• Title/Summary/Keyword: Construction management standard

Search Result 881, Processing Time 0.028 seconds

Improvement of CM Fee Estimation Criteria for Efficient CM Service (건설사업관리업무 효율화를 위한 대가 산출기준 개선방향)

  • Cho, Youngjun;Sung, Youngmo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.2
    • /
    • pp.105-112
    • /
    • 2019
  • As the Construction Technology Promotion Act was revised in 2015, the term of Supervision was removed and Construction Management was included instead. The consideration of Construction Management shall be based on the cost plus fee method specified in the Criteria for the Cost of Construction Technology Services of the Ministry of Land, Infrastructure and Transport. Nevertheless, it is based on the construction cost ratio in accordance with the Economy and Finance Ministry's Detailed Guidelines for Preparing the 2018 Budget Plan and Fund Management Plan (Manual for Business Type and Item). As a result, it has been expected that Construction Management consideration will be calculated according to a single government standard and that the Criteria will be applied reasonably. In addition, although the change in the Labor Standard Act has a significant effect on the working environment of the construction site, the nature of the construction site is not considered in this Act. Based on these problems, the study suggested that the government should apply a single standard after consultation with the relevant agencies when calculating the consideration for Construction management, that the scope of the Criteria for the Cost of Construction Technology Services should be clear, that the amount of input by the Construction Manager should be considered for the capability of engineers and the number of working days, and that construction characteristics should be considered when determining the number of working days and hours.

A Study on Estimating Construction Equipment Annual Standard Operating Hours (건설기계 연간표준가동시간 산정에 관한 연구)

  • Lee, Joong-Seok;Huh, Young-Ki;Ahn, Bang-Ryul
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.1
    • /
    • pp.37-42
    • /
    • 2008
  • As use of construction equipment has been increasing continuingly, the proportion of equipment expense to the total construction cost has become higher. However, there is a difference between the equipment expenses section in 'Poom-Sam' and practical data, because 'Poom-sam' does not consider non-working days due to weather conditions, legal holidays and management conditions. Therefore, 'Poom-Sam' does not present a reasonable standard for estimating construction equipment expenses. In this study, to estimate realistic construction equipment operating hours, firstly, construction equipment was classified according to work, and weather conditions, in which each work could not be executed, were established. Then, weather data on Seoul and Busan($2004{\sim}2006$) and legal holidays were analyzed to suggest annual standard operating hours. The annual standard operating hours of earthmoving & excavating, compaction, and drilling equipment was estimated to be 1,430 hours, and lifting equipment, concrete paving equipment, asphalt paving equipment, concrete equipment, and crushing & conveying equipment were estimated to be 2,124 hours, 1,156hours, 1,188hours, 1,688hours, and 2,152hours respectively.

Standard and Guideline for Installation and Management of Earthquake Instruments for Each Facilities (시설물별 지진응답계측기 설치 운영에 관한 기준 및 지침)

  • 김재관
    • Proceedings of the Earthquake Engineering Society of Korea Conference
    • /
    • 2000.04a
    • /
    • pp.458-467
    • /
    • 2000
  • The standard of performance-based seismic design accepted by Ministry of Construction and Transport requires to install and manage earthquake instruments for the facilities of seismic category I and to acquire earthquake response data of these facilities at earthquake events. So detailed standard and guideline for installation and management of earthquake instruments for each facilities according to the seismic design standard are getting ready. This paper presents the part of installation locations of sensors in that detaile standard and guideline.

  • PDF

Operation Plan of the Certification System for the Construction Information Standard -From the Construction CALS Standard- (건설사업정보 표준 인증을 위한 운영방안 마련 -건설CALS 표준의 관점에서-)

  • Moon, Jin-Seok;Won, Ji-Sun
    • The Journal of the Korea Contents Association
    • /
    • v.12 no.12
    • /
    • pp.459-470
    • /
    • 2012
  • Information technical dependence degree is coming to be high from constructive information-oriented field. The size and complexity of constructive information are increasing and consequently, the standard for a construction information resource management becomes important. Currently the certification about construction information standard is being enforced part system and information-oriented level etc. from domestic. So we have a plan which will propel the diffusion strategy for the practical application of constructive information standard with introduction of the certification system about construction information standard. For a certification system preparation, we studied a feature and definition about construction information standard and analyzed domestic and foreign case. From that, we accomplished a classification and an analysis about construction information standard becomes the object of certification. And then, we selected the object of the certification through deriving necessities of certification about each construction information standard and considering the priority at the time of introduction. Finally we suggested an certification institutional operation plan about the object which is selected. Held a consultation meeting about the fact where the professional knowledge or technique is demanded and established secured directivity about authentication institutional operation plan and professionalism.

Diagnosing communication management using SW-CMM concept (SW-CMM 개념을 활용한 의사전달관리의 진단)

  • Lee, Seon-Gi;Park, Jeong-Ha
    • 시스템엔지니어링워크숍
    • /
    • s.1
    • /
    • pp.15-20
    • /
    • 2003
  • Construction industry recognizes the necessity to manage is business from viewpoint of processes, and consider developing, evaluating and improving standard processes as important managerial target. SW-CMM provides basic framework for this process management. However, appropriate tailoring and adjustment are essential for SW-CMM concept to be applied to construction business. SW-CMM makes construction manager understand the capability of business process, based on which the priority of process improvement is judged. The capability is prescribed by common features. This paper introduces the basic frame for diagnosing construction business processes with SW-CMM, and presents the case study of analysing processes focusing on communication management.

  • PDF

Discrete Event Simulation based Equipment Combination Optimization Method - based on construction equipment performance estimation of the Construction Standard Production Rate - (이산형 이벤트 시뮬레이션 기반 최적의 건설장비 조합 도출 방법 제시 - 표준품셈 건설기계 시공능력 산식을 기반으로 -)

  • Ko, Yongho;Ngov, Kheang;Noh, Jaeyun;Kim, Yujin;Han, Seungwoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.6
    • /
    • pp.21-29
    • /
    • 2022
  • Productivity estimation of construction operations is crucial to successful project delivery. Especially in the preconstruction phase, the adequacy and effectiveness of plans directly affect the actual performance of operations. Currently, productivity estimation is conducted by referring to existing references such as the Construction Standard Production Rate. However, it is difficult to promptly apply changing conditions of operations when using such references. Moreover, it is difficult to deduce the optimal combination of construction machinery for the given condition. This paper presents a simple simulation model that can be used to generate productivity data that considers site conditions and construction equipment combination. The suggested method is expected to be used as a decision making assisting tool for practitioners who rely on estimations using the Construction Standard Production Rate when establishing construction plans using heavy machinery such as backhoes, loaders and dumptrucks.

Development of Standard Systems through Analysis of Business Process the Risk Factors for the Korean Construction Management Firms (국내 CM기업의 리스크 인자별 관리 업무 프로세스 분석을 통한 표준업무체계 개발)

  • Park, Kyungmo;Kim, Changduk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.6
    • /
    • pp.73-83
    • /
    • 2015
  • Construction management firms in Korea have mainly focused on the key management areas of time, cost, quality and safety management in line with a rapid change of construction industry recently. However, a risk management is considered comparatively less important found from our research on an investment by the firms for training, system establishment. This has been identified that the construction management firms have taken an approach of dealing with risks with their experience, insight rather than managing risks with a systemized principles or proper tools. Therefore, the current system for risk management was identified by analyzing risk factors and work process in this research and systemized process for risk management of the identified risk factors was suggested. This research is expected to be a basis on establishing standard gudiance for risk management and risk management tools.

A Self-control Safety Management Activity Model in Construction Sites through Analysis of Success Factors (건설현장 안전관리 성공요인 분석을 통한 자율안전관리활동 개선에 관한 연구)

  • Lee, Joo-Sung;Hong, Jung-Suk;Kim, Jae-Jun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.5
    • /
    • pp.109-117
    • /
    • 2008
  • Recently, there has been constituted the government regulations and the normative methods to control the safety management activities in construction fields, but almost of these regulations are ineffective, because of some characteristics safety management have. The needs of the times make government regulations and the normative methods change to autonomic management methods. In this context, it is significant certainly to improve the standard of safety management that is used as a tool to protect the workers from the accidents or industrial disasters in the construction field. In this research, it will be showed that the outside regulations and safety management systems of the head office have their limits to reflect the safety managements of field participants. Then, it will be presented the improved model of self-control safety management activities which is essential for success safety management.

Direction for Improving Cost Estimation and Management of Construction Projects : Comparing to Australian System (건설공사 공사비 예측 및 관리기술 발전방향 : 호주 사례를 중심으로)

  • Ji, Sae-Hyun;Park, Moon-Seo;Lee, Hyun-Soo;Yoon, You-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.2
    • /
    • pp.170-181
    • /
    • 2008
  • Cost of construction project have to be estimated based on drawing before execution. Cost estimate and check would be performed numerously for preparing general outline of requirements and determining the budget at conceptual planning stage, for obtaining decision on every matter related to design, specification, construction and cost at design stage, and for predicting bidding cost. Thus, importance of cost estimation cannot emphasize too much in construction. However, there are lack of standard estimation method, process, and cost analysis method, that square foot estimation method is as used as eyer, in Korea. Thus, This research present the direction for improving cost estimation and management in construction; It is demanded that establishing standard data base methodology, multi-level database model CUBE, and standard cost planning process, choosing cost estimation methodology according to objectives and cost planning process, and making more experts.

DEVELOPMENT OF CONSTRUCTION PROCUREMENT INFORMATION EXCHANGE STANDARDS IN TAIWAN

  • Ren-Jye Dzeng;Bin Wu
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1053-1057
    • /
    • 2005
  • The Taiwan government agencies have been promoting e-commerce for the construction industry with several initiatives since 2000. The development of standards for the procurement information exchange among government agencies, construction firms, and suppliers for the construction industry is one of the major initiatives and begins to produce tangible results. This paper reviews the effort for developing the information exchange standards and compares the development strategies used in different segments in the supply chain. Lessons learned during the development course are also discussed.

  • PDF