• Title/Summary/Keyword: Construction level

Search Result 4,375, Processing Time 0.222 seconds

Study on Landscape Preference of Debris Barriers Types (사방댐의 유형별 경관선호 분석)

  • Lee, Sang-Won;Kang, Mi-Hee;Lee, Heon-Ho
    • Journal of Korean Society of Forest Science
    • /
    • v.100 no.2
    • /
    • pp.283-291
    • /
    • 2011
  • The purpose of this study was to identify the public's preferences of different types of debris barriers and the impacts of construction materials, design, size, and planting on landscape preferences. On-site survey was carried out in Mt. Palgong during on December, 2009 and a total 122 visitors' data were analyzed. A total of 82 students Yeungnam and Donga University were also questioned in the classes during on December, 2009. Survey results showed that the debris barrier constructed with natural materials such as stone were more preferred and the level of planting around the debris barrier impacted most on the landscape preferences. The results imply that the importance of eco-friendly construction materials and methods has been increased in term of not only environmental conservation but also people's preferences. Therefore, the factors for enhancing landscape of debris barrier should be considered synthetically in terms of construction material, design, size, and planting level.

Linking LOD and MEP Items towards an Automated LOD Elaboration of MEP Design

  • Shin, Minso;Park, SeongHun;Kim, Tae wan
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.768-775
    • /
    • 2022
  • Current MEP designs are mostly applied by 2D-based design methods and tend to focus on simple modeling or geometry information expression such as converting 2D-written drawings into 3D modeling without taking advantage of the strength of BIM application. To increase the demand for BIM-based MEP design, geometric information, and property information of each member of the 3D model must be conveniently linked from the phase of the Design Development (DD) to the phase of Construction Document (CD). To conveniently implement a detailed model at each phase, the detailed level of each member of the 3D model must be specific, and an automatic generation of objects at each phase and automatic detailing module for each LOD are required. However, South Korea's guidelines have comprehensive standards for the degree of MEP modeling details for each design phase, and the application of each design phase is ambiguous. Furthermore, in practice, detailed levels of each phase are input manually. Therefore, this paper summarized the detailed standards of MEP modeling for each design phase through interviews with MEP design companies and related literature research. In addition, items that enable auto-detailing with DYNAMO were selected using the checklist for each design phase, and the types of detailed methods were presented. Auto-detailing items considering the detailed level of each phase were classified by members. If a DYNAMO algorithm is produced that automates selected auto-detailing items in this paper, the time and costs required for modeling construction will be reduced, and the demand for MEP design will increase.

  • PDF

Basic Study on the Establishment of AI Convergence Education Room (인공지능융합교육실 구축에 관한 기초연구)

  • Kim, Jeong-Rang
    • 한국정보교육학회:학술대회논문집
    • /
    • 2021.08a
    • /
    • pp.321-326
    • /
    • 2021
  • In this paper, the information education plan of the Ministry of Education and offices of education was analyzed in relation to the construction of the AI convergence education room. And based on this, an appropriate construction direction was suggested. For research, AI convergence education room construction plan, budget amount per school and etc were analyzed in the information education plan of the Ministry of Education, KERIS, KOFAC, and the plan of leading schools for AI education. Although the Ministry of Education is making various efforts to promote SW education and artificial intelligence convergence education, it is found that the number is far insufficient compared to the number of elementary, middle and high schools. Efforts to expand the information education room at the government level are continuously required, and in order to utilize the developed artificial intelligence convergence education room, it is necessary to provide abundant teaching and learning examples for the construction space model. In addition, school-level planning and execution must be followed so that the constructed space can be used appropriately, and management and maintenance plans for equipment are required.

  • PDF

A Case Study on Information Strategy Plan of the Web Based on Project Management Information System for Construction Company (전사 웹기반 사업관리시스템 구축을 위한 정보화전략계획에 관한 사례연구)

  • Park, Hyung-Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.2D
    • /
    • pp.259-267
    • /
    • 2008
  • Nowadays PMIS (Project Management Information System) based on web is widely applied to communication, collaboration and community in construction jobsite for various organization such as subcontractors, general contractor, engineering company, supervisors and client. However, individual PMIS in jobsite is prone to be troublesome issue for integration and exchange of information regarding project management in corporate and may result in conflict of data application. The main reason should be lack of information strategy plan such as company master plan for information. This research shows a critical success factor that a big construction company of Korea establishes procedure and method for information strategy plan. In addition, It is to suggest how to be implemented PMIS architecture and execute business process innovation in corporate level. This research expects contribution that many construction companies reduce mistakes to be implemented management information system and to optimize system in corporate level.

A Case Study of Implementation for Cash Flow Forecasting System in a Construction Company (건설회사 현금흐름예측시스템 구축방법에 대한 사례연구)

  • Park, Hyung-Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.3D
    • /
    • pp.391-397
    • /
    • 2009
  • This research introduces the implementation for cash flow forecasting system in construction company through a case study. The implemented system shows how to develop overall corporate-level and project-level cash flow forecasting model based on a real business process in construction company. It takes 1 year to implement system. The study proposes the way of system design, process of system design, and considerations of implementation in step by step. Moreover, it shows main screen, limitation and reliability of the system. The proposed model is validated accurate, flexible and simple as a result of comparing actual data to forecasting data for 2 years. This system is easy to approach the employee who don't have any financial knowledge. This research is expected to assist to implement system of cash flow forecasting in construction company.

MODEL-BASED DESIGN FOR HIGH ANTONOMY SYSTEMS

  • Chi, S.D.;Zeigler, B.P.;Park, S.H.
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1991.10b
    • /
    • pp.1585-1590
    • /
    • 1991
  • This paper presents the principles for design of autonomous systems whose behavior is based on models that support the various tasks that must be performed. We propose a model-based architecture aimed at reducing the computational demands required to integrate high level symbolic models with low level dynamic models. Model construction methods are illustrated to outfit such an architecture with the models needed to meet given objectives.

  • PDF

An Evaluation Model of Quality System (품질시스템 평가모델)

  • 김종수;황승국
    • Journal of Korean Society for Quality Management
    • /
    • v.27 no.4
    • /
    • pp.95-113
    • /
    • 1999
  • This paper is to propose an evaluation model of quality system using the concept from the evaluation method of each stage in QFD(Quality Function Deployment). The data of the performance level and weights for the quality system and the job on quality loop in each enterprise has been obtained from the 8 experts who are in charge of quality system construction. Here, the weights were computed by means of the eigenvector method. In this paper, we can acquire the evaluated score for the present level of the quality system. This method will help to manage and improve the quality system. We show the efficiency of this method by illustrating case studies.

  • PDF

Construction and Management of Hydrological Observation Network in Yi-dong Rural Basin (농촌유역 수문관측망 구축.운영(이동유역))

  • Park, Jae-Heung;Kim, Jin-Taek;Lee, Yong-Jig
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 2002.10a
    • /
    • pp.261-264
    • /
    • 2002
  • Yi-dong experimental basin is operated for research on the rural basin characteristics and accumulation of a long term data by hydrological observation equipments. It is basin area 9,440ha, length 14.4km and slope 0.67%. Hydrological observation network is constructed of rainfall meter 4points, reservoir storage level 3points and river water level 2points.

  • PDF

Derivation of information for R&D management with technology relation analysis (기술연관분석을 이용한 연구개발 의사결정 정보 도출 - 한국가스공사 연구개발사업 적용을 중심으로 -)

  • 오경준
    • Journal of Korea Technology Innovation Society
    • /
    • v.3 no.3
    • /
    • pp.67-84
    • /
    • 2000
  • This paper expanded the usefulness of technology relation analysis by applying to R&D activities of Korea Gas Corporation (Kogas) at the corporate level. Technology relation analysis has been applied to assessment of R&D investments in telecommunication and construction industries in Korea. As empirical findings, technology map and technology spillover matrix of Kogas have been derived by technology similarity analysis. It has bee found that various useful information for R&D assessment could be acquired from the technology relation analysis at the corporate level.

  • PDF

지하수 채수에 따른 지반침하 사례분석

  • 정하익;구호본
    • Proceedings of the Korean Society of Soil and Groundwater Environment Conference
    • /
    • 2001.09a
    • /
    • pp.168-171
    • /
    • 2001
  • It is a common practice to extract water from the ground for domestic, agricultural or industrial uses or to lower the groundwater level for construction work. An accurate prediction of ground settlement Is sometimes crucial when groundwater is pumped. This case study have shown that drawdown of the groundwater table may cause ground subsidence. Many settlement gauges was installed in the vicinity of a pumped well to measure the surface settlement. The relationships between the level of groundwater drop and surface settlement is investigated In this research.

  • PDF