• Title/Summary/Keyword: Construction management procedure

Search Result 321, Processing Time 0.028 seconds

A Model of Time Dependent Design Value Engineering and Life Cycle Cost Analysis for Apartment Buildings (공동주택의 시간의존적 설계VE 및 LCC분석 모델)

  • Seo, Kwang-Jun;Choi, Mi-Ra;Shin, Nam-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.6 s.28
    • /
    • pp.133-141
    • /
    • 2005
  • In the resent years, the importance of VE (value engineering) and LCC (life cycle cost) analysis for apartment building construction projects has been fully recognized. Accordingly theoretical models, guidelines, and supporting software systems were developed for the value engineering and life cycle cost analysis for construction management including large building systems. However, the level of consensus on VE and LCC analysis results is still low due to the lack of reliable data on maintenance. This paper presents time dependent LCC model based value analysis method for rational investment decision making and design alternative selection for construction of apartment building. The proposed method incorporates a time dependent LCC model and a performance evaluation technique by fuzzy logic theory to properly handle the uncertainties associated with statistics data and to analyze the value of alternatives more rationally. The presented time dependent VE and LCC analysis procedure were applied to a real world project, and this case study is discussed in the paper. The model and the procedure presented in this study can greatly contribute to design value engineering alternative selection, the estimation of the life cycle cost, and the allocation of budget for apartment building construction projects.

Problem Analysis and Improvement Scheme Based on Questionnaire Survey to Design VE Status for Apartment Buildings (공동주택 설계VE 현황 설문조사를 통한 문제점 분석 및 개선방안)

  • Kim, Young-Hoon;Kim, Yong-Su
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.4
    • /
    • pp.51-58
    • /
    • 2010
  • The purpose of this study is to analyze problems and suggest improvement scheme based on questionnaire survey to design VE status for apartment buildings. For this study, the adapted research methods are case studies of design VE to construction companies and questionnaire survay to design staffs. The results of this study are as follows: 1) In the system aspect, the problems of design VE for apartment buildings are insufficiency of regulation and difficulty of performing design VE actively. In the performance aspect, the problems is absence of design VE procedure suited to apartment buildings. 2) In the system side, the improvements of design VE for apartment buildings include regulatory enlargement of design VE application for apartment buildings and rearrangement of VE incentive system for design staffs. In the performance side, a VE procedure suited to apartment buildings is developed and suggested.

Enterprise Knowledge Management System(KMS) Construction - using Business Analytics Solution : A Case of KB Card (Business Analytics를 이용한 기업 지식관리시스템 구축 사례 연구)

  • Lee, Chung Keun;Lee, Soo Yong;Lee, Gun Hee
    • Knowledge Management Research
    • /
    • v.14 no.5
    • /
    • pp.137-149
    • /
    • 2013
  • Although business Intelligence system is introduced to many companies over the past decade, The result of business benefits from BI investment are not so significant than expected. But still successful BI system can provide the ability to analyse business information in order to support and improve management decision making across a broad range of business activities. In recently, Business Analytics System(BA) is emerging as advanced alternative of outdated and inefficient BI System. This study is focus on constructing procedure of BA system in KB card company, which is major credit card company in South Korea. In practice there were just few works that mentioned well-designed environment of KMS system, and other contribution of this study is to make a platform which invoke revelation of collective intelligence in data analytic professional users group.

  • PDF

A Study on the Construction and Improvement of Software Process Infrastructure for Software Firms In Korea (국내 소프트웨어 사업자의 프로세스 기반구조 구축 및 개선 방안 연구)

  • Ahn, Yeon-Shick;Moon, Song-Chul;Kim, Dong-Soo
    • Asia pacific journal of information systems
    • /
    • v.14 no.4
    • /
    • pp.23-47
    • /
    • 2004
  • This study was tried for the improvement of software process ability of the software firms, and analyzed empirically the impact that a software process infrastructure level influences on the software process level and process performance. The questionnaire were developed and data were collected from the process improvement correspondences or project quality managers of the 78 software firms. The result was shown that management-organization infrastructure was composed of software process improvement organization's role and activity, process standard and education, management system and supporting, management guides and procedures. And organization's standard development procedure or criteria, process asset, process support tools were included in technical infrastructure. This study provides that some components of software process infrastructure had an significant influence on the process level, process infrastructure management level, and software process performance.

A Study on the Application of an Integrated Management Software for a Petrochemical Plant Project (화공플랜트 프로젝트에서 통합관리 소프트웨어 적용에 관한 연구)

  • Kim, Yoon;Lee, Dong-Eon;Yoo, Ho-seon
    • Plant Journal
    • /
    • v.6 no.2
    • /
    • pp.56-61
    • /
    • 2010
  • In this paper, an integrated management software is developed to promote the business competitive power. The interoperability among the software accounts for an ever growing performance of petrochemical plant project. If the interoperability is built up, company has taken advantages of quality, schedule, cost, and safety by active communication. The advantage of an integrated management software is examined in three aspects. In efficiency aspect, It takes advantage of the saving about the various information and the standard of project performance procedure. In quality, the integration gave aid to a quality improvement through team collaboration and data management within project life cycle. In cost, poor communications between systems waste 30% of project costs. If information could be inputted once and used by all, reductions in delivery time up to 40% were possible. Therefore, 10% savings of engineering cost was also possible.

  • PDF

Selection on the Order of Priority Factor of Construction Key Technology for Improving the Flexibility for a Long Life Apartment Housing at the Next Generation (차세대 장수명 공동주택의 가변성능향상을 위한 건축요소기술 우선순위결정에 관한 연구)

  • Lee, Jeong-Seok;Cho, Gun-Hee;Sohn, Jeong-Rak;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.2
    • /
    • pp.84-92
    • /
    • 2009
  • Recently, lots of the research aspects of space, materials, structure, construction method relation to improving the flexibility going on throughout the construction industry, moreover the development of construction key technology has been accelerating by reason of deterioration in the apartment housing. Therefore, this study should firstly suggests assessment list of construction key technology through investigation of questionnaire and consultation of the expert on the basis of case studies, and should select it about the flexibility which making social issues lastly in the apartment housing. Secondly, this study should classify, reestablish core technology through inspection procedure of feasibility study among lists of deduced key technology. Finally, this study will suggest the manual & guideline for improving the flexibility for a long-life apartment housing at the next generation by selecting, analyzing and estimating higher score items of all key technology.

LCCA-embedded Monte Carlo Approach for Modeling Pay Adjustment at the State DOTs (도로공사에서 생애주기비용을 사용한 지급조정모델 개발에 관한 연구)

  • Choi Jae-ho
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.72-77
    • /
    • 2002
  • The development of a Pay Adjustment (PA) procedure for implementing Performance-related Specifications (PRS) is known to be a difficult task faced by most State Highway Agencies (SHAs) due to the difficulty in such areas as selecting pay factor items, modeling the relationship between stochastic variability of pay factor items and pavement performance, and determining an overall lot pay adjustment. This led to the need for an effective way of developing a scientific pay adjustment procedure by incorporating Life Cycle Cost Analysis (LCCA) embedded Monte Carlo approach. In this work, we propose a prototype system to determine a PA specifically using the data in the pavement management information systems at Wisconsin Department of Transportation (WisDOT) as an exemplary to other SHAs. It is believed that the PRS methodology demonstrated in this study can be used in real projects by incorporating the more accurate and reliable performance prediction models and LCC model.

  • PDF

A Management Procedure of Required Operational Capability for 'Low-cost and High-efficiency' Weapon Systems Development ('저비용 고효율'의 무기체계 개발을 위한 군 작전요구성능 관리절차 개선 방안)

  • Lee, Ok-Kyu;Kang, Seok-Joong
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.37 no.1C
    • /
    • pp.109-117
    • /
    • 2012
  • Studying the major wars of the past seventy years, the most fundamental change is the transition of weapon systems to one of convergence and cutting edge / state of the arts technology. Such transition is creating a need for drastic reforms of the weapon systems development process especially in areas of / in regards to effective utilization of IT, reduction of development period, precise establishing of operational concept and, management of required operational capability(ROC). In particular, establishing an accurate operational concept for a new weapon system and efficient management of ROC based on this operational concept is a prerequisite for a low-cost and high-efficiency weapon systems development and in the end, a successful construction of military forces. This paper examines the current management procedure of the ROC of the Korean military and proposes improvements to the procedure while taking into consideration issues of elicitation, analysis and validation of requirements engineering.

STRUCTURED WEBSITE CONTENTS CONSTRUCT METHOD AND ITS EVAUATIONS

  • Okada, Mamoru;Yamaoka, Toshiki;Matsunobe, Takuo
    • Proceedings of the Korean Society for Emotion and Sensibility Conference
    • /
    • 2001.05a
    • /
    • pp.125-130
    • /
    • 2001
  • We evaluated structured web site contents construct method. The method for construction web contents was considered. The construction procedure is as follows. Elicit "user requirement" and the web management side needs. Mark a check where each line and row corresponds to clarify the relation between both in the matrix by which user requirements and the purposes are arranged in lines and rows. To understand the systematic feature of the web site itself, "grasping information" and "structuring" are necessary. We actually constructed web site contents of a theatrical company using this method. and we got the construction of existing web site contents of another theatrical company. We compared our constructed web site contents with the existing web site contents. Finally, we evaluated this method and testified that this method is useful.

  • PDF

A Construction of Fuzzy Model for Data Mining (데이터 마이닝을 위한 퍼지 모델 동정)

  • Kim, Do-Wan;Park, Jin-Bae;Kim, Jung-Chan;Joo, Young-Hoon
    • Proceedings of the Korean Institute of Intelligent Systems Conference
    • /
    • 2002.12a
    • /
    • pp.191-194
    • /
    • 2002
  • In this paper, a new GA-based methodology with information granules is suggested for construction of the fuzzy classifier. We deal with the selection of the fuzzy region as well as two major classification problems-the feature selection and the pattern classification. The proposed method consists of three steps: the selection of the fuzzy region, the construction of the fuzzy sets, and the tuning of the fuzzy rules. The genetic algorithms (GAs) are applied to the development of the information granules so as to decide the satisfactory fuzzy regions. Finally, the GAs are also applied to the tuning procedure of the fuzzy rules in terms of the management of the misclassified data (e.g., data with the strange pattern or on the boundaries of the classes). To show the effectiveness of the proposed method, an example-the classification of the Iris data, is provided.