• Title/Summary/Keyword: Construction scale

Search Result 2,854, Processing Time 0.067 seconds

A Study on The Risk Factors to Strengthen the Competitiveness in the Overseas Development Projects - Focused on New Town development of Developing Country - (해외 개발사업의 경쟁력향상을 위한 단계별 리스크 요인분석 - 개발도상국 신도시 개발사업을 중심으로 -)

  • Choi, Sung-Lack;Kim, Jung-Hyun;Jang, Se-Jun;Paek, Joon-Hong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.3
    • /
    • pp.59-67
    • /
    • 2008
  • Recently, domestic construction companies have been moving towards overseas markets due to decreasing orders and an increase in competitiveness within the domestic market. However, there is a higher risk involved in the overseas construction Industry than in the domestic construction industry. Especially, because domestic construction companies lack development's experience, such a companies have a weakness of hidden risk factors. For Overseas New Town development project's success of domestic construction companies, preferentially, It Is necessary to deduce and analysis of risk factors in real estate development phases. This study would possibly be able to provide the preliminary data for Overseas New Town development projects in the future.

An Analysis of Factors Affecting the Safety of Tower Crane in Construction Site (건설현장 타워크레인의 안전성에 영향을 미치는 요인 분석)

  • Ahn, Sungjin;Kim, Tae-Hui;Kim, Ji-Myong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.11a
    • /
    • pp.44-45
    • /
    • 2019
  • Tower cranes are essential equipments that play a key role in the overall process of large-scale construction projects, as well as high-rise apartments construction projects. Tower cranes hoist various loads near and over people, working in crowded environments, sometimes in overlapping work areas, and often under the constraints of time, budget, and labor. This work system further increases the safety risks of sites with inherently hazardous workplaces. The methodology of this research was based on a comprehensive inquiry of a team of experts, including safety managers and equipment managers of major construction companies and previous literature search. Due to the limited resources available to improve safety and prevent accidents, more attention should be paid to all parties involved in factors that have been evaluated to have a significant impact on site safety due to tower crane operations.

  • PDF

Information Requirements for Model-based Monitoring of Construction via Emerging Big Visual Data and BIM

  • Han, Kevin K.;Golparvar-Fard, Mani
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.317-320
    • /
    • 2015
  • Documenting work-in-progress on construction sites using images captured with smartphones, point-and-shoot cameras, and Unmanned Aerial Vehicles (UAVs) has gained significant popularity among practitioners. The spatial and temporal density of these large-scale site image collections and the availability of 4D Building Information Models (BIM) provide a unique opportunity to develop BIM-driven visual analytics that can quickly and easily detect and visualize construction progress deviations. Building on these emerging sources of information this paper presents a pipeline for model-driven visual analytics of construction progress. It particularly focuses on the following key steps: 1) capturing, transferring, and storing images; 2) BIM-driven analytics to identify performance deviations, and 3) visualizations that enable root-cause assessments on performance deviations. The information requirements, and the challenges and opportunities for improvements in data collection, plan preparations, progress deviation analysis particularly under limited visibility, and transforming identified deviations into performance metrics to enable root-cause assessments are discussed using several real world case studies.

  • PDF

Steel Plant Construction (EPC) Project Case Study : Forensic Lessons-learned Analysis and Systems Engineering Improvement Recommendation

  • Kyung-Bae Jin;Young-Ho Kim;Eul-Bum Lee;Suk-Hwan Seo
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.145-150
    • /
    • 2013
  • As a recent global trend, the majority of mega-size plant projects are delivered through EPC (Engineering, Procurement and Construction) contracts, where a single contract is awarded for engineering, procurement, and construction. Under this contracting mechanism, it is challenging for contractors to carry out the projects under traditional project management processes used in design-bid-build projects. A new EPC Plant, the POSCO Special Steel Plant in Changwon, was built successfully at the beginning of 2012 and it is currently in full-scale production. The project has encountered a number of major difficulties however, with some technical and managerial issues through its development process. As summarized in this paper, the authors (as project participants with the contractor) investigated it as a post construction analysis and recorded the Lessons-learned for future project management improvement.

  • PDF

Development of a Cell Phone Addiction Scale for Korean Adolescents (청소년을 위한 휴대전화 중독 도구 개발)

  • Koo, Hyun-Young
    • Journal of Korean Academy of Nursing
    • /
    • v.39 no.6
    • /
    • pp.818-828
    • /
    • 2009
  • Purpose: This study was done to develop a cell phone addiction scale for Korean adolescents. Methods: The process included construction of a conceptual framework, generation of initial items, verification of content validity, selection of secondary items, preliminary study, and extraction of final items. The participants were 577 adolescents in two middle schools and three high schools. Item analysis, factor analysis, criterion related validity, and internal consistency were used to analyze the data. Results: Twenty items were selected for the final scale, and categorized into 3 factors explaining 55.45% of total variance. The factors were labeled as withdrawal/tolerance (7 items), life dysfunction (6 items), and compulsion/persistence (7 items). The scores for the scale were significantly correlated with self-control, impulsiveness, and cell phone use. Cronbach's alpha coefficient for the 20 items was .92. Scale scores identified students as cell phone addicted, heavy users, or average users. Conclusion: The above findings indicate that the cell phone addiction scale has good validity and reliability when used with Korean adolescents.

Crash Analysis of Railway Vehicle Structure Using Scale Model (축소모형을 이용한 철도차량 충돌 해석 기법 연구)

  • 김범진;허승진
    • Proceedings of the KSR Conference
    • /
    • 2002.10a
    • /
    • pp.54-59
    • /
    • 2002
  • In general, the aluminum extrusions are used to the light construction of the high speed rail vehicle structures. However, the research works ok the crashworthy design of the high speed rail vehicle structures are not published sufficiently because the crash test of high speed rail vehicle structures costs high and is complicated. So, a method that can predict crash characteristics of a large size structure like a high speed tail vehicle should be suggested. In this study, the scale model studies are performed to predict the impact energy absorption characteristics of full scale model. In the first place, we verified the theory of scale law using FE-simulation from the crashworthiness point of view. Secondly, we performed the crush test using scale model, made of aluminum sub structure. As a result, we could predict the crash characteristics using scale model by 10∼20% error.

  • PDF

The Study on Problems in Bidding Guideline and Suggestion for Improvement in Architectural Turnkey project in Construction - Focused on Preventing Claim- (건축턴키공사 입찰안내서의 문제점과 개선방안에 관한 연구 - 클레임예방을 중심으로 -)

  • Yoon Jun-Seon
    • Journal of Arbitration Studies
    • /
    • v.15 no.3
    • /
    • pp.303-324
    • /
    • 2005
  • Turnkey project in construction which accounts for about $10\%$ of the total annual construction orders in the nation is expected to grow in size as an effort to strengthen international competitiveness and improve quality of construction work. However, problems of turnkey project in construction raise concern for many possible cases of possible claims. Based on the understanding that bidding guidelines which plays a critical role in turnkey project in construction actually contain some unequal clauses and causes for problems which undermine development of turnkey construction and further create possible cases of claims, the paper aims to identify and analyze the unequal clauses and problems contained in the guidelines in order to make suggestions for improvement. Among all the turnkey construction orders that has been placed since 2000 when domestic turnkey project in construction became relatively formulated, 13 constructions costing more than 50 billion won were selected for this study since their construction scale were large enough that the bidding guidelines for them were regarded as containing little difference among one another. In order to enhance construction technology and to prevent claims while trying to achieve the original purpose of Turnkey system, the parties involved in or schedule to take part in Turnkey project including ordering institution, Construction Company and Design Company should make an effort to have more reasonable bidding guidelines drawn up.

  • PDF

A Study on the improvement plan of regulatory standard for construction noise and vibration (공사장 소음진동 규제기준 개선방안에 관한 연구)

  • Park, Young-Min;Kim, Kyoung-Min
    • Journal of Environmental Impact Assessment
    • /
    • v.22 no.4
    • /
    • pp.369-379
    • /
    • 2013
  • Noise and vibration problems at the construction site, expansion of construction scale and frequency of urban construction is increased, has given the damage to local residents. Also, the result of civil complaint about noise and vibration that occurred in 2011 was 56,244; it is showing an increasing trend of more than 4% annually. In particular, the construction noise and vibration, the civil complaints of around construction site accounts for 64.6%(36,353), are harmful to the tranquility of living environment. As a result, the government has managed to strengthen the regulatory standard of construction noise (65dB(A), Day-time) from 2011. However, the regulatory standard of construction noise and vibration does not meet and also complaints related the construction noise and vibration not decreased. Because the management system can be applied to the construction site is insufficient and a shortage of manpower. In this study, investigated the status and problems of the regulatory standards related to construction noise and vibration, we propose an efficient management plan of construction noise and vibration.

Study on the Analysis of Domestic Construction Management Orders

  • Park, Jongsoon;Lee, Keunwon;Ann, Kyunghwan;Shin, Changhyun;Cho, Jaeho;Chun, Jaeyoul
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.387-391
    • /
    • 2015
  • Currently, there is insufficient research on the construction management performance since the CM system was introduced in Korea. For successful completion of construction projects, active use of construction mangers on projects is necessary by introducing construction management to the projects. In view of this, this study analyzed the annual CM performance from 1996 to 2013 but for the past 5 years from 2009 to 2013, a detailed analysis was carried out. For different sectors, CM performances were divided into public and private sectors, for project types, construction, civil and others, for project phases, pre-design, design, construction and post-construction phases, for contract types, sole and joint contract types, for project scale, the amount of the projects was taken into consideration and they were divided into large, medium and small scales and for the types of projects, they were divided into, shops, department stores, shopping centers, hospitals, government buildings, hotels, accommodation facilities, factories, buildings for workshops, office buildings, stadiums, playgrounds, schools and other construction types and all the data divided into such categories was analyzed. The results in this study can be used as a basic reference for studies in analysing construction management performances.

  • PDF

Reinforcement Effect of Stabilizing Piles in Large-scale Cut Slops (대절토사면에 보강된 억지말뚝의 활동억지효과에 관한 연구)

  • 홍원표;한중근;송영석;신도순
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2003.06a
    • /
    • pp.65-81
    • /
    • 2003
  • During the last few decades in Korea, the development of hillside or mountain areas has rapidly increased for infrastructure construction such as railroads, highways and housing. Many landslides have occurred during these constructions. Also, the amount and scale of damage caused by landslides have increased every year. In the case of Far East Asia including Korea, the damage of landslides is consequently reported during the wet season. In this paper, the effect of stabilizing piles on slope stability is checked and the behavior of slope soil and piles are observed throughout the year by field measurements in the large-scale cut slopes. In particular a large-scale cut slope situated on the construction site for the express highway in Donghae, Korea. First of all, The behavior of the slope soil was measured by inclinometers during slope modification. Landslides occurred in this area due to the soil cutting for slope modification. The horizontal deformations of slope soil gradually increased and rapidly decreased at depth of sliding surface indicating that the depth of sliding surface below the ground surface can be predicted. On the basis of being able to predict the depth of the sliding surface, stabilizing piles were designed and constructed in this slope. To ensure the stability of the reinforced slope using stabilizing piles, an instrumentation system was installed. The maximum deflection of piles is measured at the pile head and it is noted that the piles deform like deflection on a cantilever beam. The maximum bending stress of piles is measured at the soil layer. The pile above the soil layer is subjected to lateral earth pressure due to driving force of the slope, while pile below soil layer is subjected to subgrade reaction against pile deflection. As a result of research, the effect and applicability of stabilizing piles in large-scale cut slopes could be confirmed sufficiently.

  • PDF