• 제목/요약/키워드: Construction management procedure

검색결과 321건 처리시간 0.023초

철도시설물 관리를 위한 리스크 분석기법 적용 방법론 연구 (Development of Risk Analysis Method for Railway Facility Management)

  • 강인석;박서영;윤선미;김현수
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2006년도 추계학술대회 논문집
    • /
    • pp.341-344
    • /
    • 2006
  • Most construction companies recognize the necessity of risk management. The practical application, however, is not easy because of the absence of systematic procedure for risk management and the difficulty in objectification of subjective risk factors. This study suggests a systematic procedure and a web-based analysis system. In the first place for those researches, this study analyzes the present condition of risk management in the railway facility construction industry. Finally, this study defines risk management procedures as preparation, identification, analysis, response and risk analysis method to manage potential risks in the railway construction project.

  • PDF

연약지반상의 현장계측관리 실태와 개선방향 고찰(도로를 중심으로) (The reviews and Proposals for field instrumentation and management in embankment construction on soft ground)

  • 정종홍;김홍종;김성환
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2000년도 봄 학술세미나 논문집
    • /
    • pp.70-77
    • /
    • 2000
  • Field instrumentation has been important part of construction management in embankment on soft ground. Most of all, well organized plan, instrumentation, maintenance, analysis and feed-back to the construction procedure are the key to the successful construction. In this paper, We review problems of field instrumentation has been performed at road construction on soft ground. And then, several proposals to improve field instrumentation and management are suggested

  • PDF

MODIFIED SIMULATED ANNEALING ALGORITHM FOR OPTIMIZING LINEAR SCHEDULING PROJECTS WITH MULTIPLE RESOURCE CONSTRAINTS

  • Po-Han Chen;Seyed Mohsen Shahandashti
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.777-786
    • /
    • 2007
  • This paper presents a modified simulated annealing algorithm to optimize linear scheduling projects with multiple resource constraints and its effectiveness is verified with a proposed problem. A two-stage solution-finding procedure is used to model the problem. Then the simulated annealing and the modified simulated annealing are compared in the same condition. The comparison results and the reasons of improvement by the modified simulated annealing are presented at the end.

  • PDF

건설공사 리스크관리를 위한 모형 개발 연구 (Development of System Model for Risk Management)

  • 박서영;강인석
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2003년도 학술대회지
    • /
    • pp.418-421
    • /
    • 2003
  • 본 연구에서는 건설공사에서 발생할 수 있는 리스크 요인의 효율적 잔치론 위해 리스크관리 절차에 대해서 중점 검토하여 국내 실정에 가장 적합한 세부 리스크관리 절차를 제시하기 인한 모형을 개발한다. 본 연구에서 제시하는 건설공사 리스크관리 모형(CRMM, Construction Risk Management Model)은 리스크관리를 위해 리스크관리 준비단계부터 리스크 요인의 확인, 분석, 대응 및 관리단계의 총괄적인 작업을 수행하기 위한 모형으로 구축한다. CRMM에서는 리스크관리를 위한 3단계 모형(리스크 확인 모형, 리스크 분서 모형, 리스크 대응 모형) 구성으로 리스크관리 단계별 모형을 구축한다. 구축된 단계별 모형은 전산화의 기본 구성절차와 모듈 구성의 초기 자료로 사용되며, 기존 리스크관리의 세분화되고 전문화된 절차로 사용될 수 있다.

  • PDF

모듈러 건설현장의 단위작업별 안전관리 활동 및 중점 체크사항 제안 (Suggestion of Safety Management Activities and Key Check point for Safety Management in Modular Construction Sites)

  • 전영훈;김균태
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2022년도 봄 학술논문 발표대회
    • /
    • pp.202-203
    • /
    • 2022
  • In this study, focusing on work types of lifting modules and modules assembly in modular construction sites, unit works were defined according to the construction process of each work type, and safety management elements, safety management activities, and key check point were proposed. The results of this study may have somewhat overlapping contents in the construction procedure in order to derive specific safety management activities and check point for each unit work. Therefore, there is a limit to use the results in an actual modular construction site. In future research, we plan to improve this part and derive a checklist that considers field usability.

  • PDF

FUNCTION ORIENTED VE ALTERNATIVES EVALUATION PROCEDURE USING FUNCTION CLASSIFICATION

  • Jong-Hyeob Kim;Chang-Taek Hyun;Taehoon Hong
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1195-1200
    • /
    • 2009
  • Two important concepts in VE are "function" and "cost." Cost can be expressed quantitatively. Unlike cost, the function can only be expressed qualitatively. Thus, to accurately evaluate the performance in VE analysis, it is required that the functional aspect should be considered a qualitative one. This study suggests a procedure of function oriented evaluation which can evaluate function enhancement of a VE proposal more logically and objectively. To conduct this study, problems were induced via case analysis, and solutions were found. In addition, the existing simple evaluation procedures were corrected, and a function enhancement evaluation procedure via function classification was suggested. For function classification, the use of the concepts, which were "intended function" and "additionally obtained function," was suggested. Function oriented evaluation procedure to VE proposals which is suggested in this study is expected to be a great help in treating valuable functions through VE job plan.

  • PDF

IMPLEMENTATION OF PRODUCT DATA MANAGEMENT SYSTEM FOR DESIGN OF BRIDGE STRUCTURES

  • Jin-Suk Kang;Seung-Ho Jung;Yoon-Bum Lee;Kwang-Myong Lee
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1318-1323
    • /
    • 2009
  • In recent years, dramatic advances in information technology have motivated the construction industry to improve its productivity. Computer-based information technology includes Computer-Aided Design (CAD), Computer-Aided Engineering (CAE), Computer-Aided Manufacturing (CAM), Enterprise Resource Planning (ERP), Digital Mock-Up (DMU) and Product Data Management (PDM). Most construction industries are trying to apply these technologies for quality improvement, reduction of construction time and cost. PDM is very useful for managing data and process related to product design and manufacturing. PDM system has various functions such as drawing and engineering document management, product structure and structure modification management, part classification management, workflow management, and project management. In this paper, PDM system was applied to the design of steel-concrete composite girder bridge. To make a practical guidance for PDM implementation to bridge design, the procedure for its implementation was presented. Consequently, this paper could be useful to enhance the efficiency of bridge design.

  • PDF

WHAT IS THE VALUE AND IMPACT OF EARLY DISPUTE EVALUATION IN THE UK AND INTERNATIONALLY?

  • Francine Baker
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.350-356
    • /
    • 2011
  • Early neutral evaluation (ENE) is a fairly recent form of alternative dispute resolution procedure used in the construction industry. In the UK, ENE is usually carried out on an entirely without prejudice basis, however the parties may agree that any or part of it may be referred to at trial or any subsequent hearing. The early neutral evaluation consists of a preliminary assessment of the issues in dispute for use as a basis for negotiations which may result in a settlement of the dispute. An independent person is appointed by the parties who reviews the case and provides an opinion, in written form and in some detail, with reasons on the merits of the matters in dispute. The opinion is non-binding but provides the parties with what in the opinion of the independent person a formal tribunal may decide whether a court or an arbitrator, if the dispute is not resolved. However, ENE has yet to take off in the construction industry in the UK. This paper will explain this procedure and explore the use of it in the UK and internationally, considering the benefits and drawbacks of its use. It will consider whether or not it is more effective than other early resolution forms such as mediation and adjudication. It will argue and conclude that it is a very useful cost effective procedure, particularly in the resolution of complex disputes, whether local or international.

  • PDF

국내 건설폐기물 관리 지침 고찰 (A Review of the Domestic Construction Waste Management Guidelines)

  • 김지혜;차희성;신동우
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2007년도 정기학술발표대회 논문집
    • /
    • pp.425-430
    • /
    • 2007
  • 건설산업에서 폐기물 관리는 환경적${\cdot}$경제적 측면에서 중대한 영향을 미침에도 불구하고, 건설폐기물 관련 통계자료에 의하면 국내 건설폐기물 관리 수준이 상대적으로 낮음을 알 수 있다. 이에 따라 본 연구는 건설폐기물 관리의 요체인 건설폐기물 관리 지침을 고찰하여 문제점을 분석하고, 효과적인 폐기물 관리를 유도하는데 적합한 건설폐기물 관리 지침 개선 방향을 제시하고자 한다. 국내 기존 건설폐기물 관리 지침을 분석한 결과, 폐기물 관리의 목적이 총체적으로 법적인 기준을 벗어나지 않도록 관리하는 데 초점이 맞추어져 있음으로 인해 분석 기준인 "계획, 실행 및 운영, 점검 및 시정조치" 측면에서 효과적인 폐기물 관리 지침으로서의 역할을 다하고 있지 않음을 파악하였다. 또한, 문제점 분석 결과를 기반으로 "계획, 실행 및 운영, 점검 및 시정조치" 측면에서 국내 건설폐기물 관리 지침의 개선 방향을 제시하였다.

  • PDF

MEDIATION MECHANISM FOR CONSTRUCTION DISPUTE RESOLUTION IN TAIWAN

  • Chun-Yi Hwang;Nie-Jia Yau
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.357-363
    • /
    • 2011
  • Mediation has long been praised as one of effective dispute resolution methods in the area of construction law. Article 85-1 of the Taiwan Government Procurement Act was amended and promulgated by presidential decree on July 4, 2007. The second paragraph of the Article elaborates explicitly, "In the event that the application for mediation referred to in the preceding paragraph is made by the supplier, the agency may not object to such application." Beyond that, if an unsuccessful mediation of a construction dispute is due to the agency's disagreeing with the proposal or resolution for mediation proposed by the Complaint Review Board for Government Procurement ("CRBGP"), the agency may not object to the arbitration filed by the supplier. It undoubtedly reinforces the importance of the mediation-arbitration procedure. Accordingly, this paper elaborates on the mediation mechanism in Taiwan in the framework of construction disputes first. After that, dispute resolution of a local public work case is provided to demonstrate the practice of construction mediation in Taiwan. Lastly, this study proposes suggestions on applying mediation to ease similar subsequent cases.

  • PDF