• Title/Summary/Keyword: Construction management standard

Search Result 879, Processing Time 0.029 seconds

A Study on the Estimation Standard of Optimal Construction Duration for Reinforced Concrete Apartment House (철근콘크리트조 공동주택 적정공기 산정기준에 관한 연구)

  • Chun Young-Gee;Lee Gye-Uk;Kim Yang-Taek;Hyun Chang-Tae
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.531-534
    • /
    • 2001
  • At the beginning of construction, the estimation for the construction duration is very important to effectively control and use labors, builder's equipment, permanent and temporary materials, supplies and utilities, and money. In spite of the importance of the estimation for the construction duration, there is no estimation standard of optimal construction duration in korea. The purpose of this study is to suggest the estimation standard of optimal construction duration that is reasonable and systematical through developing the method for estimating, the construction duration. it is expected to be helpful for estimating, planning and scheduling. The analysis is executed the existing estimation standards and consulting the results of the interviews with the on-site engineers and the concrete compressive stress tests.

  • PDF

The Analysis for Development Evaluation System of G-SEED Building Maintenance and Management (녹색건축인증 건축물 유지관리 평가제도 발전을 위한 연구)

  • Kim, Yu-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.261-262
    • /
    • 2016
  • In Korea, Green building certification system had been operated for more than 10 years and Expired certification buildings are ever-increasing. However, post management of building and qualification standard for re-certification(G-SEED) aren't exist, certificated green building don't have smoothly maintenance and management. Therefore, analysing the status and situation of similar system such as building maintenance and management, to suggest the direction of evaluation for green standard for energy and environmental design.

  • PDF

The Impacts of Reduced Labor Hours on the Construction Period and Cost of Tunnel Project (근로시간 단축에 따른 터널 공사의 표준 공기 및 공사비 영향 분석)

  • Park, Taeil;Kim, Kyunghoon;Shin, Eun-Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.2
    • /
    • pp.37-43
    • /
    • 2019
  • After the new standards for labor hours has been released, various problems come up in construction field, such as income reduction of employees, extension of construction period and increased construction cost. Although it is expected that the impact of the new standard on the construction industry is more worse than other industries form the view of productivity, not much works have been done to identify those impacts. Thus, this research proposes the standard construction processes, excavation cycle, and unit construction period for NATM tunnel project based on 'Construction Standard Production Rates.'The study also investigated the impact of reduced labor hours on the management of work crews, construction periods and costs of tunnel projects. The results showed that under the 52 labor hour standard, the construction periods for the excavation work and whole project was increased by 20% and 8.9%, respectively, but the construction costs for the excavation work and whole project was decreased by 1.4% and 0.6%, respectively.

A Study on Concrete Material Quality Management Based on Various Test of Construction Condition under Hot Weather Circumstance (서중(暑中) 환경에서 현장 콘크리트 시험을 통한 재료 품질관리 방안)

  • Park, Shin
    • Journal of the Korea Institute of Building Construction
    • /
    • v.5 no.3 s.17
    • /
    • pp.91-99
    • /
    • 2005
  • It is required to study systematical on the concrete quality management to extend structure life because rebuilding effect is reducing under present condition of large sized and high stories structure. Concrete, which shows its intensity by hydrating action and a big change in quality according to hot weather and temperature, produces a lot of qualify problem under hot and cold weather Because of each specification and construction plan which does not have basic standard on site, concrete's quality is irregular and makes some defect. As a result, Daegu is turned out to be the longest area after investigating application period and days focused on 8 cities weather information about relationship between hot weather circumstance and construction environment. Therefore, we first surveyed the concrete material in the region and found out the problem of quality nanagement. Then figure out the way of solution. Moreover, we integrated concrete material quality management, which is applied differently to each site, to have equal quality and to reduce defect from construction site. And then, based on various test of construction condition and analysis of quality management item, we suggest effective concrete quality management to make concrete material construction standard guide and plan under hot weather.

A Study on the Development of Construction Production Rates System for Estimating Proper Construction Expenses of Off-Site Construction (OSC) Based PC Structure Factory-Built Assembly (OSC기반 PC구조 공장제작 적정 공사비 산정을 위한 품셈체계 개발 연구)

  • Lee, Jeongwook;Lee, Hansoo;Lee, Chiho;Noh, Hyunseok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.6
    • /
    • pp.89-100
    • /
    • 2022
  • The development of the Construction Production Rates System for appropriate construction cost calculation has recently come to the fore as a means of invigorating OSC based PC structure which currently needs institutional frameworks. PC structure based construction expenses consist of the factory-built assembly, transportation and on-site installation. Recently, in the field of transportation and site installation, research on product structure development is being conducted, such as presenting the standard product calculation system reflecting the results of field survey for each subsidiary materials (Lee et al., 2021). On the other hand, there is no ongoing research on estimating construction expenses of Factory-built assembly. This study suggests Construction Production Rates System which can be used for PC subsidiary materials based Factory-built assembly cost estimations. For the research, work types for the construction procedures have been categorized, and the standard input manpower suitable for the corresponding work characteristics has been derived from analyzing the associated Construction Standard Production Rates for each work type. Also, as the research referred PC subsidiary materials (such as columns, beams, walls, and slab, as well as on-site installation) and the standard number of workforce based on work types, one can calculate direct labor cost, using what the research shows. In addition, it suggests that the size of individual subsidiary materials be the extra cost factor, by using the characteristics that productivity changes depending on the size(m3) of subsidiary materials. It is expected that the research can contribute to objectively verifying factory-built assembly cost through of PC structure, which currently relies on estimates.

How to Use Standard Market Prices for Ordinary Management System of Construction Equipment Prices in Poom-Saem (시가표준액을 활용한 건설공사표준품셈 건설기계가격 상시관리 방안)

  • Ahn, Bang-Ryul;Huh, Youngki;Kim, Dae Young;Tae, Yong-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.11a
    • /
    • pp.98-99
    • /
    • 2014
  • Construction equipment cost is critical to estimate the total construction costs, particularly in large and complicated projects. Despite its importance, the construction equipment cost may not reflect the current market value since the equipment database is being updated every 6 years at most. To keep construction equipment cost up to date, it is highly recommended to use the standard market price that is reported each year by the Ministry of Security and Public Administration (MOSPA). However, there is still a gap to adopt the standard market price system for the construction equipment cost computing system. Therefore, this paper suggests an effective way to develop a construction equipment cost estimation system.

  • PDF

A Study on the Efficient Improvement of Standard Apartment Management Rules (공동주택관리규약(共同住宅管理規約)의 개선방안(改善方案) 연구(硏究))

  • Yoon Hyung-In;Ahn Hyo-Soo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.6 no.3 s.21
    • /
    • pp.83-90
    • /
    • 2006
  • The purpose of this study is to propose improved apartment management rules so that the inhabitants of apartment houses can manage their apartment in efficient and transparent manners. This study points out several problems of current management system and propose improved apartment management rules by analyzing misconducts of management office, related laws and regulations, standard apartment management rules, these and judicial decisions. Therefore, the inhabitants may refer to this study in establishment or amendment of their apartment management rules.

The global standard realizing process of the Automobile Assembly Facility

  • Nashimoto, Tomoo
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.24-25
    • /
    • 2015
  • To realize the global standard of the assembly facility, one of key point is an influence of local characteristic. The global standardized information could be a useful input, especially at the beginning stage of the project. The content should be carefully checked against local requirements, in order to develop an Assembly Facility design to meet local regulations & characteristics. The level of input information required in each step is different depend on regions & countries. At an execution stage of the project, the global standard input needs to be updated as customized final input for the construction. There will be many issues to be clarified and coordinated so that the Assembly facilities meet the final requirements for the production technology. As a result, it is important to understand the timing to use the global standard information and the contents what is needed to adapt to the local characteristics. And close collaboration between production technology team and facility team is always required.

  • PDF

Supplementation of Regulation on the Offshore Oil Pipeline for Maintenance (해저 송유배관 유지관리를 위한 기준 보완 제시)

  • Kang, Chan-Seong;Moon, Seung-Jae
    • Plant Journal
    • /
    • v.8 no.2
    • /
    • pp.70-81
    • /
    • 2012
  • The study aims to supplement facility management plan and safety regulations & standard of oil pipeline by searching and reviewing related regulation & standard inside and outside of the country. Korean regulation & standard is reviewed based on harbor and fishery design standard of the ministry of maritime affairs and fisheries, general technology standard of oil pipeline safety regulation, gas excavation construction and safety maintenance indicator of Korea gas corporation. Global regulation & standard is reviewed based on U.S standard inspection for offshore pipeline and Europe/Mexico standard inspection for offshore pipeline. The contents of offshore pipeline installation is inserted into pipeline sector for objected facilities of safety inspection regulation & standard and, the standard of safety inspection for offshore pipeline is newly presented into pipeline maintenance part of the planning facilities management with its inspection period and method.

  • PDF

Improvement Direction on the Assignment of Safety Managers in the Construction Site (건설안전관리자 선임기준의 개선방향 연구)

  • Kim, Ho Min;Woo, In Sung
    • Journal of the Korean Society of Safety
    • /
    • v.30 no.3
    • /
    • pp.73-79
    • /
    • 2015
  • In consideration of current circumstances which management activities for safety performance on construction sites are mostly controlled by safety personnel, it is necessary to maintain qualified safety personnel those who are experienced and have adequate ability. This is a major factor in order to prevent any of work related incident in the construction site. However, the existing standard which enforces certain number of safety personnel in the construction site aligning with respective contract amount could lead to difficulties for proactive safety management. So, it is required to get improvement on the existing standard. In nominating the proper number of safety personnel, it would be more efficient to consider the level of risk for characteristic of work itself and the total number of manpower mobilized in respective construction work, rather than to follow the existing standard of manpower ratio as per the contract amount. Hence, this study aims to propose several plans which enable to improve the existing standard for assignment of safety personnel on construction sites.