• Title/Summary/Keyword: Construction level

Search Result 4,375, Processing Time 0.032 seconds

Modeling Laborers' Learning Processes in Construction: Focusing on Group Learning

  • Lee, Bogyeong;Lee, Hyun-Soo;Park, Moonseo
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.154-157
    • /
    • 2015
  • Construction industry still requires a lot of laborers to perform a project despite of advance in technologies, and improving labor productivity is an important strategy for successful project management. Since repetitive construction works exhibits learning effect, understanding laborers' learning phenomenon therefore allows managers to have improved labor productivity. In this context, previous research efforts quantified individual laborer's learning effect, though numerous construction works are performed in group. In other words, previous research about labor learning assumed that sum of individual's productivity is same as group productivity. Also, managers in construction sites need understanding about group learning behavior for dealing with labor performance problem. To address these issues, the authors investigate what variables affect laborers' group level learning process and develop conceptual model as a basic tool of productivity estimation regarding group learning. Based on the result of this research, it is possible to understand forming mechanism of learning within the group level. Further, this research may contribute to maximizing laborers' productivity in construction sites.

  • PDF

10-10 Project Campaign: 10 Input Measures Influencing Project Outcomes

  • Choi, Jiyong;Kang, Youngcheol;Yun, Sungmin;Mulva, Stephen;Oliveira, Daniel
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.200-204
    • /
    • 2015
  • This paper presents 10 input measures influencing project outcomes. Construction Industry Institute (CII), a consortium of more than 130 project owner and contractor companies, has collected project-level data for over 20 years. Recently, CII has developed a new system measuring project-level performance and factors presumably influencing project performance. The system, called 10-10, collects data for 10 input and 10 output measures for capital projects. The input measures include planning, organizing, leading, controlling, design efficiency, human resources, quality, sustainability, supply chain, and safety. This paper provides theoretical background for these measures. Although the input measures have been known to impact on project outcomes such as cost and schedule, there has been no study quantitatively evaluating how they are operated in the construction industry. This study contributes to revealing the current status of their uses, which will be helpful in establishing strategies improving construction project performance.

  • PDF

An Analysis of a Request for the Development of Computer Application Technology in an Architectural Construction Management System (건축공정 관리시스템의 전산적용 최적화를 위한 시스템 개발 요구 분석)

  • Kwon, Choon-An;Ji, Suk-Won
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.6
    • /
    • pp.567-575
    • /
    • 2011
  • With the development of construction information, a computerization tool for architectural process control is a necessary tool. However, the reality is that the conditions and understanding of users are not sufficient to fully utilize such a tool. In particular, it was analyzed that the reason for the negative feedback from hands-on workers regarding the current process control information system is that there is a difficulty in accessing the system for users that are not process and planning experts, due to a lack of information and technical contents at the phase of control and planning prior to the process plan. Therefore, the demands of users and a direction for the improvement of a system in terms of optimizing process control computerization were investigated, with the aim of addressing the disadvantages of the existing system and developing a professional system that is specialized in the construction industry. Therefore, it is necessary to construct an integrated WBS (IWBS) that combines WBS with CBS, and subsequently, it is judged that the most important aspect is the integrated technology of compatibility and operation of data that is linked with OBS. The process information must then deal with the changing information; in other words, the amount of construction, construction cost, and the required construction period etc., by coding data into a 4-unit index, such as a project unit (WBS Level 1), a project facility unit (WBS Level 2), a management department unit (OBS Level 1), and a control manager unit (OBS Level 2). After that, it was found that it is necessary to develop a computer system to consistently integrate process information into a management department.

CORPORATE GOVERNANCE PRACTICE OF TAIWAN LISTED CONSTRUCTION COMPANIES AND ITS CORRELATION WITH INDUSTRIAL FEATURES

  • Hui-Yu Chou
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.413-419
    • /
    • 2011
  • Corporate governance is a system articulating the division of responsibilities among different company members, and defining the running rules and procedures for making decisions on corporate affairs. The separation of ownership and management in modern enterprises brings agency problems to the company shareholders, and it is wildly believed that good practice on corporate governance is essential to prevent managers from taking actions by which profiteering their own benefits but compromising the interests of shareholders. This research investigates the level of companies' compliance with the corporate governance codes to find whether significant differences in corporate governance practice exist between the listed construction companies and the national leading companies in Taiwan. Further exploration focuses on the correlation between the compliance level and the industrial features. The investigation finds that: (1)Construction companies display lower levels of corporate governance compliance; (2)Construction companies display lower levels of structural board independence and respect for stakeholders; (3)Compliance levels of construction companies are correlated with the number of employees and the ownership concentration; (4)Compliance levels of the whole sample companies are correlated with the factors representing firm size, such as turnover, capital and number of employees, but are independent of profitability as well as stock price volatility. The above empirical evidence characterizes the features of corporate governance in Taiwan listed construction companies, including: (1)Large companies lurking high risk of agency problems have more willingness to conduct corporate governance and meanwhile can afford higher costs for the conduction, so that their compliance level would be higher than smaller companies; (2)Construction companies in Taiwan have higher ownership concentration, on account of the industrial tradition of family business, and therefore pay less attention to the compliance with structural board independence and respect for stakeholders. However, the conclusions indicate that further studies are essential to clarify whether the above disparities would lead to a negative cycle of corporate governance practice in construction industry. The benefits of corporate governance should unfold more evidently to convince construction companies for improving their investment environment and stimulating their healthy growth.

  • PDF

AN EXAMPLE OF REPRESENTING THREE LEVEL'S SCHEDULES WITHIN SCHEDULE HIERARCHY BY BDM TECHNIQUE

  • Seon-Gyoo Kim
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.445-452
    • /
    • 2011
  • The schedule hierarchy in construction project is generally composed of three levels. The highest level is a milestone schedule and represented by Bar Chart format. The middle level is an integrated project schedule (IPS) and represented by CPM (Critical Path Method) format. The lowest level is a detail working schedule and usually represented by Bar Chart. The traditional scheduling techniques such as ADM (Arrow Diagramming Method) or PDM (Precedence Diagramming Method) cannot represent all kinds of schedule within schedule hierarchy as identical schedule format. However, the BDM (Beeline Diagramming Method) technique can represent all kinds of schedule within schedule hierarchy as identical CPM format. This paper describes the basic concept, principle, interpretation methods, and schedule computation methods of the BDM as a new networking technique that can represent all kinds of overlapping relationships between activities, and then presents an example of representing three level's schedules within schedule hierarchy by the BDM technique.

  • PDF

Effects of the Safety and Health Management System on Safety and Health Management Level and Accident Indicators in Construction Industry (건설업의 안전보건경영시스템 인증이 안전보건관리수준과 사고지표에 미치는 영향)

  • Kim, Panki;Lee, Sudong;Jung, Kihyo
    • Journal of the Korea Safety Management & Science
    • /
    • v.24 no.3
    • /
    • pp.15-21
    • /
    • 2022
  • This study examined the certification effects of safety and health management system (SHMS) on the establishment level of SHMS and accident statistics in construction industry. This study obtained the establishment level of SHMS for 106 construction companies surveyed from our previous study. In addition, three major accident statistics (mortality rate, accidental mortality rate, and injury rate) for the companies were collected from the database in Korean Occupational Safety and Health Agency. The statistical analysis results revealed that the establishment level for SHMS certified companies was significantly higher than those for uncertified or certification preparing companies. Furthermore, SHMS certified companies showed significantly smaller accident statistics compared to uncertified or certification preparing companies. The results of this study support the positive effects of SHMS on reducing major industrial accidents in construction companies.

Study on the development of Quantitative assessment indicator of safety culture for the construction site (건설현장 안전문화의 정량적 평가지표 개발에 관한 연구)

  • Jun, Heakyung;Kwon, Changhee
    • Journal of the Society of Disaster Information
    • /
    • v.12 no.4
    • /
    • pp.403-411
    • /
    • 2016
  • The objectives of this study is to develop evaluation indicators for the quantitative evaluation of construction safety culture level in order to prevent accidents by evaluating the level of safety culture and each safety culture elements of the construction site and to present the areas that should be focused on improvements. In this study, it was presented assessment indicators of the construction safety culture by analyzing previous studies for safety culture, by categorizing items as an important element of safety culture hierarchically and by reflecting the opinion of the construction site professional personnels using AHP analysis methodology. The assessment indicators of the construction safety culture were structured the details of the leadership, systems, and personal characteristics and derived weighted value by the pairwise comparison to quantify the detail assessment indicators in order to assess the construction safety culture level. This study presents a safety culture assessment indicators for the construction site to suggest directions for improving the construction site safety culture and prevent the accidents of the construction site by derived via a safety culture assessment of construction site.

A Study on the Competitiveness of Green Construction in Construction Firms (건설기업의 녹색건설 경쟁력 요인에 관한 연구)

  • Lee, Eui-Dong;Lee, Jae-Wook;Kim, Han-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.5
    • /
    • pp.125-134
    • /
    • 2012
  • In the construction industry, "Green" is emerging as a keyword of new growth engine. Since green construction competitiveness is essential for contractors' survival and growth, it is important to understand what constitutes green construction competitiveness. The objective of the study is to identify elements of green construction competitiveness and to discuss relationships between their importance and current level based on the Gap analysis. A better understanding of the elements of green construction competitiveness assists contractors in formulating green strategies. It also provides insight into what motivates contractors in establishing related policies and regulations. The study identifies that in general there exists a gap between the importance and current level of green construction competitiveness. It also demonstrates that CEO' competence shows a less gap between the importance and current level but firms' competence is an area of weakness. Finally a substantial gap is observed in the field of green R&D strategies and sub-contracting partners.

Causal Relationship Analysis of the Factors Lowering Productivity in Construction Job Site (건축공사 현장의 생산성 저하요인 인과관계 구조분석)

  • Jung, Yunho;Kim, Dongwook;Hong, Minki;Jang, Hyounseung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.1
    • /
    • pp.99-110
    • /
    • 2020
  • Productivity is also a very important indicator in the construction industry as it can measure economic growth and the efficiency of each related production activity, either at the industrial level or at the corporate level. Technical factors indeed have a great impact on productivity, but in order to improve productivity in the actual construction industry, various productivity factors must be analyzed first, and the efforts to improve productivity at the project level are more important than the efforts to improve productivity at the construction industry level, which are addressed from a macro perspective. This study was designed to provide basic data for efficient productivity management activities of the project by selecting priority management factors through the causal analysis of the factors and the elicitation of the productivity degradation factors at the construction site to improve the quality of the construction industry.

Investigation on Level of Emergency Treatment Performance on Building Construction Sites in Jeju (제주지역 건설현장의 응급처치 대응수준에 대한 조사연구)

  • Kang, Soon-Min;Jang, Myung-Houn
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.2
    • /
    • pp.211-219
    • /
    • 2012
  • On January 27, 2005, the central government of the Republic of Korea designated Jeju Island as an Island of World Peace based on Article 12 of the Special Act for the Jeju Free International City, and the WHO designated Safe Community Jeju in July, 2007. Whenever an industrial accident occurs on Jeju Island, reports in the media raise the question of whether Jeju is a safe city or not. But due to the characteristics of construction sites in Jeju, it is very difficult to employ workers of a certain level. For the safety of workers, it is also thought that owners should make a decisive investment to introduce an education and reward system in order to improve the consciousness level of workers. This research focuses on first-aid on construction sites. It then surveys the level of construction safety management, and suggests improvements in construction safety control and first-aid.