Methodology for Developing Standard Schedule Activities for Nuclear Power Plant Construction through Probabilistic Coherence Analysis

  • kim, Woojoong
    • 국제학술발표논문집
    • /
    • The 7th International Conference on Construction Engineering and Project Management Summit Forum on Sustainable Construction and Management
    • /
    • pp.8-13
    • /
    • 2017
  • Nuclear power plant (NPP) constructions are large scale projects that are executed for several years, and schedule control utilizing various schedules is a critically important factor. Recently Korea independently developed the Advanced Power Reactor (APR) 1400 and is building nuclear facilities applying this new reactor type. The construction of Shin-Kori NPP (SKN) Unit 3, which adopted the APR1400, was completed and commercial operation has begun, while, SKN 4, Shin-Hanul NPP (SHN) Units 1&2, and SKN 5&6 are currently under construction. Prior to the development of the APR1400, Korea built 24 reactors and accumulated the schedule data of various reactor types which provided the foundation for schedule reduction to be possible. However, as there is no schedule development and review system established based on the standard schedule data (standard activities, durations, etc.) by reactor type, the process for developing the schedule for new builds is low in efficiency consuming much time and manpower. Also all construction data has been accumulated based on schedule activities. But because the connectivity of activities between projects is low, it is difficult to utilize such accumulated data (causes for schedule delay, causes for design changes, etc.) in new build projects. Due to such reasons, issues continue to arise in the process of developing standard schedule activities and a standard schedule for nuclear power plant construction. In order to develop a standard schedule for NPP construction, i) the development of an NPP standard schedule activity list, ii) development of the connection logic of NPP standard schedule activities, iii) development of NPP standard schedule activity resources and duration, and iv) integration of schedule data need to be performed. In this paper, an analysis was made on the coherence of schedule activity descriptions of existing NPPs by applying the probabilistic methodology on activities with low connectivity due to the utilization of the numbering system of four APR1400 reactors (SHN 1&2 and SKN 3&4).This study also describes the method for developing a standard schedule activity list and connectivity measures by extracting same and/or similar schedule activities.

  • PDF

OSC기반 PC구조 공사비 산정을 위한 품셈개발 및 공사비 분석 - RC공법과 비교 - (A Study on Development of Construction Standard Production Rates and Cost Analysis for Off-Site Construction (OSC)-Based PC Structure Construction Costs - Comparison with RC Method -)

  • 이한수;이치호;한희수;이정욱
    • 한국건설관리학회논문집
    • /
    • 제25권2호
    • /
    • pp.56-68
    • /
    • 2024
  • 최근 공동주택에서의 OSC (Off-Site Construction)기반 PC구조의 객관적인 원가기준 마련을 위해 공장제작-현장설치 단계의 공사비 산정을 위한 품셈 체계를 제안하였다(Lee et al., 2021). 또한, 건설공사 표준품셈에서도 보편적인 PC공사의 현장설치 단계에 적용할 수 있는 주요 부재의 표준품셈을 제시하는 등 PC공사의 공사비를 체계적으로 산출할 수 있는 제도적 기반이 마련되는 추세이다. 본 연구에서는 공동주택 PC구조의 현장조사 결과를 분석하고 전문가 의견을 수렴하여 공동주택 PC공법에 적용할 수 있는 공장제작-현장설치 품셈을 개발하였으며, 현행 표준품셈 기준과 비교하여 공동주택의 현장 및 부재특성에 적용할 수 있도록 표준품셈의 보완 방향을 제시하였다. 또한, 개발 품셈을 활용하여 공사비를 산출하고 동일규모의 공동주택 RC공법과 공사비를 비교함으로써 PC공법의 비용발생 특성 및 원가절감 방안을 도출하였다. 본 연구에서 도출한 PC공법의 표준품셈은 PC공법 공사비 산출결과의 객관성과 일관성을 확보함으로서 PC공법 적용 확산에 기여할 수 있을것으로 기대된다.

공사장 소음진동 규제기준 개선방안에 관한 연구 (A Study on the improvement plan of regulatory standard for construction noise and vibration)

  • 박영민;김경민
    • 환경영향평가
    • /
    • 제22권4호
    • /
    • pp.369-379
    • /
    • 2013
  • Noise and vibration problems at the construction site, expansion of construction scale and frequency of urban construction is increased, has given the damage to local residents. Also, the result of civil complaint about noise and vibration that occurred in 2011 was 56,244; it is showing an increasing trend of more than 4% annually. In particular, the construction noise and vibration, the civil complaints of around construction site accounts for 64.6%(36,353), are harmful to the tranquility of living environment. As a result, the government has managed to strengthen the regulatory standard of construction noise (65dB(A), Day-time) from 2011. However, the regulatory standard of construction noise and vibration does not meet and also complaints related the construction noise and vibration not decreased. Because the management system can be applied to the construction site is insufficient and a shortage of manpower. In this study, investigated the status and problems of the regulatory standards related to construction noise and vibration, we propose an efficient management plan of construction noise and vibration.

건설업 산업안전보건관리비 사용 실태조사 및 분석 (Analysis and Survey on Occupational Safety and Health Management Expenses in the Construction Industry)

  • 강성윤;오세욱;김창원;정기효
    • 대한안전경영과학회지
    • /
    • 제25권2호
    • /
    • pp.113-120
    • /
    • 2023
  • Occupational safety and health management expenses in the construction industry are statutory and separately included in the cost statement to prevent occupational accidents and health problems. The expenses are determined by multiplying the standard amount by the rate decided according to construction types and scales. However, the current expense appropriation method does not properly reflect the recent changes in the construction industry such as industry size, industry diversification, and social atmosphere about safety reinforcement. This study surveyed 1579 questionnaires in total and analyzed expense execution rate and proportion of each expense category. The expense execution rate was relative higher in complex construction (e.g., heavy construction = 126%, civil engineering = 125%) and long-period project (equal to or over 48 months construction = 133%) compared to general construction (98~116%) and short-period project (less than 48 months construction = 115%). The proportion of spending expenses was higher in the category of safety manager labor costs (25~52%), safety facility costs (22~40%), and personal protective equipment costs (10~25%). The analysis results of the study can be utilized in revising the standard expense appropriation method by reflecting the current usages of the occupational safety and health management expenses in the construction industry.

건축공사 안전관리비 비율 산정 모형에 관한 연구 (A Study on the Estimating Rate of Safety Management Cost in Building Work)

  • 손기상;갈원모;양학수
    • 한국안전학회지
    • /
    • 제22권5호
    • /
    • pp.33-40
    • /
    • 2007
  • Standard safety management costs can not be applied to each site with same rate, it is very difficult, because it depends on the experience, work method, work kind, work progress schedule, and hazard level of each construction company. Therefore, this study is to find out hazard level of each work kinds through questionnaire and interview and investigate analyze the status which standard safety management costs have been used. Also, this study is to show reasonable rates of standard safety management costs in construction industry and to set up countermeasures against those problem after reviewing its status in korea with in Japan and Europe. This study is to investigate eleven project kinds of domestic system, first, and to investigate eleven items of apartment bldg, office. Also this study is to investigate and analyze performed costs of presently processing worker finished work so that it shows a new reasonable rate against standard safety management costs in construction industry, in order to make basical data and material to be systemized.

Site Quality Evaluation Prototype for Building Deck-plate Construction

  • Shim, Young-Bo;Cho, Dong-Hyun;Koo, Kyo-Jin
    • 한국건축시공학회지
    • /
    • 제13권1호
    • /
    • pp.90-100
    • /
    • 2013
  • Deck-plates are widely used on construction sites, and have the advantage of enabling contractors to achieve a relatively uniform quality. But nevertheless, quality deviation in deck-plate construction can occur as the result of differences in site conditions and the experience of crew workers. In this study, the authors present a site quality evaluation prototype for building deck-plate construction. Through analyses of case studies and interviews with experts, standard quality check sheets and a quality management index were developed by estimating the importance of quality check items based on a Failure Mode and Effects Analysis (FMEA) method. The applicability and effectiveness of the prototype was evaluated through a case study and interviews with case participants. It was found that the prototype promoted an active quality management as a way of continuously improving quality management in deck-plate construction instead of passive quality inspection practice.

건설공사 품질.안전.환경 통합관리를 고려한 해외 사례 고찰 (An advanced nation's case study considering integrated control for construction work quality.safety.environment)

  • 김동희;김운수;정한교;노정원
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2008년도 정기학술발표대회 논문집
    • /
    • pp.819-823
    • /
    • 2008
  • 현재 국내의 건설공사 품질관리, 안전관리, 환경관리는 각각의 법령을 기반으로 고유특성에 맞게 발전되어와 통합을 위한 기반이 형성되어 있지 못하다. 즉, 인력에서는 품질관리자와 안전관리자를 법적 배치인력으로 정하고 있으나, 환경관리자는 법적 배치인력이 아니다. 또한 품질관리계획은 KS A ISO 9001 규격의 모든 요구사항이 반영되어 PDCA(계획-실행-체크-조치) 시스템으로 업무를 수행하도록 되어 있으나, 안전관리계획 및 유해 위험방지계획은 KOSHA 18001 규격 요구사항 중 4항 실행(D) 및 운영에만 치중되어 P(계획), C(체크) 및 A(조치) 시스템이 제대로 반영되어 있지 못하다. 더욱이 환경관리계획은 수립기준조차 마련되어 있지 못한 실정이다. 이에 건설공사 품질 안전 환경 통합관리 기준을 마련함에 앞서 해외의 건설공사 운영사례를 조사하여 국내 적용가능성을 검토하고자 하며 본고에서는 싱가폴의 건설공사 운영사례를 살펴보기로 한다.

  • PDF

해저터널 적정 공사기간 예측을 위한 표준공정관리 체계 연구 (A Study on Standard Construction Process Management System for Prediction of Proper Construction Period of Subsea Tunnel)

  • 배근우
    • 한국건설관리학회논문집
    • /
    • 제18권4호
    • /
    • pp.36-47
    • /
    • 2017
  • 대표적인 국내 해저터널 시공사례로 침매공법을 적용한 가덕 해저터널이 완공되어 운영 중이고, NATM 공법을 적용한 보령~태안간 해저터널이 건설중이다. 호남~제주 간 고속철도 해저터널이 구상중 이고, 일본, 중국과도 해저터널 건설에 대한 타당성이 검토되고 있다. 그러나 Shield TBM 공법을 적용한 해저터널에 대한 국내 시공사례가 없어, 현재의 기술력으로는 장대 해저터널 사업성 분석 및 적정 공사기간 예측 등 공사수행을 위한 공정계획정보 제공이 어렵다. 경제성 등 이유로 정부기관 및 발주기관도 Shield TBM 공법 적용에 소극적이고, Shield TBM 공법을 적용한 공정관리분야 기술적 자료도 부족한 실정이다. 따라서, 장대 해저터널 사업성 분석 및 적정 공사기간 예측하기 위한 표준공정관리체계가 필요하다. 본 연구를 통해 WBS, Network Diagram, 단위 공사기간 산출모델 등 해저터널 표준공정관리 체계를 제시하므로써, 장래 건설되어질 해저터널 사업에 기술적, 경제적으로 기여하고자 한다.

건설공사장의 효율적인 소음관리방안을 위한 연구 (Study on Effective Noise Management Plan of Construction Site)

  • 선효성;박영민
    • 한국소음진동공학회논문집
    • /
    • 제19권2호
    • /
    • pp.176-183
    • /
    • 2009
  • The objective of this study is to prepare the plans for managing construction noise effectively and solving the popular enmity from construction noise reasonably. In order to carry out this purpose, it covers the efficient improvement plans for adjusting the construction noise regulation standard rationally and managing the automatic noise measuring system which shows the advantage for construction noise management and popular enmity solution due to construction noise. The three alternative plans of the construction noise regulation standard and the recommendation plan including the guideline for installing and managing the automatic noise measuring system are suggested consequently.

A LINKING METHOD OF INFORMATION FACTORS FOR ADOPTING STANDARD MATERIALS INTO APARTMENT HOUSING CONSTRUCTION

  • Geun-Soo Park;Seok-Ho Lim
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1148-1154
    • /
    • 2009
  • This study focus on the suggestion of application manual using assembling reference plane design & standard finish material basis upon material classification code. We see it will function as a tool of a linkage between building design and construction standarization in order to enlarge the applicability of house building material that is produced by the module plan. For a estabilishing of this condition, it is neccessary to link the standardization's result of material--design--construction field. According to this neccessity, we are going to suggest information factor that can make relative business manager easily approach to the standardization practical task.

  • PDF