On the Risk Management System in Construction Industries (건설 분야 리스크 경영 시스템 구축)

  • 김종걸;박용수
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2004.05a
    • /
    • pp.277-281
    • /
    • 2004
  • The establishment and application of risk management system is one of the current issues in world-wide leading companies. Poor risk management might bring large-scale accident in construction industry by its features(large scale, diversity). Standardization system and standard for risk should be managed timely. In this paper, we do comparative analysis of standardization systems and standards concerned on risk, so thus present basic data for safety reinforcement and risk zero in the construction life cycle process.

  • PDF

Experimental Study on Wall Transmission Loss of Electric wave for the RTLS Application of Building Construction Project (건설현장 RTLS 활용을 위한 전파의 벽체 투과손실에 관한 실험적 연구)

  • Lee, Jong-Kook;Lee, Young-Hun;Park, Jung-Hyun;Son, Min-Ji
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.1
    • /
    • pp.95-101
    • /
    • 2009
  • Although the concept of RTLS is very unfamiliar to construction industry, recently it is popular in other industry, such as logistics, ship building, mobile telecommunication based on state-of-the-art information technology. Effective resource management using cutting-edge information technology makes it possible to succeed a project with saving the time and cost. And effective information management in construction project can be achieved by the new technologies such as RFID, WEB-based internet, DB technology, real-time monitoring technology, etc. This paper suggest the characteristics and applicability of the international standard electric waves to be used for the real-time locating system (RTLS) on the viewpoint of transmission loss in construction field to monitor and manage resources of construction project effectively The two types of electric waves based on the international standard is to be suggested after surveying the as-is technology in the related industries and then is analyzed to find out the characteristics of those by the concept of the electric wave transition loss in the several construction situations. Two main electric waves, the 2.4GHz and the 433MHz technologies as the international standard is researched on the applicability to the indoor environment of construction site.

A Study on Analysis of Construction Monitoring Cost and Improvement Measures of Railway Tunnel Construction in Seoul (서울시 철도터널 건설공사의 공사계측비 분석 및 개선방안 연구)

  • Jong-Tae Woo
    • Journal of the Society of Disaster Information
    • /
    • v.19 no.1
    • /
    • pp.18-30
    • /
    • 2023
  • Purpose: This study is to contribute to the development of monitoring technology through the increase of confidence in construction monitoring by deriving the analysis of construction monitoring cost and improvement measures of railway tunnel construction in Seoul. Method: It presents the status on design and contract of construction monitoring cost, status on application construction monitoring cost and its analysis, analysis on safety management cost and quality management cost, expansion of application of the price calculation standard for monitoring management services to improve this, and monitoring for direct order of ordering organization. Results: If the monitoring management service that was meanwhile ordered as included in the construction work is performed by the directly selected company of ordering organization through the preliminary screening for bidding qualification, then the improvement of monitoring quality and the accurate monitoring data can be secured. Conclusion: For the price calculation standard for monitoring management service, the application of actual cost addition method under the Engineering Promotion Act and the calculation standard of monitoring management cost for standard estimation for ground survey should be extended through the direct order of ordering organization, not the method to be included in the net construction cost where it is performed by a subcontractor via contractor.

Forecasting of building construction cost variation using BCCI and it's application (건축공사비지수를 이용한 건설물가 변동분석 및 공사비 실적자료 활용방안 연구)

  • Cho Hun Hee;Kang Kyung In;Kim Chang Duk;Cho moon Young
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.64-71
    • /
    • 2002
  • This research developed construction cost forecasting model using Building Construction Cost Index, time series analysis and Artificial Neural Networks. By this model, we could calculate the forecasted values of construction cost precisely and efficiently. And we also could find out that the standard deviation of forecasted values is 0.375 and it is a very exact result, so the standard deviation is just 0.33 percent of 112.28, the average of Building Construction Cost Index. And it show more exact forecasting result in comparison with Time Series Analysis.

  • PDF

Comparison between Labor Inputs by Quantity per Unit Method and by Actual Data Method in the Apartment Housing Construction Work - Focusing on Masonry Plaster Waterproofing Tile Labors - (공동주택 건설공사의 표준품셈과 실투입 노무량 비교 분석 - 미장, 방수, 조적, 타일공사를 중심으로 -)

  • Jeon, SangHoon;Koo, Kyo-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.1
    • /
    • pp.110-118
    • /
    • 2015
  • The standard production unit system is the most basic element in our country construction. However, this standard production unit system shows a large difference in the actual amount of labor input for works at the Apartment housing construction, Therefore, it may be a reasonable alternative to estimate the cost of construction by historical cost data, works will be calculated the cost of labor must determine the exact amount and It is necessary to determine the exact amount of labor input for the construction progress management. This study examines the results of comparing the standard production unit system and the actual amount of labor counting in apartment housing construction was completed in the metropolitan area since 2000, the following results were obtained. the actual amount of labor input are looked for 1.184person/1000 of masonary, $0.084persons/m^2$ of plaster, $0.039persons/m^2$ of Waterproofing, $0.059persons/m^2$ of tile at the Apartment housing construction. in the actual amount of labor counting Compared with standard production unit system, masonry ratio of 59.8%, plaster ratio of 41.3%, waterproofing ratio of 31.5%, tile ratio of 34.3% and The labor rate in the works was the lowest in the plaster. was relatively high in the masonary. Therefore, the amount of labor country apartment housing construction is preferably calculated on historical cost data. But it seems that the amount of labor necessary complement ongoing close enough to the actual standard production unit system a major variable in construction management.

Identification of Primary Activity and Management Plan for Construction Standard Unit Price (건설공사 표준시장단가 핵심공종 도출 및 중점관리방안)

  • Jin, Zheng-Xun;Baek, Seung-Ho
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.10
    • /
    • pp.589-601
    • /
    • 2020
  • The Construction Standard Unit Price (CSUP) sets the standard for calculating the estimated construction cost. The CSUP is used as basic data for preparing a standard price for public construction. Currently, the CSUP is calculated in consideration of the market and construction field conditions. However, a long-term management plan was established to prepare revised standards. As part of the plan, a field survey was conducted on changes in construction conditions and market prices. However, the plan continued for more than 5 years. Thus, the plan has a problem of difficulty continuously managing primary activities that have high importance and high price volatility. Therefore, to efficiently manage the CSUP, this study identifies the primary activities of the CSUP and presents a management plan. Through importance analysis and unit price volatility analysis, 242 primary activities in 35 activity groups were identified. Also, a management plan is presented based on the importance levels of activities. The primary activities and management plan could enable the timely revision of important activities. The results of this study provide a base for reflecting the appropriateness of construction cost criteria on time.

Proper Estimating Method for Environmental Preservation Cost in Road Projects (도로공사 환경보전비의 적정 산출 방안)

  • Park, Ji-Sun;Lee, Sea-Hyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.2
    • /
    • pp.3-10
    • /
    • 2012
  • The current enforcement regulation of "Construction Technology Management Act" prescribes calculation standard of environmental preservation cost in construction site. According to this standard, environmental preservation cost is calculated by using the quantity-per-unit costing method or applied fixed rate on direct cost. However, when calculated by using the quantity-per-unit costing method it is few items to put in the budget according to standard of construction estimate and in the case of using the fixed rate on direct cost it is not considering various characteristics of the construction site. Therefore, it is needed a improvement plan of estimating method and management system for environmental preservation cost. In this study, it surveyed the actual state of the environmental preservation cost according to magnitude of project, site location, anti-pollution facilities and etc. over 38 road projects. The research reported in this paper environmental preservation cost was variously distributed over construction sites. Thus it needs to estimating method and management system to consider characteristics of construction site for environmental preservation cost.

An Ordinary Management System for Updating Construction Equipment Prices in the Poom-Saem Based on the Standard Market Price1 (시가표준액표를 활용한 건설공사표준품셈 건설기계가격 상시관리 시스템 개발)

  • Ahn, Bang-Ryul;Tae, Yong-Ho;Kim, Dae;Huh, Young-Ki
    • Journal of the Korea Institute of Building Construction
    • /
    • v.15 no.4
    • /
    • pp.397-404
    • /
    • 2015
  • Construction equipment cost is critical to estimate the total construction costs, particularly in large and complicated projects. Public construction projects are typically estimated using the Poom-Saem which includes hourly rates for workers and equipments. Despite its importance, the construction equipment cost may not properly reflect the current market value because it is being updated every six years at most. To keep the data for construction equipment cost estimation up to date, it is highly recommended to use the standard market price that is reported each year by the Ministry of Security and Public Administration (MOSPA). However, there is still a wide gap to directly adopt the standard market price for updating the construction equipment prices. Therefore, this paper suggests an effective way to develop an ordinary management systems for updating construction equipment prices in the Poom-saem based on the standard market price.

A Study on Proposal to improve Domestic Construction Management Service Guide (국내 건설사업관리 업무지침의 개선(안)에 관한 연구)

  • Na, Kwang-Tae;Ryoo, Boong-Yeol;Kang, Byeung-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.2 no.3
    • /
    • pp.147-154
    • /
    • 2002
  • The Korean government makes an effort to raise the competitive power of nation through CM activation in the construction industry. Since the first CM service was applied to the atomic power plant project in 1986, the number of CM contracts are continuously being increased and will be up to 20% by 2002 in public sector. However, the public projects had been executed without any procedure manual or standard guideline of CM services. Meanwhile the Ministry of Construction and Transportation issued $\ulcorner$CM Service Guide$\lrcorner$, but the guide shows an indefinite description in the responsibility, authority and scope of activity for the project participants. Therefore, it is required the procedures be improved and scope of activities be established for the project participants. This study was generated from the comparative analysis of $\ulcorner$Standard CM Services and Practice$\lrcorner$ Published by CMAA and domestic $\ulcorner$CM Service Guide$\lrcorner$ and the case of Incheon International Airport construction. The purpose of this study is to provide the fundamental data for an improvement in the procedures of project execution and the construction manager's activities/rolls shown on $\ulcorner$CM Service Guide$\lrcorner$

Standard Classifications and Project Numbering System for Integrated Construction Management of Modernized Korean Housing (Hanok) (신한옥 건설통합정보화를 위한 표준정보분류 및 사업번호체계)

  • Jung, Young-Soo;Kim, Woo-Joong;Ha, Ji-Won
    • Korean Journal of Computational Design and Engineering
    • /
    • v.17 no.4
    • /
    • pp.225-233
    • /
    • 2012
  • A comprehensive research effort in order to develop and disseminate modernized Korean housing (Hanok) has recently been initiated by Korean government. This large scale research project encompasses a wide spectrum of housing development including public policy, architectural plans, modules, construction materials and methods, prefabricated assemblies, automated production, construction management, and advanced information systems. For the purpose of integrating and automating the whole processes from an industry perspective, it is of great importance to develop a standard classification system and project numbering system (PNS) for the modernized Korean housing. This paper focuses on the standard classification systems and PNS for cost and schedule control. The distinct characteristics and managerial requirements were explored and embedded into the proposed classifications for modernized Hanok.