OPPORTUNITIES FOR IT IN CONSTRUCTION INDUSTRY OF IRAN

  • A. Hemmati;Kheyroddin
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.424-432
    • /
    • 2007
  • The last twenty-five years have seen dramatic improvements in and widespread use of IT to describe and document the work of the many disciplines involved in construction projects. Iran is a developing country and construction is a basic factor of developing too. Hence, the country needs to a special programming for construction of buildings, structures and infrastructures. Many parts of Iran are located in highly seismic zones and structures must be constructed safe e.g., according to recent seismic codes. In this paper opportunities of IT in construction industry of Iran are investigated in three categories. Pre-construction phase, construction phase and earthquake disaster mitigation are studied. Studies show that information technology can be used in these items for reducing the losses and increasing the benefits. Both government and private sectors must contribute to this strategic project for obtaining the best result.

  • PDF

Analysis on Constructability Information and Design Elements by Construction Engineering Task at the Design Phase - Concentrated on Temporary Work in High-rise Building Projects - (설계단계 시공엔지니어링 업무별 주요 시공성 정보 및 설계요인 분석 - 고층 건축 프로젝트의 가설공사를 중심으로 -)

  • Lee, Jin Woong;Kim, Taehoon;Cho, Kyuman
    • Journal of the Regional Association of Architectural Institute of Korea
    • /
    • v.20 no.6
    • /
    • pp.97-104
    • /
    • 2018
  • Recently, as the shape and function of high-rise buildings have become more complex, engineering for reflecting the constructability in the design phase has the increasing importance. However, engineering tasks are not performed at the appropriate level and timing in most projects, which leads to inefficient work such as design changes and reworks. Hence, this study investigated the constructability knowledge, design elements, and supporting tools required to conduct engineering tasks related to temporary work at the design phase, and also analyzed the relationship between these factors using the correlation analysis. As a result, when the engineering tasks are applied in the design phase, constructability knowledge related to 'construction method and process' is the most important and the design factor related to 'layout/arrangement' should be considered as the most important factor. Based on the results of this study, the project participants can efficiently use necessary constructability knowledge during the design phase and facilitate effective decision-making and design alternatives for enhancing constructability.

A Quantity Prediction Model for Reinforced Concrete and Bricks in Education Facilities Using Regression Analysis

  • Lee, Jong-Kyun;Kim, Boo-Young;Kim, Jang-Young;Kim, Tae-Hui;Son, Kiyoung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.13 no.5
    • /
    • pp.506-512
    • /
    • 2013
  • Since the amendment of the law on the private sector investment in social infrastructure in January of 2005, the government has been actively promoting Build-Transfer-Lease (BTL) projects. Notably, most new educational facilities have been built as BTL projects. For these facilities, the unit cost per unit area has been applied to predict construction costs. However, since construction costs are mostly managed after the detailed design phase, the costs can be estimated incorrectly. For this reason, cost management is needed in the planning phase, with a sound approximate estimate to prevent the wasteful use of funds. To address this shortcoming, this study aims to develop a quantity prediction model for education facilities using regression analysis in the planning phase. The developed model is focused on the required quantities of reinforced concrete and bricks. In order to achieve the objective, the data of 44 educational facility projects collected from Gyeonggi-do was used in the regression model. This study can be utilized by major stakeholders to accurately predict construction costs by estimating the appropriate quantities of reinforced concrete and bricks in the planning design phase.

A Production-Installation Simulation Model of Free-Form Concrete Panels

  • Lim, Jeeyoung;Lee, Donghoon;Na, Youngju;Lim, Chaeyeon;Kim, Sunkuk
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.401-404
    • /
    • 2015
  • Demand on free-form buildings is gradually increasing, yet owing to the difficulty of production-installation work, several problems occur in the construction phase upon construction of a building, including the increased cost and construction duration, and reduced constructibility. To solve these problems, a techonology to produce FCP using a CNC(Computerized Numeric Control) machine is developed. The technology is that the information of designed free-form buildings to the CNC machine is transferred, and the transferred information is used for RTM(Rod-Type Mold, the mold shaped by back-up rods) and PCM(Phase Change Material) shaping, and the shaped RTM and PCM have the role of molds to produce FCP. Construction duration and project cost are limited in building sites, so the efficiency of processes like production-installation of FCP for application of the technology is significant. Since it is almost impossible to change the production-installation process at the construction phase when they are established, process should be deliberately decided. Therefore, the purpose of the study is to propose a production-installation simulation model of free-form concrete panels, in aspect of PCM. This paper is establishing the process for production-installation of FCP, estimating time required by each construction type and proposing a time simulation model that changes according to various constraints based on the analyses. With the time simulation model, it will be possible to build a cost model and to review the optimal construction duration and project cost.

  • PDF

Selecting Optimum Management Practicesin Pre-construction Phase Considering Project Characteristics

  • Cha, Hee-Sung;Kim, Ki-Hyun;Ko, Young-Jin
    • Journal of Construction Engineering and Project Management
    • /
    • v.2 no.1
    • /
    • pp.1-4
    • /
    • 2012
  • The importance of project performance management as an alternative for solving problems is rising, which are followed by the hardships of managing construction project in the construction industry. This research classifies and applies the improvements made by the operator's work, in order to apply factors of success on the construction project, as performance management factors. In addition, in order to predict the results reflecting the project characteristic of performance management factor un-improvable by the operator in the initial stage of construction, the effect of project characteristic to the performance was drawn by performance difficulty. Also, in order to improve the predicted performance, researches on setting valid best practices according to the performance territory through a correlation analysis between the best practices improvable through the operator's work, and the performance was made.

AN APPROXIMATE COST ESTIMATING MODEL FOR CONSTRUCTION PROJECTS

  • Daehee Lim;Seung-hoon Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1242-1247
    • /
    • 2009
  • The sudden changes in the construction market and the progressively intensifying price wars have amplified the importance of the construction cost estimation in the initial and planning phases of construction projects. However the methodologies and process of estimating construction cost in the planning and design phase are not standardized in the domestic market, in contrast to the markets of more developed countries. Therefore this paper proposes a new approximate estimation model to be used from the initial stages of construction projects. This methodology that extracts, modifies and synthesizes comparable elements of previous cases. This will introduce the foundation for the implementation of systems with improved usability and applicability.

  • PDF

Influence of Climate Change on the Lifecycle of Construction Projects at Gaza Strip

  • El-Sawalhi, Nabil;Mahdi, Mahdi
    • Journal of Construction Engineering and Project Management
    • /
    • v.5 no.2
    • /
    • pp.1-10
    • /
    • 2015
  • There is a high confidence based on scientific evidence that climate is changing over time. Now climate change is considered as one of the challenges facing the construction industry. As no project is risk free and climate change has a strong impact on the different phases of the construction project lifecycle. This research aimed at providing a platform of knowledge for the construction management practitioners about the impacts of climate change on the construction projects lifecycle, identify the most dangerous climate change factors on the construction project lifecycle, and identify the most affected phase by climate change factors through the construction projects lifecycle. The study depended on the opinions of civil engineers who have worked in the construction projects field among the reality of Gaza Strip. Questionnaire tool was adopted as the main research methodology in order to achieve the desired objectives. The questionnaire included 127 factors in order to obtain responses from 88 construction practitioners out of 98 representing 89.79% response rate about the influence of climate change on the generic lifecycle of construction projects. The results deduced that the most significant influence on the construction project lifecycle was related to the extreme weather events, rainfall change, and temperature change respectively. There was a general agreement between the respondents that the most affected phase by temperature, rainfall, and extreme weather events is the execution phase. The results also asserted with a high responses scale on the need to alternative procedures and clear strategies in order to face the climate change within construction industry.

The Case of CM as Applied to the Pre Design Phase - Focused on the Case of YongJu New Tobacco Manufacturing Plant - (설계 전 단계에서의 CM 적용 사례 - 영주 신 제조창 CM 사례를 중심으로 -)

  • Park Yong-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.19-26
    • /
    • 2003
  • In the face of the deterioration of tobacco manufacturing plant, we've got the plan for now manufacturing factory for the competitiveness, modernization, rationalization and environment. To achieve the goals, it was necessary to plan and investigate in the early stage of project. Consequently. We determined to introduce the CM in the early stage. We Performed the whole phase of CM services front the pre design phase services like feasibility analysis of site and building, plant master plan, selection of manufacturing facilities and drawing up the RFP, to maintenance management phase after the completion of a construction work. Contrary to the another CM projects, YongJu New Tobacco Manufacturing Plant CM organized the CM team with expert in field before the design development. This study analyze and evaluate the CM services of YongJu project which performed on the pre design phase. The purpose of this study is to emphasize the importance of pre design phase CM and support that CM services will start from the pre design phase.

  • PDF

Scheduling Risk Management at the Preconstruction Phase (공사 착공 전 단계의 공정리스크 대응방안)

  • Park Ji-Hoon;Kim Sun-Kuk;Han Choong-He
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.457-461
    • /
    • 2004
  • The insufficient management o( the risk of preconstruction phase causes the risk of construction phase so it makes bad effects such as the extension of construction time and raising of cost. Therefore, the management of the risk of preconstruction phase is being considered as an important element of success of project and the competitive power of construction companies. This study Is to suggest solution methods for each progress after examining reasons of the risk for the management of the risk of preconstruction phase 1'he progress is limited as earth work, RC work, steel work and curtain wall work. Through the introduction of Knowledge Management system, work flow is made by specialist of each part. The reasons of the risk of progress are chosen through the analysis of work flow and I suggest detailed solutions such as person in charge, the starting point of progress and the information of requirements according to the grade of importance about elements of the risk

  • PDF

A Study on Competency Evaluation Item of Design Phase VE Team (설계VE팀의 역량 평가항목에 관한 연구)

  • Seo, Ha-Na;Lee, Hak-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.797-800
    • /
    • 2007
  • Value Engineering(VE) is being applied as an useful tool to eliminate the waste of cost and noneffective factors previously in construction projects. Ministry of construction and transportation' has been accordingly enforcing extensionally design phase VE to the construction costing more than 10 billion won, an importance of design phase VE. Although there are legal supports and technical effects, an effect about an introduction of design phase VE can not be applied properly because of several problems at the process. So, in this study, try to find out competency factors of design phase VE to enforce a competency of VE team as a basic database for developing a check list, and estimate weight. For the result, find out a competency evaluation item and organize as a team knowledge, a team work skill and a team attitude. Perform a first survey to verify a reliability and propriety regarding the found competency evaluation, perform the second survey competency as to evaluation item of the found 1, 2, 3 class and then estimate the weight by AHP.

  • PDF