of vegetation base should be made with a regular thickness of soil of good quality in multi-functional area such as a shrub and wood. In case of construction of a windbreak forest, it is necessary to make a wood base of suitable depth using soil brought from another place or filling of soil. Also, it is necessary to keep a maintenance of woods in early stage. Saemangeum reclaimed land will be brand-named worldwide tourist attractions due to construction of much green zone having high quality multi-functional facilities.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.