• Title/Summary/Keyword: Construction site staff

Search Result 30, Processing Time 0.025 seconds

SMRT STnF Construction and Performance (서울특별시도시철도공사 STnF 구축과 성과)

  • Lee, Jong-Kye;Park, Jong-Hun;Kim, Ki-Chun
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.2573-2580
    • /
    • 2011
  • SMRT(Seoul Metropolitan Rapid Transit Corporation) changed PC-oriented office system to Smart-Phone oriented mobile office system(STnF: SMRT Talk & Flash), and provided smart phone to all staffs. STnF make it possible not only voice communication between staff, but also to input and inquiry all kind of information related to work(ex: Facility maintenance, Rolling Stock management, office management, Finance, human resource etc.) based on smart phone. STnF conquers the limitation of time and space. All staffs can commute to the site directly to reduce moving time and to share information between staffs, so SMRT improve speed and reliability of work by making a quick decision and action on the spot. After introduction of STnF, within 1 year, the equipment failure ratio fell to 47%. Mobile office system reduced and level-off the step of approval. so enhanced civil customer service. Quantification and scientific movement of work make it fast evolution and development. These business improvement make it possible to put more outstanding manpower on new business and R&D project, and this contributes to company's management effectiveness.

  • PDF

Assessment of Formaldehyde Concentration in Indoor and Outdoor Environments of Schools in Incheon (인천지역 일부 학교의 실내 및 대기 중 포름알데히드 농도 평가)

  • Jeung, Yeon-Hee;Choi, Sang-Jun
    • Journal of Environmental Health Sciences
    • /
    • v.33 no.5
    • /
    • pp.372-378
    • /
    • 2007
  • This study evaluated formaldehyde concentration in classrooms and on roofs at 4 elementary schools, 3 middle schools and 3 high schools in Incheon City. These schools were chosen based on their surrounding environments that included industrial site, landfill, railway, 8-lane road and harbor. Indoor concentration ranged between 4.65 and $56.25{\mu}g/m^3$, while that of outdoor concentration was $1.23{\sim}10.22{\mu}g/m^3$, both of which were below $100{\mu}g/m^3$, a formaldehyde criterion stipulated by the School Health Act. Indoor concentration was higher than outdoor concentration by $1.4{\sim}5.9$ times, and there was a positive correlation between indoor and outdoor formaldehyde concentrations (R=0.49). As for indoor concentration, multi-use practice rooms had an average 2.8 times higher than that of usual classrooms with a statistically significant difference (p<0.01). Indoor formaldehyde concentration had a positive correlation with the construction year (R=0.55). The school close to the industrial complex had the highest ambient formaldehyde concentration, followed by the one near a landfill. The formaldehyde concentration in school in the vicinity of the industrial complex was twice or more than that of the school located other site. In conclusion, this study suggests that it is crucial to consider surrounding environments in selecting school sites, as it can influence ambient air contamination, as well as using construction material that emit less formaldehyde, in order to protect the health of students, teachers and school staff.

Successful Management and Operating System of a UNESCO World Heritage Site - A Case Study on the Wadi Al-Hitan of Egypt - (유네스코 세계자연유산의 성공적인 관리와 운영체계 - 『이집트 Wadi Al-Hitan』의 사례 -)

  • Lim, Jong Deock
    • Korean Journal of Heritage: History & Science
    • /
    • v.44 no.1
    • /
    • pp.106-121
    • /
    • 2011
  • The number of World Natural Heritage Sites is smaller than that of World Cultural Heritage Sites. As of 2010, the total number of natural sites was 180, which is less than 1/3 of all cultural sites. The reason why the number of natural sites is smaller can be attributed to the evaluating criteria of OUV(outstanding universal value). Only 9 fossil related sites were designated as World Heritage Sites among 180 Natural Sites. This study compares their OUVs including the academic value and characteristics of the 9 World Heritage Sites to provide data and reference for KCDC(Korean Cretaceous Dinosaur Coast) to apply as a World Natural Heritage Site. This study was carried out to obtain information and data on the Wadi Al-Hitan of Egypt which was designated as a World Natural Heritage Site. The study includes field investigation for whale fossils, interviews of site paleontologists and staff, and inspections of facilities. Three factors can likely be attributed to its successful management and operating system. First, there is a system for comprehensive research and a monitoring plan. Secondly, experts have been recruited and hired and professional training for staff members has been done properly. Finally, the Wadi Al-Hitan has developed local resources with specialized techniques for conservation and construction design, which matched well with whale fossils and the environment at the site. The Wadi Al-Hitan put a master plan into practice and achieved goals for action plans. To designate a future World Natural Heritage Site in Korea, it is important to be recognized by international experts including IUCN specialists as the best in one's field with OUV. Full-time regular-status employees for a research position are necessary from the preparation stage for the UNESCO World Heritage Site. Local government and related organizations must do their best to control monitoring plans and to improve academic value after the UNESCO World Heritage Site designation. As we experienced during the designation process of Jeju Volcanic Island and Lava Tubes as the first Korean World Natural Heritage Site, participation by various scholars and specialists need to be in harmony with active endeavors from local governments and NGOs.

Development of Remote Radar/AIS Network System for Observing and Analyzing Vessel Traffic in Tokyo Bay

  • Hagiwara, Hideki;Shoji, Ruri;Tamaru, Hitoi;Liu, Shun;Okano, Tadashi
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • v.1
    • /
    • pp.151-156
    • /
    • 2006
  • Accurate vessel traffic observation is indispensable to carry out vessel traffic management, design of vessel traffic route, planning of port construction, etc. In order to observe the vessel traffic accurately without many efforts such as the use of a ship or car equipped with special radar observation system and the preparation of observation staff, the authors have been developing completely automated remote radar/AIS network system covering the main traffic area in Tokyo Bay. The composite radar image observed at Yokosuka and Kawasaki radar stations with AIS information can be seen on web site of Internet. In addition to the development of radar/AIS observation system, the software to analyze observed vessel traffic flow has been developed. This software has various functions such as automatic tracking of ship's positions, automatic estimation of ship's size, automatic integration of radar image and AIS data, animation of ships' movements, extraction of dangerous ship encounters, etc. The configuration and functions of the developed remote radar/AIS network system are shown first in this paper. Then various functions of the software to analyze vessel traffic are introduced, and some analyzed results on the vessel traffic in Tokyo Bay are described demonstrating the effectiveness of the developed system.

  • PDF

Evaluating Schedule Management Capability in Korean Construction Industry through Importance-Performance Analysis (IPA 방법을 활용한 국내 건설 산업 공정관리 역량 평가)

  • Lee, Jin Gang;Song, Bohyeon;Kim, Dain;Choi, Jaehyun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.24 no.1
    • /
    • pp.145-156
    • /
    • 2024
  • In an era where construction projects are becoming increasingly large and complex, the Korean construction industry faces the challenge of implementing systematic and cohesive schedule management practices. This study initially delineates the concept of schedule management capabilities, systematically categorizing them into five distinct domains: law and regulations, requirements of project owners, capabilities of professionals and organizations, task capability, and the adoption of smart construction technologies for schedule management. Through a survey targeting industry professionals, this research assesses the perceived importance and the actual proficiency level in schedule management across these categories, employing an Importance Performance Analysis(IPA) to scrutinize these capabilities. The findings underscore the acknowledged significance of diverse aspects of schedule management, yet reveal discrepancies between the current proficiency levels and their perceived importance, pinpointing areas necessitating enhancement. Critical improvement needs identified encompass the planning of budgets for schedule management, development of regulations for assessing construction periods, deployment of specialized on-site staff for schedule management, and investment in advanced schedule management software solutions. Consequently, this study offers a nuanced analysis and strategic insights for enhancing schedule management practices, aiming to facilitate their effective implementation in the field.

Improvement through Analysis of Current Open Book Policy for the Korean CM at Risk (국내 시공책임형 CM 오픈북 정책 현황 분석을 통한 개선방안)

  • Park, Kyungmo;Kim, Changduk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.2
    • /
    • pp.3-11
    • /
    • 2016
  • CM at Risk has been introduced in Korea to keep up with the global standards of construction management and provide a higher quality of cm service in line with a rapid change of the construction industry recently. However, it is widely considered that more time would required to settle down the system due to a lack of understanding towards CM at Risk, shortage of reliability and low capability to manage and undertake CM at Risk. Therefore, this research is analyzed problems of contract types, open book policies, and contract conditions of 33 numbers of projects undertaken by a bespoke domestic construction management firm in this research. Moreover, this research is suggested a method to establish an open book policy of CM at Risk aiming a better customers satisfaction through staff training, simplifying and improving a payment system, and a way to settle down an open book policy by improving a performance management system on site. It's expected that this research will contribute to a more competitive system with more dominating the market and a differentiation of the service so as clients to rely more on the CM at Risk.

Automatic Algorithms of Rebar Quantity Take-Off of Green Frame by Composite Precast Concrete Members (합성 PC부재에 의한 그린 프레임의 철근물량 산출 자동화 알고리즘)

  • Lee, Sung-Ho;Kim, Seon-Hyung;Lee, Goon-Jae;Kim, Sun-Kuk;Joo, Jin-Kyu
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.1
    • /
    • pp.118-128
    • /
    • 2012
  • As the bearing wall structure, which has been widely applied to domestic apartment buildings since the 1980s, cause many problems during remodeling of buildings, the government encourages constructors to adopt flat plate or rahmen structure through legal incentives. In line with such a trend, the green frame, an eco-friendly rahmen structure that has removed the shortcomings of previous structures, was developed to enhance structural safety, constructability, and eco-friendliness. The construction of green frame can reduce the labor cost and facilitate the composition of iron bars to reduce rebar loss through calculating the quality and establishing the bar bending schedule automatically on the precast concrete member data collected over the design phase. Therefore, the purpose of this study is to develop the algorithm to automate the calculation of iron bar volume for the green frame designed on composite precast concrete members. Automated algorithm to calculate concrete structural design information and design information. Practices through the application site should prove efficacy. The database established by the developed algorithm will automate the establishment of iron bar processing map and bar cutting list and the calculation of optimal composition and order volume to minimize the rebar loss. This will also reduce the expenses on management staff and overall construction cost through the minimization of rebar loss.

A Study on Cognitive Survey for Employment Prospect of Library and Related Organization (도서관 및 유관기관 취업 사서의 고용실태 조사 연구)

  • Noh, Younghee
    • Journal of Korean Library and Information Science Society
    • /
    • v.48 no.1
    • /
    • pp.43-75
    • /
    • 2017
  • In this study, Employment Status and Environment of Librarian, to investigate the employment prospect survey was conducted to the subjects of a librarian. The results of this study are as follows. First of all, employment environment of the library site base on the cognitive survey was showed that low wages, unstable jobs, difficulty in work due to staff placement that does not match majors, disagreement with the boss, self-regard as a librarian, excessive workload, a poor work environment etc. Second, the field workers preferred cultural program related electronic information organisation and service as the contents to be added to the curriculum of the library information department of the university. Third, the employment environment of irregular workers is characterised by high competition, low wages, high turnover number, and excessive workload. Fourth, The biggest problem when preparing for employment was the lack of employment information. Therefore, various improvement measures based on the results of the above studies are required, especially, construction of employment information system, Introduction of the field - based curriculum, specific employment conditions are required when hiring.

An Optimal Design Algorithm of Pile Supported Foundations of Tower Cranes (타워크레인의 파일기초 최적설계 알고리즘 개발)

  • Ryu, Sang-Yeon;Seo, Deok-Seok;Kim, Sun-Kuk
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.5
    • /
    • pp.95-101
    • /
    • 2009
  • As buildings increase in height, lifting plans are becoming increasingly important on construction sites. As a critical piece of load-lifting equipment, the tower crane deserves a well thought-out stability review, since it has a significant impact and is very vulnerable to structural safety disaster. To ensure the structural stability of a tower crane, its lateral support or pile supported foundation designs must include consideration for stability, and pile foundation must be used if site conditions prevent soil from providing the required bearing capacity, or prevent the foundation from being increased to the required extent. Pile supported foundation design requires thorough and systematic review, as more stability parameters need to be considered than with an independent foundation. This paper intends to develop an optimal design algorithm that can minimize associated costs while ensuring the fundamental stability of pile supported foundation design, limiting the scope of research to fixed-type trolley tower cranes using pile supported foundations. The findings herein on pile foundation stability review parameters, process and optimal design are expected to improve the operational efficiency of staff concerned, and reduce the time and efforts required for pile foundation design.

Project of Improving Good Agriculture Practice and Income by Intergrated Agricultural Farming (미얀마 우수농산물 재배기술 전수사업)

  • Lee, Young-Cheul;Choi, Dong-Yong
    • Journal of Practical Agriculture & Fisheries Research
    • /
    • v.16 no.1
    • /
    • pp.193-206
    • /
    • 2014
  • The objectives of the project are to increase farmers' income through GAP and to reduce the loss of agricultural produce, for which the Korean partner takes a role of transferring needed technologies to the project site. To accomplish the project plan, it is set to implement the project with six components: construction of buildings, installation of agricultural facilities, establishment of demonstration farms, dispatching experts, conducting training program in Korea and provision of equipments. The Project Management Committee and the Project Implementation Team are consisted of Korean experts and senior officials from Department of Agriculture, Myanmar that managed the project systematically to ensure the success of the project. The process of the project are; the ceremony of laying the foundation and commencing the construction of training center in April, 2012. The Ribbon Cutting Ceremony for the completion of GAP Training Center was successfully held under PMC (MOAI, GAPI/ARDC) arrangement in SAl, Naypyitaw on June 17, 2012. The Chairman of GAPI, Dr. Sang Mu Lee, Director General U Kyaw Win of DOA, officials and staff members from Korea and Myanmar, teachers and students from SAl attended the ceremony. The team carried out an inspection and fixing donors' plates on donated project machineries, agro-equipments, vehicles, computers and printer, furniture, tools and so forth. Demonstration farm for paddy rice, fruits and vegetables was laid out in April, 2012. Twenty nine Korean rice varieties and many Korean vegetable varieties were introduced into GAP Project farm to check the suitability of the varieties under Myanmar growing conditions. Paddy was cultivated three times in DAR and twice in SAl. In June 2012, vinyl houses were started to be constructed for raising seedlings and finished in December 2012. Fruit orchard for mango, longan and dragon fruit was established in June, 2012. Vegetables were grown until successful harvest and the harvested produce was used for panel testing and distribution in January 2013. Machineries for postharvest handling systems were imported in November 2012. Setting the washing line for vegetables were finished and the system as run for testing in June 2013. New water tanks, pine lines, pump house and electricity were set up in October 2013.