• Title/Summary/Keyword: Construction operation process

검색결과 592건 처리시간 0.018초

도시철도 도면 관리에 관한 연구 -서울시 도시철도공사를 중심으로- (A study on the management of drawings of Metropolitan Rapid Transit)

  • 김미연
    • 기록학연구
    • /
    • 제11호
    • /
    • pp.181-214
    • /
    • 2005
  • Metropolitan rapid transit system plays an essential role in the public transportation system of any large city, and its managing agency is usually charged with the responsibility of storing and managing the design drawings of the system. The drawings are important and historically valuable documents that must be kept permanently because they contain comprehensive data that is used to manage and maintain the system. However, no study has been performed in Korea on how well agencies are preserving and managing these records. Seoul Metropolitan Rapid Transit Corporation(SMRT) is the managing agency established by the city of Seoul to operate subway lines 5, 6, 7, and 8 more efficiently to serve its citizens. By the Act on Records Management in Public Institutions(ARMPI), SMRT should establish a records center to manage its records. Furthermore, all drawings produced by SMRT and other third party entities should be in compliance with the Act. However, SMRT, as a form of local public corporation, can establish a records center by its own way. Accordingly, the National Archives & Records Service(NARS) has very little control over SMRT. Therefore, the purpose of this study is to research and analyze the present state of storage and management of the drawings of metropolitan rapid transit in SMRT and is to find a desirable method of preservation and management for drawings of metropolitan rapid transit. In the process of the study, it was found that a records center is being considered to manage only general official documents and not to manage the drawings as required by ARMPI. SMRT does not have a records center, and the environment of management on the drawings is very poor. Although there is a plan to develop a new management system for the drawings, it will be non-compliant of ARMPI. What's happening at SMRT does not reflect the state of all other cities' metropolitan rapid transit records management systems, but the state of creation of records center of local public corporation is the almost same state as SMRT. There should be continuous education and many studies conducted in order to manage the drawings of metropolitan rapid transit efficiently by records management system. This study proposes a records center based on both professional records centers and union records centers. Although metropolitan rapid transit is constructed and managed by each local public corporation, the overall characteristics and processes of metropolitan rapid transit projects are similar in nature. In consideration of huge quantity, complexity and specialty of drawings produced and used during construction and operation of metropolitan rapid transit, and overlap of each local public corporation's effort and cost of the storage and management of the drawings, they need to be managed in a professional and united way. As an example of professional records center, there is the National Personnel Records Center(NPRC) in St. Louis, Missouri. NPRC is one of the National Archives and Records Administration's largest operations and a central repository of personnel-related records on former and present federal employees and the military. It provides extensive information to government agencies, military veterans, former federal employees, family members, as well as researchers and historians. As an example of union records center, there is the Chinese Union Dangansil. It was established by several institutions and organizations, so united management of records can be performed and human efforts and facilities can be saved. We should establish a professional and united records center which manages drawings of metropolitan rapid transit and provides service to researchers and the public as well as members of the related institutions. This study can be an impetus to improve interest on management of not only drawings of metropolitan rapid transit but also drawings of various public facilities.

국가직무능력표준(NCS)에 근거한 조경분야 교육과정 개발 방법론 - 갭분석을 중심으로 - (A Methodology to Develop a Curriculum based on National Competency Standards - Focused on Methodology for Gap Analysis -)

  • 변재상;안성로;신상현
    • 한국조경학회지
    • /
    • 제43권1호
    • /
    • pp.40-53
    • /
    • 2015
  • 산업현장의 변화와 요구에 부응할 수 있는 인력을 체계적으로 양성하기 위하여 2001년에 국무조정실을 중심으로 NCS(National Competency Standards, 이하 NCS)와 국가자격체제(National Qualification Frameworks, 이하 NQF)의 도입이 결정되었다. 건설분야 내 조경 역시 2008년 "국가직무능력표준(NCS) -조경"이 시범 개발되어 2009년부터 3년간 시범운영되었다. 특히 2013년 출범한 박근혜 정부의 주요 국정과제 중 하나로 '학벌이 아닌 능력 중심의 사회 구현'이 채택되면서, 이를 실천하기 위한 구체적인 수단으로 NCS 체제 구축이 전국적으로 확산되고 있는 시점이다. 그러나 국가에서 개발한 NCS의 경우, 이상적인 직무수행능력을 명시하였기 때문에 각 대학의 학생수준의 차이, 기자재와 교수들의 확보문제, 현행교육과정의 시수 문제 등 실질적인 운영상의 문제점을 반영하지 못한 단점이 있으므로, 이를 현실적인 교육과정에 연착륙시키기 위해서는 현재의 교육과정과 NCS와의 차이 즉 갭(gap)을 명확히 분석하는 과정이 선행되어야 한다. 갭분석은 기존의 교육과정을 NCS 기반 교육과정으로 개편하기 위한 초기 단계의 방법론으로 NCS 능력단위별 능력단위요소와 수행준거를 기준으로 학과 내 기존 교육과정과의 괴리도 혹은 일치 정도를 1에서 5까지 리커트 척도를 활용하여 기입한 후 분석하는 방법이다. 이처럼 현재의 대학 내 교육과정과 NCS와의 일치 및 괴리 정도를 측정함으로써 향후 NCS 운영을 희망하는 대학에서는 NCS의 적용 가능성과 개발 운영 이후의 효과성을 검증할 수 있는 기초 도구를 확보할 수 있다. 갭분석을 통한 교육과정 개편의 장점으로는 첫째, 정부의 재정지원 사업과 연계하여 정성적인 학과별 NCS 도입률에 대한 정량적 지표를 제공할 수 있으며, 둘째, NCS 기반 교육과정 개편 시 부족한 혹은 포화상태인 부분에 대한 객관적인 기준을 제공해 준다. 즉, 해당 NCS 세분류 도입 시 부족한 능력단위 및 능력단위요소를 추출할 수 있으며, 기존 과목별 능력단위요소별로 보완 사항도 추출할 수 있는 동시에, 이를 통한 상세 강의계획서 및 기초 교과목 개설을 위한 방향성을 제시해 주는 장점이 있다. 다만, 현재까지 개발된 갭분석의 이론을 보완하여 보다 체계적으로 정비해야 하는 과제는 남아 있다. 교육부, 고용노동부는 산업현장의 요구를 교육훈련 및 자격에 체계적으로 반영하기 위해 관련 산업계 인사들이 모여 실무적인 차원에서 NCS 표준을 적극적으로 개발하고 보급하여야 하며, NCS 적용을 희망하는 대학에서는 일과 자격이 연계될 수 있는 교육과정을 NCS 기반으로 개편하여야 할 것이다. 이를 위해 대학에서는 관련 산업 전망 및 대학 내 교수자원과 지역 산업과의 관련성을 고려하여 적용하고자 하는 NCS 세분류를 명확히 선정하여야 할 것이다. 이후 NCS 기반 교육과정 개편을 위해 갭분석을 사용하여 개편의 방향과 기준을 보다 객관적이고 합리적으로 수립하여 교육과정명세서에 대한 명확한 논리적 근거를 확보하고 있어야 과정이수형 자격제도에 효율적으로 동참할 수 있을 것이다.