Materials management using RFID in the apartment construction (RFID를 활용한 공동주택 건설공사 자재관리 방안 연구)

  • Park, So-Hyun;Song, Jeong-Hwa;Oh, Kun-Soo
    • Proceeding of Spring/Autumn Annual Conference of KHA
    • /
    • 2008.04a
    • /
    • pp.251-255
    • /
    • 2008
  • Nowadays the scale of domestic construction becomes large, sophisticated and specialized. It has led to a growing need for the high quality, cost reduction, safety and reduction of work duration. Therefore the importance of construction materials management is emphasized to perform the project successfully. It becomes an current issue about method of construction material management according to the flow of construction progress in the construction field. Therefore, various researches using RFID for efficiency of construction material are being studied. We analyzed the case study using RFID, drew the problems through the investigation of status about the management of material in the field, and then suggested the method of material management using in the apartment building construction field.

  • PDF

A Survey Analysis to Derive Priorities of Technology Developments for Automation of Construction Project (건설 프로젝트 자동화 기술개발 우선순위 도출을 위한 설문 분석)

  • Kwon, Woobin;Lee, Changsu;Ahn, Heejae;Kim, Taehoon;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.11a
    • /
    • pp.198-199
    • /
    • 2021
  • After the outbreak of COVID-19, the construction industry, which has more contact between workers than other industries, needs to improve its environment through the technology development for automation of construction projects. This study conducted 5-point scale surveys of 39 candidate technologies on 54 workers in construction- related industries to derive priorities for technology development to improve the construction environment. The result of this survey shows the top 10 candidate technology priorities, and this analysis can be used as basic data for setting the direction for future construction development.

  • PDF

Construction of a Hydraulic Scale Model for Representing the Field Tracer Experiment in River (하천 현장 실험 재현을 위한 수리모형 장치 제작)

  • Chun, Il Young;Kim, Ki Chul;Lee, Jung Lyul;Suh, Kyung Suk
    • Journal of Radiation Industry
    • /
    • v.2 no.3
    • /
    • pp.155-161
    • /
    • 2008
  • A hydraulic scale model was constructed to investigate the characteristics of flows and pollutant transport in laboratory. The distorted hydraulic scale model by assuming Froude similarity was adopted to represent hydrodynamics and dispersion in a river system. The scale model was composed of water reservoir, slope control part, booster pump, distributing plate and main channel. A constructed scale model will be used to present the overall concentration profiles of tracer and a research will be performed to convert the measured values using a hydraulic scale model to real field scale.

Improvement of Technical Proposal Tendering Evaluation Criteria for Small and Medium sized Construction Projects (중·소형 건설공사를 위한 기술제안입찰 평가기준 개선)

  • Yu, Jun-Hyeok;Hyun, Chang-Taek;Moon, Hyun-Seok;Son, Myung-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.1
    • /
    • pp.95-105
    • /
    • 2012
  • The government introduced the technical proposal drafting system in September 2007, as a new method to stimulate technical competence among construction companies to require ingenuity, creativity, artistic sense, and high-level technology. However, an examination of instances has shown that this system has been applied only to large scale constructions worth 30 billion won or more, and not to small and medium constructions worth less than 30 billion won. This is because the evaluation criteria of the system is structured in a manner that makes it difficult to apply to small and medium constructions. This study presented methods to improve the evaluation factors, categories, and scoring scheme of the technical proposal creation system for medium to small scale constructions to be able to further apply the current system to small and medium constructions. The technical proposal evaluation criteria presented in this study was significant in that it enabled the technical proposal creation system that was mainly used for large scale constructions to be further applied to medium to small scale constructions. And it also contributes to the establishment and settlement of a new technical proposal tendering for medium to small scale constructions.

The Improvement of Delivery System for International Sports Complex Facility (국제종합경기 시설공사 발주방법의 개선 방안)

  • Choi Yong-Ho;Lee Soo-Yong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2005.05a
    • /
    • pp.107-112
    • /
    • 2005
  • Renovation of existing sports facilities or construction of temporary ones for international complex games requires a wide variety of hundreds of sub construction projects to be awarded at the same time but there are few precedents required regarding the study of tendering process required in such cases. As award of construction contracts to build sports facilities for various international complex games is a critical determinant of fate of international complex games in the initial phase, it is very critical that adequate construction tendering process bedetermined. This research is aimed to study tendering cases for renovation or construction of critical international sports facilities to enhance efficiency of facility construction and define most reasonable tendering approach to satisfy schedule constraints often associated with international complex games and contribute to improvement of international competitiveness of their host cities and propose a direction for further development. This study also provides inputs to subsequent sports events of comparable scale to minimize trial and error.

  • PDF

The study for accidents prevention through the analysis of construction machinery-related accidents (건설기계로 인한 재해특성 분석을 통한 예방 방안)

  • Park, Yong-Kyu
    • Journal of the Korea Safety Management & Science
    • /
    • v.16 no.3
    • /
    • pp.71-79
    • /
    • 2014
  • The scale of construction industry recently tends to become bigger and larger in line with development of construction technologies and methods. Although increasing usage of construction machinery has led to improving productivity, reducing schedule and cost, constructions workers have been exposed to unstable work environment, causing more and more accidents. Construction machinery-related laws and regulations has not been enacted and reflected the conditions and circumstances of the construction industry in a timely manner. A various construction machinery and equipments produced and changed in structure randomly are so widely used that related-accidents may occure gradually. Propose a plan for accidents prevention through the analysis of characteristics and cases on construction machinery-related accidents over the past five years from 2009 to 2013.

The Corresponding Plan of Construction Management Enterprise for the Introduce of Construction and Technology Promotion Law with Delphi Method (Delphi 기법을 통한 건설기술진흥법 개정에 따른 CM사 대응방안에 관한 연구)

  • Kim, Sung-Sik;Park, Jung-Lo;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.121-122
    • /
    • 2012
  • It has been passed around two decades since the CM is introduced in December 1996. And 20 years have passed. Construction Technology Management Act is the enacted of 1987, since Independence Hall fire in 1986. In the meantime, basic background and operational rather than the development of regulations that skewed had a voice of concern. Accordingly, Ministry of land is promoting a full-scale revision that Construction Technology Promotion law as switching to promote and support the necessity from Regulatory and management-oriented paradigm. In this paper, according to the Construction and Technology Promotion law amended in the course of doing business, was conducting research for drawn counterstrategy through SWOT analysis that was not the side of owner but CM company.

  • PDF

Construction Conflict Risk Factors based on the Conflict Cost (분쟁청구비용을 고려한 건설 분쟁의 위험요인)

  • Shin Han-Woo;Soe Jang-Woo;Cho Hun-Hee;Kang Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2006.05a
    • /
    • pp.125-128
    • /
    • 2006
  • Since the diversification, complication of the construction industry, construction conflicts have been increased these days. Expansion of scale of construction has brought conflict treatment cost increase. Thus, needs of the study on construction conflict risk factors and its management is getting important. But the existing studies about construction conflicts and risk factors that need to be cared to decrease construction cost are almost focused on analysis of number of conflict proposed. It means those studies can be helpful when want to know how many conflict have been instituted, however, they do not contain a close examination between types of conflict and cost of conflict treatment. The purpose of this study, therefore, is an extraction of conflict causes based on the conflict treatment cost and the choice of significant risk factors to be managed to prevent conflict and its treatment cost, which enables reducing the conflict treatment colt on control the risk factors.

  • PDF

Delays and its Analysis: Indian Residential Construction Projects

  • Metha, Rakesh L.;Gaikwad, Suraj V.
    • Journal of Construction Engineering and Project Management
    • /
    • v.7 no.4
    • /
    • pp.20-28
    • /
    • 2017
  • In almost every construction project, delay is an inevitable yet controllable phenomenon. The Indian construction industry encounters an enormous amount of delays in projects. Delay affects both time and money in the forms of schedule and cost overruns, respectively. Due to impressive and dynamic growth in the Indian construction sector, planned efforts are essential to limit these undesirable delays. On account of the surge in the rate of residential building construction, the task of identification and analysis of the delays in residential projects in India has been attempted by the authors. A questionnaire survey was conducted involving 100 stakeholders. Further analysis included an Importance Index to rank the identified delays, Principle Component Analysis for advanced statistical analysis, and Correlation Analysis to check the extent of agreement amongst stakeholders. Conclusions drawn with reference to the analysed data eventually reflected finance-related issues, as well as labour related problems as the dominating causes of delays. The aim of the research is to provide insight to the construction stakeholders and researchers, on an international scale, with the obtained results.

RISK MANAGEMENT IN CIVIL CONSTRUCTION PROJECTS - FROM COST ESTIMATING PERSPECTIVE

  • Ashley Jaensch;Jian Zuo;Nicholas Chileshe
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.162-167
    • /
    • 2011
  • Construction projects are full of risks. This is particularly the case in civil construction projects that are often featured with large scale, complexity and involving a large number of participating parties. The eventuation of risks typically results in extended project durations leading to an increase in the total project budget. The consequence can be amplified considering the significant impacts of civil construction projects on the society, from economical, environmental and social perspectives. This research investigates the significance of risks within civil construction projects and approaches to deal with risks. Semi-structured interviews were undertaken with local industry practitioners in South Australia on this matter. It is found that the industry is fairly aware of risks associated with civil construction projects and subsequently has procedures in place to attempt to minimize the impacts of these risks on the project outcomes. The interview results also indicate that there is limited utilization of software for the risk management purpose from the cost estimation perspective.

  • PDF