A study on the Project Management Plan (PMP) Development Appropriate for Global Construction Environment (글로벌 건설 환경에 적합한 건설사업관리계획서(PMP)에 관한 연구)

  • Yang, Myung-duck;Kim, Chang-kwon;Yang, Jae-woong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.107-108
    • /
    • 2015
  • It's became essential that Korea construction companies should enter into the overseas construction market for their growth and sustainability. In order to comply with the client's required global standard and to compete with in the international market, the shifting the construction project management system to global level is required. In accordance with the demand, this paper proposes the top-level document of construction project management system as a to-be model that utilized in overseas construction projects. The project management plan ("PMP") suggested in this paper is not only the most appropriate one, which complies with the global standard, to be used when companies bid for international construction projects against foreign competitors but also has the process modeling and hierarchical structure.

  • PDF

Estimating Relative Risk Level of Construction Work (건설공사 상대적 위험도 산정)

  • Son, Ki-Sang;Yang, Hak-Soo;Gal, Won-Mo
    • Journal of the Korean Society of Safety
    • /
    • v.21 no.5 s.77
    • /
    • pp.53-59
    • /
    • 2006
  • Standard safety management costs can not be applied to each site with same rate, it is very difficult, because it depends on the experience, work method, work kind, work progress schedule, and hazard level of each construction company. Therefore, this study is to find out hazard level of each work kinds through questionnaire and interview and investigate analyze the status which standard safety management costs have been used. Also, this study is to show reasonable rates of standard safety management costs in construction industry and to set up countermeasures against those problem after reviewing its status in korea with in Japan and Europe. The domestic system of standard safety management costs is not considered in the foreign country, while only related subjective items have been investigated and evaluated for this study. This study is to investigate eleven project kinds of domestic system, first, and to investigate eleven items of apartment bldg, office, civil work such as bridge, tunnel, dam, plant etc, secondly. Additionally, three items of gymnasium, railway, particular steel tower are investigated in this study. Also this study is to investigate and analyze performed costs of presently processing worker finished work so that it shows a new reasonable rate against standard safety management costs in construction industry, in order to make basial data and material to be systemized.

Analysis on the Problems of Construction Temporary Work through Review on Technology System

  • Park, Junmo;Kim, Okkyue;Kim, Jinlee;Lim, NamGi
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.716-717
    • /
    • 2015
  • A construction temporary work is main process and importance trade section. A technology system of construction temporary has very low availability of field works and needs improvements in Korea as construction site has a quick response about new requirements. This study reviews literature researches and can verify that changes to a comprehensive technology system for construction site. In addition, it suggests a breakdown structure of new standards for temporary construction technology based on views of construction site managers. Meanwhile, temporary construction technology in Korea has changed with a specification of construction temporary work which had been revised in 2014. However, the revision is merely dividing the design and building off of construction temporary technology. It is lacking in many ways to change this in a new standard system for temporary construction technology. Henceforth, it needs to develop a standard system for temporary construction technology and a professional system that is appropriate for different purposes by detail trade sections.

  • PDF

A Study for the Development of Writing National Standard Specifications, Owner′s Standard Specifications and Project Specifications (표준$\cdot$전문$\cdot$공사시방서의 작성방법 개선방안에 관한 연구)

  • Koo Jai Dong;Kim Tae Song
    • Korean Journal of Construction Engineering and Management
    • /
    • v.1 no.3 s.3
    • /
    • pp.81-88
    • /
    • 2000
  • Recently the Government has classified the construction specifications into three types such as national standard specifications, owner's standard specifications and project specifications, by the revision of the Law of Construction Technology Management. And the Government provided that project owner shall use the project specifications that are written by excerption from, revision of, and supplement to the national standard specifications or the owner's standard specitications etc.. The present study suggests the writing way of national standard specifications, owner's standard specifications and project specifications in these situations.

  • PDF

Application of IFC Standard in Interoperability and Energy Analysis

  • Hyunjoo Kim;Zhenhua Shen
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.87-93
    • /
    • 2013
  • In this research, a new methodology to perform building energy analysis using Industry Foundation Classes (IFC) standard has been studied. With the help of Archicad 14 modeling software, a 3D test model is generated and then exported to IFCXML format. A ruby code program retrieves the building information from the resulting IFCXML file using Nokogiri library. An INP file is created and gets ready for next energy analysis step. DOE 2.2 program analyzes the INP file and gives a detailed report of the energy cost of the building. Case study shows when using the IFC standard method, the Interoperability of the energy analysis is greatly improved. The main stream 3D building modeling software supports IFC standard. DOE 2.2 is able to read the INP file generated by IFC file. This means almost any 3D model created by main stream modeling software can be analyze in terms of energy cost Thus, IFC based energy analysis method has a promising future. With the development and application of IFC standard, designers can do more complex and easy-to-run energy analysis in a more efficient way.

  • PDF

REDUCTION OF SEDIMENT-LADEN WATER FROM CONSTRUCITON SITES INTO WATERWAYS:- A GOVERNMENT AND INDUSTRY APPROACH

  • Teo Ee Huat
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.285-291
    • /
    • 2009
  • Water is a strategic resource for Singapore due to its small land mass and more than half of the mainland serves as catchment for raw water, including construction sites. Construction site typically involves earthworks and in conjunction with the frequent and intense rainstorm in Singapore, produce runoff of high turbidity due to suspended sediments. The resulting high concentration of suspended sediment in construction site runoff very often leads to aesthetically unpleasant reservoirs and potentially increases the treatment cost of raw water. To mitigate this, the local standard requires the discharged concentration of total suspended solids of construction runoff leaving a construction site to be less than 50mg/l which is a very high standard. This paper will present, examine and discuss particular issues and practices of Singapore's construction industry in meeting this requirement. The focus will be on two areas: Government lead initiatives and industry practices. How the government agencies worked together with the industry professionals to develop a system to ensure meeting of the standard is discussed. In addition, the types of industry practices, including various Best Management Practice to reduce erosion in construction sites and implement effective sedimentation on construction sites are examined.

  • PDF

Analysis of Actual Duration by Effecting Elements to Duration Estimate - Focused on Standard Duration of the Office Building Construction - (공기산정 영향요인별 실적공기 비교분석 - 사무소 건축공사 공기산정기준을 중심으로 -)

  • Hwang Hyo-Sang;Kim Kyung-Rai;Suh Sang-Wook;Kim Chang-Duk;Shin Dong-Woo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.3 no.3 s.11
    • /
    • pp.84-93
    • /
    • 2002
  • It is important to reduce construction duration in private sales and lease business for management of cash now in the owner's aspect. However, because the concept of standard duration hasn't been established in the domestic construction industry, it is difficult to present the standard of duration estimate. To solve this problem, this paper (1) grasped the effecting elements considered in the duration estimate through referring the existing literature related to the schedule management, (2) accomplished a comprehensive research on actual duration based on office buildings through the questionnaire survey and the expert interview, (3) presented the collected research data analyzed by effecting elements as standard duration, (4) compared standard duration with actual duration of countries advanced in construction projects as well as analyzed them, and then (5) raised the necessity of duration reduction in the domestic construction industry.

SEARCHING FOR KNOWLEDGE IN THE CONSTRUCTION EXTENSION TO THE PMBOK GUIDE (THIRD EDITION)

  • F. Zhang;J. Zuo;S. Pullen;George Zillante
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.93-98
    • /
    • 2011
  • The application of knowledge management concepts as a way to improve project success is an emerging topic for project management researches around the world. The Construction Extension to the PMBOK® Guide Third Edition documents the knowledge and practices that are generally recognized as good practices for managing engineering and construction projects. However, it is not unusual to see that engineering and construction projects suffer from poor performance. Based on a critical literature review, a theoretical framework is developed for the application of knowledge management in engineering and construction projects. This framework is subsequently applied as a lens to examine the construction extension to the PMBOK® Guide, aiming to identify the key characteristics of knowledge management in this standard. This research also aims to highlight those aspects of the construction extension to the PMBOK® Guide that can be improved from the knowledge management perspective. Recommendations are made to improve this standard by means of applying knowledge management concept so that better project outcomes can be achieved.

  • PDF

Integrated Code Classification System for Work Sections in Standard Method of Measurement and Construction Standard Specifications (수량산출기준 및 공사시방서의 공종분류코드 통합기준 연구)

  • Kang Leen-Seok;Kwak Joong-Min
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.4 s.8
    • /
    • pp.80-91
    • /
    • 2001
  • Considering that the classified items in the work section level can have an applicability when those items are being used to cost and specification information with consistency, the work section classification code should be applied as an Integrated code system. Our construction industry is using three work section classification systems for civil engineering projects, such as integrated construction information classification system, standard method of measurement and guide of project specification. And each standard construction specification is also using different work section classification systems. This study suggests a methodology to integrate the code systems in construction specifications with civil engineering standard method of measurement. And the methodology suggested in this study was applied to a web-based prototype system with practical specification codes.

  • PDF

A Study on the methodology of applying the CALS/EC Construction Drawing Information Exchange Standard(STEP) in Design Fields (CALS/EC 건설도면 정보교환 표준(STEP)의 설계분야 적용 방안에 관한 연구)

  • Kim In-han;Choi Jung-sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.163-168
    • /
    • 2001
  • In the domestic construction field, there are a lot of problems related to construction information exchange and sharing owing to the absence of construction drawing information exchange standard. To solve the problems effectively, it is necessary to apply STEP standard that is international standard and standard technology for achieving the establishment of Construction CALS. This study focus on suggesting a methodology to solve problems which occur to the current construction drawing information exchanging and sharing practice. The domestic and foreign standardization projects related to the construction drawing information have been investigated and analyzed. In result, a methodology of applying the STEP standard has been suggested. In addition, a verification and certification methodology for applying the CALS/EC construction drawing information exchange standard(STEP) have been suggested.

  • PDF