Cost and Schedule Analysis of Highway Projects based on Project Types

  • Shrestha, Bandana;Shrestha, Pramen P.
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.50-56
    • /
    • 2022
  • Change Orders generally impact cost and schedule performance of highway projects. However, highway projects that do not have any change orders also face cost growth and schedule delays. This study seeks to determine the cost and schedule performance of Texas DOT projects by collecting project data for 120 highway projects completed between 2016 to 2020. For the study, we selected project data that has zero or negative change orders which were then grouped and analyzed based on their Project Types i.e., maintenance works; structural works; restoration and rehabilitation works; and safety works. The study found that performance of Maintenance and Safety type projects had less cost and schedule growth among the data analyzed. Statistical tests also found that even though the projects have no change orders, Rehabilitation and Restoration type projects experienced significant schedule growth compared to others. However, the data did not show any significant cost and schedule growth for the projects when statistical tests were performed on overall data. The study concluded that highway projects are experiencing schedule growth even though the projects had no change orders. Results from the study can help planners, engineers, and administrators to gain better insight on how different types of highway projects are performing in terms of cost and schedule and eventually derive appropriate solutions to minimize cost and schedule growth in such projects.

  • PDF

플래시를 이용한 웹기반 일정관리 도구 개발 (Development of a Web-based Schedule Tool Using Flash)

  • 장명훈
    • 한국건축시공학회지
    • /
    • 제10권2호
    • /
    • pp.51-57
    • /
    • 2010
  • 건설공사의 일정관리는 주어진 기간 내에 프로젝트를 완수하기 위한 중요한 수단이다. 액티비티의 수가 많아지고 복잡한 선후행 관계가 형성될수록 일정관리 소프트웨어를 활용해야 하는 필요성이 증대되고 있다. 또한 정보통신기술이 발달하면서 웹기반의 프로젝트관리 기술과 도구도 발전하고 있고 다수의 프로그램도 개발되어 있다. 본 연구는 웹 기반에서 일정관리 도구를 개발하기 위해 상호작용성이 우수한 플래시를 이용하는 방법을 제안하였다. 제안된 방법을 구현하기 위해 플래시와 액션스크립트로 프로토타입을 작성하였고 웹 화면에서 공정표를 표현하여 적용성을 검토하였다.

A STUDY ON BIM-BASED 5D SIMULATION IN WEB ENVIRONMENT

  • Jae-Bok Lim;Jae-Hong Ahn;Ju-Hyung Kim;Jae-Jun Kim
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.169-172
    • /
    • 2013
  • Building Information Modeling (BIM) is an effective decision-making platform that helps to save project cost and enhance quality of construction. By generating and linking a wide variety of objects data, BIM can be effectively utilized, and it should be ensured that object properties maintain consistency throughout the project period of design, estimates, construction, maintenance and repair. This study examined how to utilize BIM data in a construction project, by linking cost and schedule data in web environment, to better utilize the information and maintain consistency of the BIM information. To do so, the model integrated WBS data and CBS data, linked them with BIM model to realize 5D simulation in web environment. As a result, cost and schedule data could be simultaneously acquired, and object properties-cost, schedule, location-as well. These are expected to contribute to developing a BIM-based automatic data-processing system in web environment.

  • PDF

공정이행관리를 위한 선행작업관리 시안 (A Study on the Method of Preliminary Works Management for a Schedule Performance Management)

  • 박홍태;송용선
    • 한국산학기술학회논문지
    • /
    • 제9권3호
    • /
    • pp.757-764
    • /
    • 2008
  • 효율적인 공정이행관리를 통해서 건설공사 일정의 불필요한 공기지연을 사전에 예방하고, 나아가 품질확보를 위하여 각 공정의 내용을 정확하게 숙지하고 관리하는 일이 중요하다. 더욱 중요한 것은 공사계획에 따른 공정이 원활하게 진행될 수 있도록 각각의 공정에 필요한 선행작업들을 체계화하여 관리하는 것이다. 이를 위하여 본 연구에서는 아파트공사를 대상으로 이정표 중심, 작업공종 중심, 활동 중심, 작업 담당자 중심으로 구분하여 선행작업관리 시안을 제시하였다.

비용-일정통합기반 진도관리 개선방안 (Improvement of Cost-Schedule integration based Progress Management through PMIS)

  • 윤유상;서상욱;장규성;최장식
    • 한국건설관리학회논문집
    • /
    • 제14권5호
    • /
    • pp.144-152
    • /
    • 2013
  • 최근 건설프로젝트가 대형화되면서 건설사들은 PMIS(Project Management Information System)를 이용하여 대부분의 관리업무를 수행한다. 특히, 건설공사 수행과정에서 가장 빈번한 정보입출력이 발생하는 진도관리 기능은 PMIS의 여러 기능 중 가장 효율적으로 운영되어야 한다. 그러나 PMIS 내에서 입력되는 정보가 대부분 중복입력 없이 운영되고 있음에도 불구하고, 진도관리를 위한 데이터는 비용과 일정 정보의 개별 입력을 통해 관리되고 있는 실정이다. 따라서 물가상승, 설계변경 등에 의해 비용과 일정이 변경되는 사항에 대한 정보가 연계되지 못하여 진도측정의 부정확성과 PMIS에서 관리해야할 데이터의 증가를 유발한다. 이와 같은 문제를 해결하기 위해서 진도측정방법의 개선과 이를 기반으로 한 PMIS 진도관리 모듈의 구현이 요구되고 있다. 이에 본 논문에서는 수량산출정보 기반의 비용-일정 통합 진도측정방법과 비용-일정 통합관리에 필요한 PMIS 공통관리항목을 기반으로 한 PMIS 진도관리 개선 모듈을 제시하고자 한다.

건설 공정리스크 관리도구 개발 및 활용방안 (The Development and Application of Schedule Management Tools in Building Construction)

  • 정우준;윤유상;서상욱
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2004년도 제5회 정기학술발표대회 논문집
    • /
    • pp.384-387
    • /
    • 2004
  • 건설프로젝트 참여자들이 전체공기에 영향을 미치는 공정리스크 관리에 대한 중요성을 공감하고 있지만 그에 대한 관리 절차 및 도구 등이 체계화되어있지 않아 어려움을 겪고 있다. 또한 발생한 리스크에 대한 대응방안 및 관리방법에 대한 연구는 비교적 활발히 추진되었지만 시공단계의 리스크를 착공 전 단계에 파악하고자 하는 노력은 부족하였다. 따라서 본 연구에서는 건설프로젝트 전체공기에 중요한 영향을 미치는 착공 전 단계에서의 공정 리스크 관리업무를 지원하기 위하여 공사프로세스 중심의 리스크 분류체계와 전산시스템 구축을 위해 요구되는 코드체계 및 공정리스크에 대한 사전대비를 위한 공정리스크 검토양식을 개발하고, 이에 대한 활용방안을 제시하고자 한다.

  • PDF

Barriers of Last Planner System: A Survey in Vietnam Construction Industry

  • Khanh, Ha Duy;Kim, Soo Yong
    • Journal of Construction Engineering and Project Management
    • /
    • 제3권4호
    • /
    • pp.5-11
    • /
    • 2013
  • Construction industry is overwhelmed by delay and often has suffered cost and time overrun. In this context, Last Planner System (LPS) has been considered as a very useful tool for the management of the construction process. Many previous studies have reported its effectiveness in construction performance. This study aims to evaluate the level of importance of the Last Planner processes in the Vietnam construction industry (VCI), and analyze the existing barriers when implementing these processes in construction management. These barriers were collected based on previous studies from International Group for Lean Construction (IGLC). A survey was carried out through questionnaire. The respondents are been experienced people in construction project management. There are four processes of LPS that were investigated including master schedule, phase schedule, lookahead plan, and weekly work plan. The results showed that master schedule is the most important item when performing a construction project in the VCI. The highest degree of agreement belongs to 'owner - contractor' pair with 77.1% importance indices; whereas the lowest belongs to 'consultants - contractors' pair with 63.8% importance indices. Eventually, three barrier factors were extracted from factor analysis technique with 62.2% of variance explained.

Assessing Critical Quality Metrics for Successful Baseline Construction Scheduling

  • Bivans, John;Choi, Jin Ouk
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.1241-1241
    • /
    • 2022
  • In the current construction industry, difficulty arises in creating an adequate baseline schedule to establish a fundamental plan for construction. This presentation will present the research findings which investigated industry-recognized schedule metrics that aid in the successful implementation of said schedule. Industry organizations (Association for the Advancement of Cost Engineering, the Government Accountability Office, the Project Management Institute, and local city, state, and county government offices) provide standardized guidelines with specific metrics requirements to ensure successful implementation. However, most of those metrics are substantiated or validated in their effectiveness. The study examined the impact between these industry-recognized critical metrics and three distinct scheduling characteristics: Project Type, Project Duration, and Project Density (number of activities within a schedule). The research results showed that, among the 12 various schedules evaluated in parallel with 20 industry-recognized critical metrics, seven metrics substantially demonstrate a significant impact on a project schedule's success. Furthermore, six of the seven metrics directly correlate to at least one of the three scheduling characteristics outlined. As a result, this research has established more predictable outcomes based on impacts between three distinct project characteristics and 20 of the most discussed/researched critical scheduling metrics in the field. This allows management teams to have more confidence in establishing critical milestones and accurate turnover dates from the start of the project through its final completion.

  • PDF

AN ANALYSIS ON FACTORS AFFECTING SCHEDULE PERFORMANCE OF PUBLIC HOUSING PROJECTS: CASE OF SINGAPORE

  • Bon-Gang Hwang;Xianbo Zhao;Si Yi Ng
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.412-418
    • /
    • 2013
  • With the increasing demand for public housing, the Singapore government decided to reduce the waiting time of future public housing owners, which requires these projects to be completed on time. As a result, this study aims to identify the frequent and impactful factors affecting schedule performance of public housing projects in Singapore. The survey conducted with 36 industry experts revealed that "site management", "coordination among various parties", "design changes by owner during construction", "availability of laborers on site", "availability of material", and "availability of staff to manage projects" were the six factors that should be emphasized to assure the schedule performance of public housing projects. In addition, there was statistically significant agreement between public housing projects and other building projects on both the frequency and impact ranks of the factors. The findings from this study will help practitioners involving public housing projects to take measures to assure the achievement of project schedule objectives.

  • PDF

Multi-family Residential Construction Management Practice in the U.S.

  • Cho, Namho
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.1254-1254
    • /
    • 2022
  • The Multi-family Residential is one of the most famous building types for a rental property in the US. Often times it includes multiple residential buildings and some amenity facilities, including a clubhouse or leasing office, swimming pool, dog park, and garages. Since the building type is built for rental purposes, the construction planning is phased and it makes the project complicated. Detailed planning and execution are important for successful construction management. This paper provides some management practices that are applied to one of the multi-family residential construction projects in Phoenix, AZ. The Front End Planning (FEP) process performed by both owner and contractor is the first key to a successful construction project. Specifically, the early review of phased turnover strategy, grading, fire/Americans with Disabilities Act (ADA) compliance, and Mechanical/ Electricity/Plumbing/Technology (MEPT) will provide absolute benefit to the project. Second, using a scheduling method to control short-term schedules and long-term can provide the ability to manage the issues with agility. Third, material delivery and procurement dominate the both project schedule and cost. With this COVID-19 circumstance, it is hard to expect the material, equipment, and labor forces to be delivered on time with the contracted price. Managing floats are more than important to managing construction productivity. Risk management should work to share the risks fairly. Lastly, turnover is directly linked with the profit of the project for both owner and contractor. The communication between the owner and contractor to re-schedule the proper turnover schedule is important for the phased construction project.

  • PDF