• Title/Summary/Keyword: Construction site office

Search Result 122, Processing Time 0.03 seconds

An In-depth Analysis of Enhancing the Core Blueprint of Architectural Constructs Leveraging Value Engineering(VE) Techniques (VE 기법을 활용한 건축 구조물 코어 형식 개선 방안에 관한 연구)

  • Lee, Jae-Taek;Kim, Gyu-Yong;Lee, Jae-Hyun;Nam, Jeong-Soo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.23 no.5
    • /
    • pp.571-581
    • /
    • 2023
  • The contemporary domestic construction landscape has witnessed a contraction, primarily attributed to the operational challenges faced by construction entities and a downtrend in the initiation of new projects. In light of this, domestic construction enterprises are ardently seeking avenues to economize whilst simultaneously amplifying the quality across diverse construction genres. Value engineering (VE), heralded for its prowess in not only cost mitigation but also in accelerating project timelines and bolstering construction quality, has been extensively adopted in refining finishing tasks. However, its application to framework enhancements remains conspicuously limited. Particularly in factory edification, framing emerges as a pivotal process exerting significant influence over the entire construction continuum. Thus, it becomes imperative to integrate VE techniques at the inception phase of framing. This would facilitate a meticulous examination of design schematics and on-site conditions, paving the way for alternative strategies that condense construction durations, economize on costs, and augment work efficiency, all the while upholding paramount standards of quality and safety. Such a venture stands to be foundational in expediting construction timelines, fostering economic efficiency, and buttressing construction safety protocols.

Exposure of Outdoor Workers to Particulate Matter in Construction Sites (건설업 옥외작업장 근로자의 미세먼지 노출 실태 조사)

  • Kim, Seung Won;Lee, Ga Hyun;Phee, Young Gyu;Yang, Won-Ho;Ha, Wonchul;Park, Hyunghee
    • Journal of Korean Society of Occupational and Environmental Hygiene
    • /
    • v.27 no.1
    • /
    • pp.46-58
    • /
    • 2017
  • Objectives: Particulate matter (PM) at construction sites mostly originates from either construction activities or the atmospheric environment. This study was conducted to evaluate the exposure level to PM and the contribution ratio of atmosphere sources at construction sites. Methods: We reviewed literature and governmental systems related to PM exposure in occupational settings and summarized them. In the field evaluation, five construction sites and one golf course were selected: two from Gyeonggi-do Province and four from North Gyeongsang-do Province. For each site, personal samples from outdoor construction workers and area samples from the outdoor area around the construction site office were collected according to construction work types. PM concentrations reported from nearby National Ambient Air Monitoring Stations were recorded. Respirable dust concentrations, respirable silica concentrations, and several metal concentrations including Cd, Cr, Pb, and As were monitored over four months. In the end we suggested how to manage particulate matter exposure at construction sites. Results: There was little literature reporting on exposure levels of construction workers to PM. Respirable dust concentrations measured in Gyeonggi-do Province were higher than those measured in North Gyeongsang-do Province. The geometric means of respirable dust concentrations in personal samples and area samples were $37.89{\mu}g/m^3$ and $92.86{\mu}g/m^3$, respectively. The respirable dust concentrations were higher than the PM concentrations reported from nearby National Ambient Air Monitoring Station. The geometric means of respirable silica concentrations of personal samples and area samples were $1.3{\mu}g/m^3$ and $1.1{\mu}g/m^3$, respectively. All metal concentrations were lower than 10% of individual Korean occupational exposure limits. Conclusions: Assuming that personal samples consisted of ambient PM and dust originating from work activities and area samples only collected ambient PM, we concluded that the dust exposure of outdoor construction workers originated 40.8% from the atmosphere and 59.2% from construction activities. PM exposure at construction sites should be controlled by employers, as in the case of outdoor heat stress. The Korean government needs to consider setting an occupational exposure limit for respirable dust.

A Study on the Improvement of Green Building Certification Information System (친환경건축물 인증제도 활성화를 위한 정보시스템 개선 연구)

  • Ryu, Soo-Hoon
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.11 no.3
    • /
    • pp.5-16
    • /
    • 2011
  • This study aims for improvement and rebuilding of the 'Green Building Certification Criteria Information System;GBCCIS'. To achieve this, improved information system has developed self-assessment program available on the web and to provide data about the target of Green Building Certification based on the 2010 revised criteria. The target building of Green Building Certification is Apartment, Office, Mixed-Use Building, School, property for sale, accommodation, and other facilities. Also, the information system about the Green building related technologies and techniques to take advantage of offer a variety of information was built. Green Building Certification Criteria web-site Established in this study has information and each menu and contents are linked to organic and high-utilization. Each menu is organized according to the used frequency and the group. Also this web-site is composed of information guide field, core service field, and other field. These improvement of Green Building Certification Criteria Information System can be a positive incentive measures for the activation of Green Building Certification Criteria easily by taking advantage of relevant information by users. And these will be possible to planning development of Green building technologies by introducing the latest Green building construction techniques applicable building. Also, to assess in advance by using self-assessment program in the design phase of building will lead to Green building design and provide the convenience of the application process and through database construction and share information of building assessment resources certified Green Building Certification Criteria will lead to the containment and fair assessment between cation authorities.

Site and Erection of the Government Complex Seoul in Capital Seoul (수도 서울에서 정부종합청사의 입지와 건립)

  • Lee, Sumin;Woo, Don-Son
    • Journal of architectural history
    • /
    • v.27 no.2
    • /
    • pp.51-62
    • /
    • 2018
  • This study examines the site and erection of the Government Complex Seoul which was a project attempted to assemble dispersed government buildings in a certain place. The study focuses on the fact that the project is situated between the 1960s' making of capital Seoul and Seoul urban planning, and the way how the project achieved symbolism in capital Seoul. The project, one of the 1960s' Major Government Buildings, led both plan of capital Seoul and transforming city Seoul. The 1960s' Major Government Building Plan had identical drive with the 1950's Major Government Building Plan, however the 1960s' had additional layer: Seoul urban planning. After restoration of the Capital building, Sejongro the capital street was planned to the site arranging government offices. The Government Complex Seoul was set to be a modern building on a site with historical context according to the plan. Because of the site, the Government Complex Seoul was constructed in aware of other buildings that represented a competitive high-rise atmosphere in the late 1960s, including the Capital building nearby. PAE International's plan was completed through a series of design modification, and it boasted a vertical aspect, unlike the horizontal-looking plan that was already won after the design competition. The Government Complex Seoul tried to acquire the symbolism in the central space of the capital Seoul and high-rised city Seoul. "The new construction method" was a requirement to achieve the height.

A Study on the Estimating Rate of Safety Management Cost in Building Work (건축공사 안전관리비 비율 산정 모형에 관한 연구)

  • Son, Ki-Sang;Gal, Won-Mo;Yang, Hak-Su
    • Journal of the Korean Society of Safety
    • /
    • v.22 no.5
    • /
    • pp.33-40
    • /
    • 2007
  • Standard safety management costs can not be applied to each site with same rate, it is very difficult, because it depends on the experience, work method, work kind, work progress schedule, and hazard level of each construction company. Therefore, this study is to find out hazard level of each work kinds through questionnaire and interview and investigate analyze the status which standard safety management costs have been used. Also, this study is to show reasonable rates of standard safety management costs in construction industry and to set up countermeasures against those problem after reviewing its status in korea with in Japan and Europe. This study is to investigate eleven project kinds of domestic system, first, and to investigate eleven items of apartment bldg, office. Also this study is to investigate and analyze performed costs of presently processing worker finished work so that it shows a new reasonable rate against standard safety management costs in construction industry, in order to make basical data and material to be systemized.

A Study on Developing a Model for Evaluating the Validity of New School Construction (학교(學校) 신축(新築) 타당성(妥當性) 평가(評價) 모형(模型) 개발(開發)에 관한 연구(硏究))

  • Lee, Hwa-Ryong
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.12 no.5
    • /
    • pp.47-56
    • /
    • 2005
  • Reports on population movement(2000-2030) by the National Statistical Office show that the number of elementary school age population will be decreased by 1.4million from 2005 to 2020. It will effect both school size and the policies for school facilities, which have focused on downsizing class as the high standard of OECD nations. As the unfolding evidence is emerging that a number of schools and classes will be emptied out by 2030. This study aims at developing a model for evaluating the validity of school establishment, which would help more reasonable decision-making for new school construction and the class extension in the existing schools. It classifies two different ways in founding a new school - school establishment in a residential developing site and school establishment for solving a overcrowd class. It proposes the assesment items and the methods for evaluating its validity. In the end, it suggests an assesment model which the district educational offices can use in the course of planning the student accomodations to schools and making decisions for new school construction and the class extension in the existing schools. This study would be expected to help the reasonable expenditure for school facilities and to restrict overbuilding of surplus classes.

Construction and Estimation of Web-based Real Time ERP System - A Case Study (웹기반 실시간 ERP 시스템 구축 및 평가-사례연구)

  • Kim, Jae-Saeng;Choi, Sang-Kyoon
    • The Journal of the Korea Contents Association
    • /
    • v.8 no.4
    • /
    • pp.30-38
    • /
    • 2008
  • At past, but smaller enterprises had operated each business automation system about office, at present, are making use of integration ERP information system that take advantage of accessible web technology in outside environment. In this research we took smaller enterprise's example, constructed ERP system that real-time processing is available to supply ERP information to customer by real time and to handle business in outside site. With construction result of this system, we verified efficiency of system and customers' satisfaction etc of customer's complaint solution, business productivity elevation, economical curtailment and so on through various kinds quantitative estimation.

Construction Plan of Ground Fire Fighter Conduct Manual on Forest Fire Occurrence Site -Case Study on Ground Fire Fighter Team of National Forest Office- (산불현장 지상진화 행동매뉴얼 구축 방안 -국유림관리소 지상진화대원 업무를 중심으로-)

  • Lee, Si-Young;Lee, Myung-Woog
    • Fire Science and Engineering
    • /
    • v.21 no.3
    • /
    • pp.8-14
    • /
    • 2007
  • The manual was proposed for individual role, according to the stages of forest fire suppression at forest fire occurrence site, for forest fire crew who has a responsibility of national forest office. The scopes of this manual are (1) apply to initial attack before arriving helicopter, (2) apply to ground fire fighting support with air attack, (3) apply to mop-up after withdraw air attack, (4) apply to night suppression when air attack is impossible. This manual is arranged for incident commander or ground fire fighter duties from the 1st stage of acceptance of forest fire to the 10th stage of withdraw of helicopter. This was developed for the purpose of every awareness of the crews and therefore of fire reduction of damage of lives, properties and forest through systematic and rapid response to forest fire.

Construction of Aluminum Curtain Wall with 3D Elevation for TRUTEC Building (트루텍 빌딩의 3차원 입체 커튼월 시공)

  • Park, Choel;Hong, Doo-Pyo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.119-122
    • /
    • 2007
  • TRUTEC building, which is located at DMC B block is zone, is just one the office building in Soeul. TRUTEC building is designed by Barkow Leibinger Architeken in Germany, has 5 stories under and 12 stories above and has been finished with the unique three dimensional curtain wall unit. Big trial to make unique elevation succeeded as getting rid of the typical plain curtain wall unit. In addition, aluminum bars are treated by the latest CNC machine in order to achieve 3D section. Construction of curtain wall is highly focused from the moment of contract to keep the schedule because the contract period is 18 months. Regular design meeting and technical meeting between stakeholders including construction manager, designer, engineer, consultant and so on have been held during the construction to minimize the risks from the unique elevation and trial. Step by step mock-up test (design mock-up and visual mock-up on site) has been performed before functional mock-up test.

  • PDF

A Study on the Improvement of a Fleet Management System for Construction Equipment (건설장비 플릿관리 시스템 개선에 관한 연구)

  • Kim, Sung-Keun;Lim, So-Young
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.37 no.6
    • /
    • pp.1063-1076
    • /
    • 2017
  • To improve the productivity of the earthwork, a fleet management system for construction equipment was suggested in previous studies. But there were some gaps between theory and practice. To overcome this problem, some opinions are gathered form experts and field engineers and four improvements have been proposed and reflected in the system. First, the previous system consists of one hardware module, so it is hard to install it at a control office and construction equipment at the same time. The server module for the office and the mobile module for construction equipment are separately developed. Second, the transportation algorithm that is used in the previous system can generate shortest paths for the earthwork distribution, but embankment areas are not gathered. This situation leads to a decrease in compaction productivity. A modified algorithm for earthwork distribution is suggested. Third, the automated coordinate transformation is performed to show the position of construction equipment on the 3D terrain in real-time. Fourth, construction equipment groups should be formed in the initial stage of earthwork and the number of equipment of each groups should be changed by operation status and site environment. But this functions did not work properly in the previous system. This problem is corrected in the proposed system. The improvements can make the proposed system much more realistic one and can leads to an increase in the productivity of earthwork operations.