• 제목/요약/키워드: Construction quality control

검색결과 872건 처리시간 0.03초

건설자재 현장품질관리 지침 개발을 위한 실태조사 (A Survey for a Development Construction Materials' Construction Site Quality Control Guide)

  • 고은주;고은정;석호중;이승혁
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2008년도 춘계 학술논문 발표대회
    • /
    • pp.1-5
    • /
    • 2008
  • The purpose of this study is to ensure an amicable material quality control in the construction site through investigating a process which can impact the construction material quality. For it, a worker interview and questionnaire survey was conducted through a direct field visit. The visited construction sites are composed of 79% construction site and 21% engineering site. As the respondents of questionnaire survey, the quality control workers were 72% of total respondents. Next, the construction worker, handymen, field representatives and others formed 7%. The interview with the quality control staff was conducted with the items including the construction site quality control guide, incoming inspection and material management. Through this survey, the problems of quality control by progress phase were derived. It could be known that the management and measures by each phase were urgently required. It also was indicated that a selection of low-priced material caused by low price bidding could badly impact the construction and safety. Also, in relation to the opinions such as the insufficient quality control and heavy work-load, the improvements are required. For the effective quality control in the construction site, the material quality control procedures suitable for the phase of construction progress must be presented in the present quality control. Also, the standards for it need to be established.

  • PDF

투수콘크리트 현장품질관리 지침서 개발에 관한 연구 (A Study of Developing Guides for the Construction Site Quality Control of Porous Concrete)

  • 고은정;고은주;석호중;이승혁
    • 한국건축시공학회지
    • /
    • 제9권3호
    • /
    • pp.65-71
    • /
    • 2009
  • General criteria for the quality of porous concrete have not been established yet in Korea. And yet, pavement and construction have been performed. In this paper, guidelines on the construction site quality control of porous concrete were developed in order to establish criteria for resolving the issues and problems of porous concrete, to establish methods for improving poor performance, and to manage porous concrete more systematically. In addition, a guide for the construction site quality control of porous concrete, which was appropriate for reality, was developed by researching several quality control guides and maintenance at construction sites. The guide consists of a total of nine chapters such as Application Range, Overview, the Structure of Porous Concrete, the Design of Package Thickness, Package Materials for Porous Concrete, Construction Methods, Quality Assurance and Inspections, Construction Site Quality Control, and Maintenance. It describes quality control guidelines in all steps such as methods for transporting porous concrete from the factory to the construction site, cautions for construction work at construction sites, maintenance, and management. The Guide for the Construction Site Quality Control of Porous Concrete is expected to ensure the quality of porous concrete, to reduce national costs for quality assurance, and to help ensure the health and safety of Korean people.

ICT-BIM 기반 건설프로젝트 품질부적합 관리 시스템 (ICT-BIM based Quality Nonconformity Control Method for Construction Project)

  • 손상혁;이형국;배상희;이동은
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2016년도 춘계 학술논문 발표대회
    • /
    • pp.76-77
    • /
    • 2016
  • This paper presents an automated construction quality nonconformity control method. Existing quality control process are confined attributed to the dependence on human quality personnels. They are inefficiency for continuos quality improvements and may cause project schedule delays when any nonconformity is handled timely fashion. For sure, It is important to identify the add hoc quality nonconformity control processes and to implement them into an automated system that controls its' work-flow. It would be desirable to develop the construction project quality nonconformity control system using Building information modeling(BIM) and Information and Communications Technologies(ICT). It may provide an effective platform to prevent quality issues that exist in the existing quality management practice.

  • PDF

QUALITY MANAGEMENT OF ECOLOGICAL ENGINEERING

  • Ying-Mei Cheng;Been-Jyh Yu
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1216-1222
    • /
    • 2009
  • Ecological Engineering (EE) refers to all sustainable engineering that can reduce damage to ecosystems and that adopts ecology as a base and safety as an orientation in order to implement conservation of biodiversity and sustainable development. In short, EE attempts to safeguard the ecological environment while any essential construction projects proceed. EE encompasses many fields, including construction skills, ecosystem preservation, landscape, and even related cultures and so on. Such variety results in greater complexity of construction, and, consequently, indirectly increases the difficulty of construction quality control. The objective of our research is to explore a promising model for EE via an extensive literature survey. This model includes three principal stages: plan-design, construction, and maintenance, along with individual accompanying phases concerned with quality control and vital management. In this article, a river restoration example is adopted to describe in detail the critical points of quality control in the three stages (plan-design, construction, and maintenance) of the construction life cycle. This study proposes an integrated structure for quality management of EE to guarantee its quality and to enhance its core applications in order to achieve long-lasting preservation of the environment.

  • PDF

DEVELOPMENT OF ARCHITECTURAL DESIGN QUALITY CONTROL REQUIREMENTS BASED ON OPEN BIM

  • Inhan Kim;Jungsik Choi;Junho Choi
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.426-432
    • /
    • 2013
  • The construction industry consists of various and massive architectural information as an architectural process includes a variety of design stages with cooperation of many disciplines. Particularly, architectural information is generated and managed through the life cycle of a building, from conceptual design stage to the construction and maintenance. A Building Information Model (BIM) serves as a shared knowledge resource for information about a facility forming a reliable basis for decisions during its life-cycle from inception onward. BIM technology accomplished quantitative development being utilized in various disciplines. However, it is necessary to develop environment and requirement for qualitative improvement of BIM based project. Particularly, requirement is very important for architectural design evaluations. The purpose of this study is to develop and apply of quality control requirement for improving the quality of architectural design in open BIM environments. To achieve this purpose, the authors have investigated case study for open BIM data quality control (software, guideline and application case) and classified quality control targets according to physical/logical quality and data quality. In addition, the authors have defined open BIM based quality control process and developed quality control requirements. Finally, the authors have developed rule based quality check system using requirements for efficient quality control based on open BIM.

  • PDF

IPA 분석을 통한 3차원 스캐닝의 모듈러 건축 프로젝트 품질관리 적용에 관한 연구 (An IPA-based Evaluation of 3D Scanning Technology Application for Quality Control in Modular Construction Projects)

  • 이정훈
    • 한국건축시공학회지
    • /
    • 제24권4호
    • /
    • pp.471-482
    • /
    • 2024
  • 모듈러 건축은 스마트 건설방법 중 하나로 건설산업 혁신을 위한 필수적인 공법이 되고 있다. 모듈러 건축의 스마트 건설 실현에 필요한 가장 기초적인 전제 조건 중 하나가 품질관리이며 이를 위해 3차원 스캐닝을 이용한 품질관리 방안에 대한 관심이 높다. 본 연구는 모듈러 건축 프로세스 단계별(공장제작, 운송, 현장시공) 주요 공사를 대상으로 IPA분석을 통해 3차원 스캐닝을 이용한 모듈러 건축물의 품질관리에 대한 현황을 분석하고 이를 개선하기 위한 방안을 제시하였다. 그 결과, 대부분의 항목에서 3차원 스캐닝 데이터 활용에 대한 필요성과 중요성이 높다는 것을 확인할 수 있었으며, 일부 현장 적용성이 낮은 항목들에 대해서는 추후 기술개발 및 적용성 개선이 필요한 것을 알 수 있었다. 본 연구결과는 향후 모듈러 건축 품질관리를 위한 첨단 시공 기술 적용에 대한 연구에 활용할 수 있다.

컴팩션 그라우팅 공법의 품질관리 시스템 개발 및 신뢰성 검증 (Development and Reliability Verification of Quality Control System for Compaction Grouting Method)

  • 서석현;이정상;정의엽;박상영;이효범
    • 한국지반신소재학회논문집
    • /
    • 제19권4호
    • /
    • pp.11-20
    • /
    • 2020
  • 본 연구에서는 연약지반의 개량 및 부등침하가 일어난 건물의 복원 등에 사용할 수 있는 컴팩션 그라우팅 공법을 소개하였다. 기존 컴팩션 그라우팅 공법에서 사용되는 펌프는 1공씩 주입하는 시스템으로 시공 효율성이 저하되고,아날로그 주입방식으로 현장 작업자가 수동으로 시공을 관리하여 일관된 품질관리가 어려웠다. 기존 시공에서의 문제점을 해결하기 위하여 펌프와 품질관리 시스템을 개발하였다. 품질관리 시스템은 주입재료의 자동 배합 시스템, 다중 동시 주입 펌프, 주입관리 모니터링 시스템으로 구성하였다. 현장 시험을 통해 품질관리 시스템의 성능을 검증하였고 컴팩션 그라우팅 공법의 시험시공 후 품질 시험을 통하여 지반개량 성능을 확인하였다. 따라서 개발된 통합 품질관리 시스템을 활용한다면 시공 및 품질 확인이 어려운 현장에서 일관된 품질의 보장과 시공의 효율성 및 안정성을 향상시킬 수 있을 것으로 기대된다.

건설공사(建設工事) 실무분석(實務分析)을 통한 조직관리(組織管理) 개선방안(改善方案) (The Improvement Plan of Organization Management Through the Survey of Actual Condition in Construction Work)

  • 최병주;최현;최석우;김옥규
    • 한국건축시공학회지
    • /
    • 제8권2호
    • /
    • pp.121-129
    • /
    • 2008
  • Domestic exoteric construction market by opening of world construction market with recent FTA of rapidly change. On these time, need quality increase of construction to possess government official and international competitiveness of customer satisfaction by offering consumer building of good quality. Therefore, must establish direction to inspects and must advance forward formation government official's present actual conditions for building company's QI. This study is as following if summarize studying result of formation government official to improve quality in construction spot. First, formation's CEO will for QI need side improvement the formation government official enemy by important thing. Second, at checking activity and systematic action that participate of responsible persons cooperation enterprise space-time by complete charge department organization should be achieved. Third, complete charge department for quality control operation large size construction firm substantially formation Organizational well operate, but heavy hydrogen building company was construed by greatly unprepared misgovernment. AHP analysis result complete charge department is serious necessity, and the CEO under direct control organizational structure was construed by thing which can bring excellent effect in operation management side of quality business side and formation. Therefore, heavy hydrogen building company should does to occupy competitive power high position with tissue at active quality complete charge deputy.

철근작업자의 품질기준 인지 실태 조사 (A Study on the Actual Conditions of Quality Standards Recognition of Rebar Workers)

  • 이병윤;최오영;한병민;김광희
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2009년도 춘계 학술논문 발표대회 학계
    • /
    • pp.243-246
    • /
    • 2009
  • Importance of quality control is gradually increasing in the construction. And the reber work is very important things which influence in safety and durability of the building and accounts for about 9.8% of the total cost. Although reber work is important, quality control of the rebar work is still performed by attitude and experience of worker. Therefore, it is very important to quality achievement effort and quality standards recognition of rebar worker for quality sophistication in the construction. Some papers have dealt with the quality control in construction. But there was no study for actual conditions of quality standards recognition of rebar workers. The purpose of this study is to survey the actual conditions of quality standards recognition of rebar workers and to analyze difference of consciousness of administrator and worker. The result are : there id difference of consciousness of worker and administrator, workers work without knowing quality standard.

  • PDF

건설공사 품질확보를 위한 품질관리 관련자의 역할 및 호칭 정립 (The Establishment of Roles and Titles of Quality Control Personnel for Construction Project Quality Assurance)

  • 이창효;김병수
    • 대한토목학회논문집
    • /
    • 제37권5호
    • /
    • pp.871-878
    • /
    • 2017
  • 건설공사의 품질관리 관련자는 품질관리계획 또는 품질시험계획을 수립 및 시행하고 공정에 따라 사용 자재의 적격 여부 확인, 시험 검사 장비의 관리, 품질교육, 자체 품질점검 및 조치, 부적합 제품 공정에 대한 지도 관리 및 품질시험 등을 시행하고 부실공사를 방지하여 사고를 예방하는 중요한 역할을 담당하고 있다. 그러나 관련기관은 품질관리 관련자에 대하여 관련 법 규정의 개정 시 시험요원, 품질관리자 등으로 호칭을 변경하면서 품질시험과 품질관리 업무에 대한 역할분담을 명확하게 제시하지 않았으며, 건설공사의 품질관리비 산정 및 인건비 적용 등에 혼란을 유발하였다. 따라서 이를 개선하기 위한 연구가 필요하다. 본 연구에서는 품질관리 관련자에 대하여 모호한 호칭관계를 관련 법 규정 등을 토대로 건설공사의 요구사항을 충족할 수 있도록 개선하고, 각각의 역할 및 호칭에 대하여 '품질시험자'와 '품질관리자'로 구분한다. 즉, 건설공사 품질관리 업무지침에서 규정한 "건설공사 품질시험기준"의 품질시험을 실시하는 자를 '품질시험자'로, 건설기술 진흥법 시행규칙에서 규정하는 품질관리계획 수립 및 시행업무를 수행하는 자를 '품질관리자'로 호칭하도록 규정한다.