• Title/Summary/Keyword: Construction operation plan

Search Result 425, Processing Time 0.029 seconds

A Study on the Generation of Crew Scheduling Diagram Using Neighborhood Search Method for Improving Railway Operation Management (철도 운영관리 효율화를 위한 이웃해 탐색기법을 사용한 승무다이아 생성방안)

  • Lee, Jaehee;Park, Sangmi;Kang, Leenseok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.5
    • /
    • pp.42-51
    • /
    • 2019
  • The train operation institution establishes a transportation plan based on the forecast of transport demand and the ability of train vehicles to transport, and establishes a train operation plan accordingly. The train operation plan adjusts the intervals between trains, creates a timetable (train diagram) for trains, and establishes a plan for the operation of train vehicles used for train operation. The train operation institution shall establish a crew schedule to determine and place the crew members of the trains arranged in the diagram in order to enhance the efficiency of the operation management of the trains. In this study, the authors apply the neighborhood search method that satisfies the constraints at the phase of generating the crew diagram. This suggests a methodology for efficient management of crew schedule plan. The crew diagram generated in this study compared with the existing crew diagram in accordance with the actual operating train timetable, and verified the effectiveness of the suggested method.

A Study on the Improvement of Interoperability Construction Process (BIM 건설정보 상호운용성 개선에 관한 연구)

  • Oh, Jeong-Keun;Ha, Ran
    • Journal of KIBIM
    • /
    • v.4 no.2
    • /
    • pp.10-16
    • /
    • 2014
  • Interoperability in the BIM construction information is the information management technology, which allows user to control and effectively use construction's lots of information that occur and disappear through construction life cycle. And it is information interchange through accurate and rapid decision-making to get the participants' wanted value. In this study, we will present plan to improve productivity and quality through effective BIM operation. And we will present improvement plan after deduce existing process's problem.

Development of Tunnel Asset Management (TAM) Program

  • Hamed Zamenian;Dae-Hyun (Dan) Koo
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.576-582
    • /
    • 2013
  • Typical highway infrastructure systems include roadway pavement, drainage systems, tunneling, and other hardware components such as guardrails, traffic signs, and lighting. Tunnels in a highway system have provided significant advantages to overcoming various natural challenges including crossing underneath bodies of water or through mountainous areas. While only a few tunnel failure cases have been reported, the failure rate is likely to increase as these assets age and because agencies have not emphasized tunneling asset management. A tunnel system undergoes a deterioration life cycle pattern that is similar to other infrastructure systems. There are very few agencies in the United States implementing comprehensive tunnel asset management programs. While current tunnel asset management programs focus on inspection, maintenance, and operation safety, there is an increasing need for the development of a comprehensive life cycle tunnel asset management program. This paper describes a conceptual framework for a comprehensive tunnel asset management program. The framework consists of three basic phases including a strategic plan, a tactical plan, and an operational plan to provide better information to the decision makers. The strategic plan is a basic long term approach of tunnel asset management. The tactical plan determines specific objectives and the operational plan actually applies asset management objectives in practice. The information includes operational condition, structural condition, efficiency of the system, emergency response, and life cycle cost analysis for tunnel capital improvement project planning.

  • PDF

A Study on the Way of Operation of EMU in Suwon-Incheon Line (수인선의 전동열차 운영방법에 관한 연구)

  • Kim, Heui-Kon;Oh, Jong-Eop;Lee, Weon-Soon;Shin, Tack-Hyun
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.1859-1870
    • /
    • 2009
  • Suin line is expected to be opened completely in 2015 by three stages. And the line between Suwon and Incheon(54.0km) is under construction to supply the users of southwestern area transportation convenience. The route of Suin line will be constructed to share partly with Ansan line and connect directly with Bundang line to the east and Kyeongin line to the west. That's why a lot of difficulty in train and rolling stock operation IS expected. This paper proposes an alternative plan of train operation when the line is opened partly and completely and makes an optimally alternative plan through the analyses of transportation demand, the change of human resources of operation sector according to train operation plan by an alternative proposal and operation cost.

  • PDF

An advanced nation's case study considering integrated control for construction work quality.safety.environment (건설공사 품질.안전.환경 통합관리를 고려한 해외 사례 고찰)

  • Kim, Dong-Hee;Kim, Woon-Soo;Jeong, Han-Gyo;Noh, Joung-Won
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.819-823
    • /
    • 2008
  • Currently, the quality management, safety management and environment management of domestic construction work does not form a infrastructure for integrated control which have been developed according to the unique characteristics based on respective the law. In other words, the quality manager and safety manager of human resources is set to a legal arrangement personnel, but environment manager of human resources is not. In addition, quality management standard is to perform the work to PDCA(Plan-Do-Check-Action) system which is reflected in all of the requirements of KS A ISO 9001 standard, but safety management plan and hazard harmfulness prevention plan are not properly reflected P(Plan), C(Check) and A(Action) system and focusing on only 4 section Do(D) in KOSHA 18001 standard requirement. Moreover environmental management plan is not even established requirement. Through examining the operation practices of an advanced nation prior to building the integrated control standard for construction work qualify safety.environment, the possibility of applying domestic is reviewed, and then this study is going to research the operation practices of Singapore.

  • PDF

A Strategy of Technology Development for the Railway System based on Railway Network (철도망 구축을 고려한 철도시스템의 기술개발전략)

  • Lee Hi-Sung
    • Journal of the Korean Society for Railway
    • /
    • v.9 no.3 s.34
    • /
    • pp.319-324
    • /
    • 2006
  • Studied was a strategy of technology development for railway system in terms of railway network. First, The successful launch of the Korean HST system has not only decreased logistics burden but also significantly transformed the Korean trunk-line railway network, revolutionizing the logistics and technology sectors and reinvigorating the Korean railway industry in one century. Korean railway industry sector is now investing to develop many different types of railway system(G7, Post G7, tilting train...) so that these kinds of various railway system development should be integrated with the National Inter-modal Transportation Network Plan. To secure sufficient capacity that is required by the National Railroad Plan, the railway industry needs to establish mid- and long-term train purchase and operation strategies in compliance with railway construction and operation policies. During a railway construction planning, train operators, based on their train operation strategies, should come up with measures to closely cooperate with project operators from the planning stage through to the opening of a railway system. To be more precise, train operators should establish long-term train procurement plans reflecting both long-term national railroad network plans and plans for each railway line in order to suggest appropriate roles and schedules for each line. Also, based on the long-term railway plan, directions should be decided concerning the research and development of trains in advance.

Construction Equipment Fleet Optimization for Saving Fuel Consumption (에너지 절감을 위한 건설장비 조합 최적화 방법 연구)

  • Yi, Chang-Yong;Lee, Hong-Chul;Lee, Dong-Eun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.198-199
    • /
    • 2015
  • Construction equipment is a major energy consumption source in construction projects. If 10% reduction of the diesel fuel usage is achieved in the construction industry, it may reduce 5% of the total energy usage. Energy saving operation is a major issue in equipment-intensive operations (e.g., earthmoving or paving operations). Identifying optimal equipment fleet is important measure to achieve low-energy consumption in those operations. This study presents a system which finds an optimal equipment fleet by computing the low-energy performance of earthmoving operations. It establishes construction operation model and compares numerous combinations using alternative equipment allocation plans. It implements sensitivity analysis that facilitates searching the lowest energy consumption equipment fleet by enumerating all cases.

  • PDF

A Study on the Plan for Advanced Noise-Policy in the 21st Century (21세기 소음정책 선진화 방안 고찰)

  • Yang, Geun-Ho;Park, Young-Min;Lee, Nae-Hyun;Chang, Yoon-Young
    • Journal of Environmental Impact Assessment
    • /
    • v.18 no.1
    • /
    • pp.21-30
    • /
    • 2009
  • The study show that things about the noise control are indicated at The Noise & Vibration Control Act and the other Act. Also, the details program and total government ministries' program for the noise control are indicated what are the advance noise control plan. The study consist of the four part which are "Draw up the environmental noise infrastructure plan; the install shall be done the noisemap & the automatic noise measurement devices", "Resetting of environmental noise standard at the application area and Introduce of indoor noise; the guide for region classification of the noise standard & indoor noise", "Setting of aircraft noise standard and Program of measurement point operation; the noise-assessment-standard shall change from WECPN to new index($L_{den}$, $L_{dn}$, $L_{Aeq\;24h}$) & the operation and control of aircraft noise measurement changes from local environmental office to central control center" and "The method of noise regulation at construction site and the plan on making of standard for vibration regulation; It shall be made that the guideline of construction noise should include a target-construction, noise standard etc & the ministries shall unify control about construction vibration of the blasting vibration". The advance noise-policy will improve efficiency to deal with civil appeal & damage on residents about noise.

Attributes for Developing a Database for Construction Information Interface

  • Moon, Sungwoo;Cho, Kyeongsu
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.673-673
    • /
    • 2015
  • Earthwork is an operation that provides space for structures, and it takes up a large portion of the construction costs in a construction project. In large-scale earthwork, numerous types of construction equipment are used in the operation. The types of equipment should be selected based on the field conditions and the construction methods. These construction vehicles are constantly changing positions during the earthwork operation. Therefore, the equipment operators require effective communication to ensure the efficiency of the earthwork operation. All equipment operators should exchange information with the other equipment operators. Information should be exchanged continuously to support decision making and increase productivity during the earthwork operation at the construction site. This paper investigates the attributes required for an information interface between construction vehicles during an earthwork operation. This paper 1) discusses the importance of an information interface for construction vehicles in order to increase productivity during an earthwork operation, 2) analyses the types of attributes that need to be communicated between construction vehicles, and 3) provides a database that has been built for attribute control. The database built for the information interface between construction vehicles will enhance communication between vehicle operators. Table I shows the typical attributes that should be shared between the excavator operator and the dump truck operator. This information needs to be shared among the operators, as it helps them to plan the earthwork operation in a more efficient manner. A database has been developed to store this information in an entity relation diagram. A user-interface display environment is also developed to provide this information to the operators in the construction vehicles. The proposed interface can help exchange information effectively and facilitate a common understanding during the earthwork operation. For example, the vehicle operators will be aware of the planned volume, excavated volume, transportation time, and transportation numbers. As a part of this study, mobile devices, such as mobile phones and google glasses, will be used as hands-on communication tools.

  • PDF

Research on Efficient Applicability Through Review on Standard for Selection of Construction Method for Railway Underground Crossing Transit (철도지하횡단 통과 공법 선정기준에 관한 검토를 통해 효율적인 적용성에 대한 연구)

  • Hwang, Young-Ho;Shon, Jung-Chul;Baek, Jong-Myeong
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.595-600
    • /
    • 2007
  • Greater expansion and more frequent operation of the railroad transportation system anticipated due to its characteristics including low cost, safety and mass transportation. Recently, effects on the railway structures due to expansion of newly constructed road, construction of subway, city gas pipeline, communication network, electric power network and construction of other railway underground crossing in accordance with urban planning and organization has influenced safe operation of trains. Accordingly, standard for selection of construction method that will enable construction of more economical and rational subway underground crossing structures by preventing problems occurring at the time of above construction works and accidents in safe operation of trains due to construction in advance is definitively necessary. Although there are numerous construction methods that can be applied at the time of construction of railway underground crossing, there are much difficulties in selection of appropriate construction method that considers characteristics of each construction method on non-excavation type construction method, train operation plan of number of operational routes and on-site circumstances. Therefore, this research aims to present rational standard for selection of construction method for such, and standard for slowdown speed and interception of train when passing the areas of slowdown in sectors under construction.

  • PDF