Park, Jin-Jung;Kim, Hyeon-Seung;Choi, Gwang-Yeol;Shin, Min-Ho;Kang, Leen-Seok
Proceedings of the KSR Conference
/
2010.06a
/
pp.1518-1524
/
2010
Measures on poor process should be identified by reviewing analysis of planned progress and actual progress for successful performance of Process Control. However, the existing Process Control only performances follow-up measures on poor process but it cannot prevent poor process which is not occurred. To solve these problems, this study suggests the three types of methods of process prediction(Regression Analysis) by using a progress rate which consists of planned progress rate and Actual progress rate.
Moon, Jin Seok;Yoon, Hoi Soo;Han, Choong Han;Kim, Seong Jin
Annual Conference of KIPS
/
2012.04a
/
pp.1428-1429
/
2012
건설분야 수량산출정보의 연계 및 교환을 위한 디지털 수량산출정보 교환표준과 지방국토관리청의 도로관리관점에 따라 구성된 작업분류체계를 바탕으로 도로분야 수량산출정보를 지원도구를 통해 생성한다. 건설사는 지원도구에서 작성한 도로공사 수량산출정보를 건설사업관리시스템에 등록함으로써 공정 공사비 관리에 활용하고 있다. 본 연구는 공정 공사비의 통합관리를 통해 실질적인 사업관리가 가능하도록 10개 도로건설공사 시범사업을 선정하여 문제점과 개선방안을 도출하였다.
Sheathing work used for excavation in a crowded downtown is generally a temporary strut method using H-piles and sheathing wall includes lagging, CIP, SCW or slurry wall. A temporary strut serving the support for sheathing wall acts to resist the earth pressure, but it shall be removed when installing the underground structure members. A traditional temporary strut might cause the stress imbalance of the sheathing wall when it is demolished, resulting in time extension and the risk of collapse. A traditional temporary strut method thus needs to be improved for schedule and cost reduction, risk mitigation and for preparation for potential civic complaint. A permanent strut method doesn't require installing and demolishing the temporary structure that will lead to reducing the time and cost and the structural risk during the demolition process. And given the girder, the part of the underground structure, serves the role of strut, it can secure the wider interval compared to the traditional method, which enables to secure the wider space for the convenience of excavation as well as enhance the constructability and efficient site management. The thesis was intended to study the composite girder designed to use the strut as permanent structure so as to reduce the excavation and floor height.
The application of the BIM for the KEPCO' new headquarters in Naju involved alternative approaches and accompanied many trials-and-errors as the project adopted new targets and purposes that were not used in Korea before. In particular, for a large BIM-based project, clearly defining the BIM-including the objective, scope and the outcome-is critical for a project owner. For a successful implementation, project owners should improve the utilization of the BIM. Against this background, this research examines the case of the BIM application for the KEPCO' new headquarters in Naju, identifies its effects and problems, and proposes how to improve application of the BIM for public projects. The improvement in the BIM application can be divided into several stages: project order, design development, construction, and post-construction maintenance. In the initial stage, it is important to fully discuss the project planning among participants, and clarify the goal, scope, expected outcomes and role of the BIM. In the design stage, the level of detail (LOD) for the 3D model should be defined in consideration of information use in the stages of estimation and construction. In the construction stage, the scope of project that is managed based on the processing and use of the BIM data should be clearly given and understood. After construction is complete, measures should be sought to use the BIM for maintenance, and corresponding requirements and outcomes should be provided. The analysis is expected to provide basic data for successful implementation of BIM-based public projects, by assisting project owners and involved parties in enhancing work in different stages of a project.
Hosny, Ossama A.;Elbarkouky, Mohamed M.G.;Elhakeem, Ahmed
Journal of Construction Engineering and Project Management
/
v.5
no.1
/
pp.11-19
/
2015
This paper presents optimized artificial neural networks (ANNs) claims prediction and decision awareness framework that guides owner organizations in their pre-bid construction project decisions to minimize claims. The framework is composed of two genetic optimization ANNs models: a Claims Impact Prediction Model (CIPM), and a Decision Awareness Model (DAM). The CIPM is composed of three separate ANNs that predict the cost and time impacts of the possible claims that may arise in a project. The models also predict the expected types of relationship between the owner and the contractor based on their behavioral and technical decisions during the bidding phase of the project. The framework is implemented using actual data from international projects in the Middle East and Egypt (projects owned by either public or private local organizations who hired international prime contractors to deliver the projects). Literature review, interviews with pertinent experts in the Middle East, and lessons learned from several international construction projects in Egypt determined the input decision variables of the CIPM. The ANNs training, which has been implemented in a spreadsheet environment, was optimized using genetic algorithm (GA). Different weights were assigned as variables to the different layers of each ANN and the total square error was used as the objective function to be minimized. Data was collected from thirty-two international construction projects in order to train and test the ANNs of the CIPM, which predicted cost overruns, schedule delays, and relationships between contracting parties. A genetic optimization backward analysis technique was then applied to develop the Decision Awareness Model (DAM). The DAM combined the three artificial neural networks of the CIPM to assist project owners in setting optimum values for their behavioral and technical decision variables. It implements an intelligent user-friendly input interface which helps project owners in visualizing the impact of their decisions on the project's total cost, original duration, and expected owner-contractor relationship. The framework presents a unique and transparent hybrid genetic algorithm-ANNs training and testing method. It has been implemented in a spreadsheet environment using MS Excel$^{(R)}$ and EVOLVERTM V.5.5. It provides projects' owners of a decision-support tool that raises their awareness regarding their pre-bid decisions for a construction project.
Plant construction projects usually take much higher uncertainty and risks than the projects from other domains. This implies the importance of plant construction project management should be more emphasized than the other domain. Especially, the overall successes of the projects often depend on the performance of process planning and scheduling performed at the initial stage of the project. However, most plant construction projects suffer great difficulties in establishing proper process planning and scheduling timely because of unstructureness and dynamicity of environment of the project itself In this paper, we propose a knowledge-based process planning and scheduling approach in a plant construction domain to cope this problem. First, we modulize process planning knowledge and present the knowledge representation scheme. Second, we propose an inferencing mechanism to build a process planning for plant construction based on the represented process planning knowledge. Since our approach automate the initial process planning, which was usually done by manual way, it can improve the correctness and also completeness of the process plan and schedule by reducing the time to plan and allowing simulations on the various situation. We also design and implement this our approach as a real working system, and it is successfully applied to real plant construction cases from a leading construction company in Korea. Based on this success, we expect our approach can be easily applied to the projects of other areas, while contributing to enhancement in productivity and quality of project management.
The Transactions of the Korea Information Processing Society
/
v.5
no.4
/
pp.1005-1013
/
1998
In this paper, we describe technologies of Intranet administrator and user application used in the PEC(Protocol Engineering Center) Office Intranet system which provides platform independent application framework using Internet/Intranet standard technologies for distribution of Web documents and real-time multimedia information. The PEC Office is composed of administrator applications to support environments for administration of all applications including group/user add, update, and delete facilities and construction of user directory and user applications to support schedule sharing, virtual library, job report, output management, budget management, and real-time audio/video broadcasting services. These applications allow differentiation and customization services according to department and title employed per users.
Purpose: Most if buildings need various repair works for preventing or delaying the deterioration which gives rise to affect the living condition or function after constructed. Therefore, a long-term repair schedule should be planned and a repair cost is required. In this paper, it aimed at providing the statistical forecast model for a repair cost in roof water-proofing work and elevator work using statistical approach with three variables such as number of household, management area and a elapsed year. Data are collected in apartment housings which are located in Seoul area and conducted with interview and questionnaire sheet. Each analyzed work is divided into a partly work and fully work. Results of this study are shown that, first, the regression model takes a multiplying type like a Cobb-Douglas function and is changed into the log-linear type to include the three variable simultaneously. Second, the goodness-of-fit of the repair cost forecasting model has a good statistics in determinant's coefficient and Dubin-Watson value. Third, the management area is stronger factor than other the number of household and an elapsed year in roof water-proofing work and elevator work.
Korean Journal of Construction Engineering and Management
/
v.9
no.3
/
pp.153-163
/
2008
Domestic construction industry accounts about 15% of Gross Domestic Product(GDP) and Korean government spends approximately 50 trillion won per year for public infrastructure projects. Effective management of public construction projects would result in cost saving and enhance financial stability of the government. In doing so, the government promoted a new budgeting system, Continual Budget Method(CBM) as a part of public project performance enhancement program published in 1999. This research mainly attempted to investigate and analyze the impact of new budgeting in term of cost and schedule performance. Based on the analysis result of n2 projects. The new budgeting system could save project cost by 9.83y. Due to the saving of indirect costs from reduction. Although limited government budget cannot allow all the projects to be excuted with the new budgeting system, the new budgeting system should be more-widely utilized in the public sector because of its proven benefits from this research.
This study, with a view point to prevent accidents arising from steel structure, construction process, has taken an approach of reviewing related materials and construction safety guidelines, conducting questionnaire surveys and on field surveys. This study has also analyzed and classified accident cases and disclosed elements concerned with those accidents. A comparative analysis of the disclosed elements against the statutory provisions regarding industrial safety and it showed that strict observance of safety rules of the accident prevention measures in industrial safety standards will result in a decrease in accidents. It is concluded, however, that additional accident prevention measures, as suggested below, should be implemented for performing of more practical and positive accident prevention. 1) Thorough review and preparation at pre-working stage at sites : Such elements of fall preventing facilely as supporting ropes and steel fabrications for safety guard rails should be initially reflected on detailed drawings and shop drawings so that they can be installed in advance at fabricating plants. 2) Sets of steel frame stairs for work platform should be installed or secured with priority and temporary installation of such prefabricated platform as scaffolds should be installed in advance with those platform attached to the frame members on the ground whenever possible before they are lifted. 3) A decrease in the rate of accident by more than 10% on Tuesdays and Thursdays, has been shown from the accident analysis so schedule of construction process should consider possible weekday of high risk of accidents such as Tuesday and Thursday. 4) An array of systemized safety activities should be adopted, such as legal installation of safety facilities based on advance safety management plan, maintenance of safety for machinery and construction equipment, and strict compliance of safety rules by workers.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.