A Study on Forecasting Method for Efficient Schedule Management in Railway Construction (철도 공사의 효율적인 공정 관리를 위한 진도율 예측 기법 연구)

  • Park, Jin-Jung;Kim, Hyeon-Seung;Choi, Gwang-Yeol;Shin, Min-Ho;Kang, Leen-Seok
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.1518-1524
    • /
    • 2010
  • Measures on poor process should be identified by reviewing analysis of planned progress and actual progress for successful performance of Process Control. However, the existing Process Control only performances follow-up measures on poor process but it cannot prevent poor process which is not occurred. To solve these problems, this study suggests the three types of methods of process prediction(Regression Analysis) by using a progress rate which consists of planned progress rate and Actual progress rate.

  • PDF

A Case on the Applying QDB based Schedule·Cost Data Management for Road Construction (디지털 수량산출정보 기반 도로분야 공정·공사비 정보 관리 시범적용 사례)

  • Moon, Jin Seok;Yoon, Hoi Soo;Han, Choong Han;Kim, Seong Jin
    • Annual Conference of KIPS
    • /
    • 2012.04a
    • /
    • pp.1428-1429
    • /
    • 2012
  • 건설분야 수량산출정보의 연계 및 교환을 위한 디지털 수량산출정보 교환표준과 지방국토관리청의 도로관리관점에 따라 구성된 작업분류체계를 바탕으로 도로분야 수량산출정보를 지원도구를 통해 생성한다. 건설사는 지원도구에서 작성한 도로공사 수량산출정보를 건설사업관리시스템에 등록함으로써 공정 공사비 관리에 활용하고 있다. 본 연구는 공정 공사비의 통합관리를 통해 실질적인 사업관리가 가능하도록 10개 도로건설공사 시범사업을 선정하여 문제점과 개선방안을 도출하였다.

Strut as a Permanent System using Composite Beams (층고절감형 거더를 이용한 영구 스트러트 공법)

  • Hong, Won-Kee;Park, Seon-Chee;Kim, Jin-Min;Lee, Ho-Chan
    • KIEAE Journal
    • /
    • v.8 no.1
    • /
    • pp.87-92
    • /
    • 2008
  • Sheathing work used for excavation in a crowded downtown is generally a temporary strut method using H-piles and sheathing wall includes lagging, CIP, SCW or slurry wall. A temporary strut serving the support for sheathing wall acts to resist the earth pressure, but it shall be removed when installing the underground structure members. A traditional temporary strut might cause the stress imbalance of the sheathing wall when it is demolished, resulting in time extension and the risk of collapse. A traditional temporary strut method thus needs to be improved for schedule and cost reduction, risk mitigation and for preparation for potential civic complaint. A permanent strut method doesn't require installing and demolishing the temporary structure that will lead to reducing the time and cost and the structural risk during the demolition process. And given the girder, the part of the underground structure, serves the role of strut, it can secure the wider interval compared to the traditional method, which enables to secure the wider space for the convenience of excavation as well as enhance the constructability and efficient site management. The thesis was intended to study the composite girder designed to use the strut as permanent structure so as to reduce the excavation and floor height.

A Study on the Current Status and Improvement of BIM in the Government Owner Perspective - Focus on the KEPCO Na-Ju Head Office Project - (공공시설 발주자 관점에서의 BIM 적용 현황 및 개선방안 연구 - 한국전력공사 나주 신사옥 건립공사 사례를 중심으로 -)

  • Sim, Gu-Sik;Kim, Sung-Man;Ahn, Jae-Hong
    • Journal of KIBIM
    • /
    • v.3 no.2
    • /
    • pp.19-27
    • /
    • 2013
  • The application of the BIM for the KEPCO' new headquarters in Naju involved alternative approaches and accompanied many trials-and-errors as the project adopted new targets and purposes that were not used in Korea before. In particular, for a large BIM-based project, clearly defining the BIM-including the objective, scope and the outcome-is critical for a project owner. For a successful implementation, project owners should improve the utilization of the BIM. Against this background, this research examines the case of the BIM application for the KEPCO' new headquarters in Naju, identifies its effects and problems, and proposes how to improve application of the BIM for public projects. The improvement in the BIM application can be divided into several stages: project order, design development, construction, and post-construction maintenance. In the initial stage, it is important to fully discuss the project planning among participants, and clarify the goal, scope, expected outcomes and role of the BIM. In the design stage, the level of detail (LOD) for the 3D model should be defined in consideration of information use in the stages of estimation and construction. In the construction stage, the scope of project that is managed based on the processing and use of the BIM data should be clearly given and understood. After construction is complete, measures should be sought to use the BIM for maintenance, and corresponding requirements and outcomes should be provided. The analysis is expected to provide basic data for successful implementation of BIM-based public projects, by assisting project owners and involved parties in enhancing work in different stages of a project.

Construction Claims Prediction and Decision Awareness Framework using Artificial Neural Networks and Backward Optimization

  • Hosny, Ossama A.;Elbarkouky, Mohamed M.G.;Elhakeem, Ahmed
    • Journal of Construction Engineering and Project Management
    • /
    • v.5 no.1
    • /
    • pp.11-19
    • /
    • 2015
  • This paper presents optimized artificial neural networks (ANNs) claims prediction and decision awareness framework that guides owner organizations in their pre-bid construction project decisions to minimize claims. The framework is composed of two genetic optimization ANNs models: a Claims Impact Prediction Model (CIPM), and a Decision Awareness Model (DAM). The CIPM is composed of three separate ANNs that predict the cost and time impacts of the possible claims that may arise in a project. The models also predict the expected types of relationship between the owner and the contractor based on their behavioral and technical decisions during the bidding phase of the project. The framework is implemented using actual data from international projects in the Middle East and Egypt (projects owned by either public or private local organizations who hired international prime contractors to deliver the projects). Literature review, interviews with pertinent experts in the Middle East, and lessons learned from several international construction projects in Egypt determined the input decision variables of the CIPM. The ANNs training, which has been implemented in a spreadsheet environment, was optimized using genetic algorithm (GA). Different weights were assigned as variables to the different layers of each ANN and the total square error was used as the objective function to be minimized. Data was collected from thirty-two international construction projects in order to train and test the ANNs of the CIPM, which predicted cost overruns, schedule delays, and relationships between contracting parties. A genetic optimization backward analysis technique was then applied to develop the Decision Awareness Model (DAM). The DAM combined the three artificial neural networks of the CIPM to assist project owners in setting optimum values for their behavioral and technical decision variables. It implements an intelligent user-friendly input interface which helps project owners in visualizing the impact of their decisions on the project's total cost, original duration, and expected owner-contractor relationship. The framework presents a unique and transparent hybrid genetic algorithm-ANNs training and testing method. It has been implemented in a spreadsheet environment using MS Excel$^{(R)}$ and EVOLVERTM V.5.5. It provides projects' owners of a decision-support tool that raises their awareness regarding their pre-bid decisions for a construction project.

A Knowledge-based Approach to Plant Construction Process Planning (지식 기반 플랜트 건설 공정 계획 시스템의 개발)

  • 김우주
    • Journal of Intelligence and Information Systems
    • /
    • v.7 no.1
    • /
    • pp.81-95
    • /
    • 2001
  • Plant construction projects usually take much higher uncertainty and risks than the projects from other domains. This implies the importance of plant construction project management should be more emphasized than the other domain. Especially, the overall successes of the projects often depend on the performance of process planning and scheduling performed at the initial stage of the project. However, most plant construction projects suffer great difficulties in establishing proper process planning and scheduling timely because of unstructureness and dynamicity of environment of the project itself In this paper, we propose a knowledge-based process planning and scheduling approach in a plant construction domain to cope this problem. First, we modulize process planning knowledge and present the knowledge representation scheme. Second, we propose an inferencing mechanism to build a process planning for plant construction based on the represented process planning knowledge. Since our approach automate the initial process planning, which was usually done by manual way, it can improve the correctness and also completeness of the process plan and schedule by reducing the time to plan and allowing simulations on the various situation. We also design and implement this our approach as a real working system, and it is successfully applied to real plant construction cases from a leading construction company in Korea. Based on this success, we expect our approach can be easily applied to the projects of other areas, while contributing to enhancement in productivity and quality of project management.

  • PDF

The Design and Implementation of Intranet Administrator and User Application (인트라넷 관리자 및 사용자 응용의 설계 및 구현)

  • Shin, Myung-Ki;Hahm, Jin-Ho
    • The Transactions of the Korea Information Processing Society
    • /
    • v.5 no.4
    • /
    • pp.1005-1013
    • /
    • 1998
  • In this paper, we describe technologies of Intranet administrator and user application used in the PEC(Protocol Engineering Center) Office Intranet system which provides platform independent application framework using Internet/Intranet standard technologies for distribution of Web documents and real-time multimedia information. The PEC Office is composed of administrator applications to support environments for administration of all applications including group/user add, update, and delete facilities and construction of user directory and user applications to support schedule sharing, virtual library, job report, output management, budget management, and real-time audio/video broadcasting services. These applications allow differentiation and customization services according to department and title employed per users.

  • PDF

The Forecasting Model of the Repair Cost in Apartment Housing - Focused roof water proofing and Elevator work - (공동주택 공종별 수선비용 예측모델 연구 - 옥상방수 공사와 승강기 공사를 중심으로 -)

  • Lee, KangHee;Chae, ChangU
    • KIEAE Journal
    • /
    • v.15 no.6
    • /
    • pp.63-68
    • /
    • 2015
  • Purpose: Most if buildings need various repair works for preventing or delaying the deterioration which gives rise to affect the living condition or function after constructed. Therefore, a long-term repair schedule should be planned and a repair cost is required. In this paper, it aimed at providing the statistical forecast model for a repair cost in roof water-proofing work and elevator work using statistical approach with three variables such as number of household, management area and a elapsed year. Data are collected in apartment housings which are located in Seoul area and conducted with interview and questionnaire sheet. Each analyzed work is divided into a partly work and fully work. Results of this study are shown that, first, the regression model takes a multiplying type like a Cobb-Douglas function and is changed into the log-linear type to include the three variable simultaneously. Second, the goodness-of-fit of the repair cost forecasting model has a good statistics in determinant's coefficient and Dubin-Watson value. Third, the management area is stronger factor than other the number of household and an elapsed year in roof water-proofing work and elevator work.

An Empirical Study on the Effect of public Construction Industry by Expansion of New Budget System (계속비 사업 확대로 인한 공공건설사업 파급효과 분석)

  • Kim, Sang-Bum;Lee, Jeong-Dae;Cho, Ji-Hoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.3
    • /
    • pp.153-163
    • /
    • 2008
  • Domestic construction industry accounts about 15% of Gross Domestic Product(GDP) and Korean government spends approximately 50 trillion won per year for public infrastructure projects. Effective management of public construction projects would result in cost saving and enhance financial stability of the government. In doing so, the government promoted a new budgeting system, Continual Budget Method(CBM) as a part of public project performance enhancement program published in 1999. This research mainly attempted to investigate and analyze the impact of new budgeting in term of cost and schedule performance. Based on the analysis result of n2 projects. The new budgeting system could save project cost by 9.83y. Due to the saving of indirect costs from reduction. Although limited government budget cannot allow all the projects to be excuted with the new budgeting system, the new budgeting system should be more-widely utilized in the public sector because of its proven benefits from this research.

A Study on Prevention of Major Accidents Through Utilization of Fall-Preventing Safety Installations (재해율의 예측에 의한 강구조공사의 중대재해 예방에 관한 연구)

  • 손기상;정경운
    • Journal of the Korean Society of Safety
    • /
    • v.13 no.4
    • /
    • pp.221-229
    • /
    • 1998
  • This study, with a view point to prevent accidents arising from steel structure, construction process, has taken an approach of reviewing related materials and construction safety guidelines, conducting questionnaire surveys and on field surveys. This study has also analyzed and classified accident cases and disclosed elements concerned with those accidents. A comparative analysis of the disclosed elements against the statutory provisions regarding industrial safety and it showed that strict observance of safety rules of the accident prevention measures in industrial safety standards will result in a decrease in accidents. It is concluded, however, that additional accident prevention measures, as suggested below, should be implemented for performing of more practical and positive accident prevention. 1) Thorough review and preparation at pre-working stage at sites : Such elements of fall preventing facilely as supporting ropes and steel fabrications for safety guard rails should be initially reflected on detailed drawings and shop drawings so that they can be installed in advance at fabricating plants. 2) Sets of steel frame stairs for work platform should be installed or secured with priority and temporary installation of such prefabricated platform as scaffolds should be installed in advance with those platform attached to the frame members on the ground whenever possible before they are lifted. 3) A decrease in the rate of accident by more than 10% on Tuesdays and Thursdays, has been shown from the accident analysis so schedule of construction process should consider possible weekday of high risk of accidents such as Tuesday and Thursday. 4) An array of systemized safety activities should be adopted, such as legal installation of safety facilities based on advance safety management plan, maintenance of safety for machinery and construction equipment, and strict compliance of safety rules by workers.