• Title/Summary/Keyword: Construction level

Search Result 4,375, Processing Time 0.035 seconds

Analyzing the Level and Influence Factors for Work Performance of Field Managers in General Construction Companies (일반건설업체 현장관리자의 직무별 업무수행수준 및 영향요인 분석)

  • Park, Kyoung-Hun;Son, Chang-Baek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.3
    • /
    • pp.115-124
    • /
    • 2010
  • Along with the recent economic downturn, domestic construction companies have also faced with many difficulties and obstacles. To overcome this situations, now they are trying to continuous efforts to improve efficiency and productivity of project performance through many means including the reduction of fixed cost expenditures. Level of work performance of construction field managers is very important factor of productivity improvement for successive performance of construction project. This study attempts to analyse level and influence factors for work performance of field managers in construction companies through analysis of work burden and level of work performance. Also this study attempts to present basic data of the improvement directions for enhancing construction efficiency and productivity in future.

Site Mitigation Plan for Noise Sources from Construction Sites by Developing Movable Noise Barriers (건설공사장 이동식 방음시설물의 음향특성)

  • Lee, Sung Chan;Chung, Jin Yun;Im, Jung Bin
    • Transactions of the Korean Society for Noise and Vibration Engineering
    • /
    • v.25 no.1
    • /
    • pp.58-64
    • /
    • 2015
  • There are a lot of different types of noise from construction site and it depends on construction stage, equipment type and number of operating equipments. The problem is that the almost noise from construction site is high level and some kinds of noise levels are over 100 dB. In addition, if construction site is located in downtown, there are a few options to reduce noise level. Therefore several site mitigation plans were developed to reduce different types of construction noises such as breaker work, gang form and asphalt saw. They were applied in site and evaluated noise reduction performance. The test result of site insertion loss was between 4~8 dB depends on the equipment and type of work.

Characteristics of Construction Machinery Noise and Vibration (건설기계류 소음·진동 특성)

  • Kang, Daejoon;Lee, W.S.;Lee, J.W.;Hong, J.K.
    • Transactions of the Korean Society for Noise and Vibration Engineering
    • /
    • v.15 no.6 s.99
    • /
    • pp.645-651
    • /
    • 2005
  • The construction noise Is one of the main causes of environmental impact. The complaints about it have been increasing every year. In order to reduce construction machinery noise, the product noise labeling for construction machinery has been recommended since 1 February 1996 and In the near future the government will convert the recommended product noise labeling to the mandatory product noise labeling for high noise construction machinery. Therefore, we investigated the noise and vibration level of 302 construction machines in construction work sites. This paper presents the basic data that will be used for setting the standard of construction machinery noise and predicting the noise level near construction work sites in environmental Impact assessment.

Characteristics of Construction Machinery Noise (건설기계류 소음 특성)

  • 강대준;이우석;이재원;이석조;홍준기
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2004.05a
    • /
    • pp.548-553
    • /
    • 2004
  • The construction noise has been considered as one of environment pollution and complaints about it have been increasing every year. In order to reduce construction machinery noise, the product noise labeling for construction machinery has been recommended since 1 February 1996 and in the near future the government will convert the recommended product noise labeling to the mandatory product noise labeling fir high noise construction machinery. Therefore, we investigated the noise and vibration level of 302 construction machines and the effect of noise reduction for the soundproof facilities in construction work sites to support the policy of the government. Additionally, we present the basic data that will be used for setting the standard of construction machinery noise and predicting the noise level near construction work sites in environmental impact assessment.

  • PDF

Site mitigation plan for Different types of Construction noises (건설공사장 이동식 방음시설물의 음향특성)

  • Lee, Sung Chan;Chung, Jin Yun;Im, Jung Bin
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2014.10a
    • /
    • pp.490-494
    • /
    • 2014
  • There are a lot of different types of noise from construction site and it depends on construction stage, equipment type and number of operating equipments. The problem is almost noise from construction site is high level and some kinds of noise levels are over 100dB. In addition, if construction site is located in downtown, there are a few options to reduce noise level. Therefore several site mitigation plans are developed to reduce different types of construction noises and it is applied in site and evaluated noise reduction performance in this study.

  • PDF

A study on the Project Management Plan (PMP) Development Appropriate for Global Construction Environment (글로벌 건설 환경에 적합한 건설사업관리계획서(PMP)에 관한 연구)

  • Yang, Myung-duck;Kim, Chang-kwon;Yang, Jae-woong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.107-108
    • /
    • 2015
  • It's became essential that Korea construction companies should enter into the overseas construction market for their growth and sustainability. In order to comply with the client's required global standard and to compete with in the international market, the shifting the construction project management system to global level is required. In accordance with the demand, this paper proposes the top-level document of construction project management system as a to-be model that utilized in overseas construction projects. The project management plan ("PMP") suggested in this paper is not only the most appropriate one, which complies with the global standard, to be used when companies bid for international construction projects against foreign competitors but also has the process modeling and hierarchical structure.

  • PDF

Analysis of North Korea's Residential Environment Satisfaction According to Construction Method (건축공법에 따른 북한의 주거환경 만족도 분석 연구)

  • Kim, Eun-Young;Baek, Cheong-Hoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.06a
    • /
    • pp.222-223
    • /
    • 2020
  • Recently, as the era of economic cooperation on the Korean Peninsula approaches, the role of the building sector, such as humanitarian reorganization of North Korean housing, is increasing. The purpose of this study is to find out the current location of North Korean housing standards through the North Korean Housing Survey. For the survey, a survey was conducted through 79 North Korean defectors. The main construction methods of North Korean housing are reinforced concrete, steel framed, wooden framed, masonry, and reinforced concrete walled and prefabricated. The residential environment satisfaction items consist of durability, waterproof, heating, ventilation, heat insulation, air tightness, mining, soundproofing, disaster safety, fire safety, and crime prevention. The result is as follows. The housing construction method in North Korea, which lived at that time, consisted of 21 people (30.88%) of reinforced concrete frames, 18 people (26.47%) of wooden frames, 17 people (25%) of masonry walls, 5 people of prefabricated structures (7.35%), and reinforced concrete. Two people (2.94%) were walled. Among these, the wooden frame type had the lowest satisfaction level for each item, and the reinforced concrete had a high level of dissatisfaction in the items of heating, confidentiality, and disaster safety, and the other item had a high level of satisfaction. The masonry wall type has a relatively high satisfaction level in terms of insulation, confidentiality, mining, and disaster safety.

  • PDF

A Comparative Study on the Usage Level of Construction Management Services during Pre-Construction Stages - Focused on Public and Private Building Projects - (시공이전단계 CM서비스 활용수준 비교에 관한 연구 - 공공 및 민간 건축CM사업을 중심으로-)

  • Cho, Hong-Keun;Kim, Han-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.3
    • /
    • pp.112-120
    • /
    • 2011
  • Since early 2000s, the use of construction management(CM) in the public and private building sectors has rapidly grown in Korea. In addition, the use of CM services during pre-construction stages has been increasingly recognized as a critical factor to succeed in construction projects. Understanding clients' needs of pre-construction CM services is important for CM firms to strategically prepare and cope with market needs. The objective of the paper is to investigate and compare the usage level of CM services in public and private building projects during pre-construction stages, and to identify key characteristics and implications for CM firms. The paper identified that although there are some differences in CM service needs between public and private sectors, time management and cost management commonly showed the higher usage level.

A Basic Study on the BIM Service Based SLA for Setting the Application Level of BIM in the Procurement Phase (발주단계에서 BIM의 적용수준 설정을 위한 SLA 기반의 BIM 서비스에 관한 기초연구)

  • Kim, Ji-Yun;Yun, Seok-Heon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.251-252
    • /
    • 2016
  • Recently policy and clouding system to mandate the introduction of BIM in construction industry, various sensors technology, BIM in ICT technology and fusion, such as 3D scanning and printing technology has been further activated. However, the expression level of diversification associated with it, plan within one of the BIM project, design, engineering, it is difficult to have a different application has been consistent for each field, such as construction. Thus fell the efficiency of BIM apply, it is difficult to determine the appropriate level of BIM in the business early stage in order destination of position. In this study, in order to solve this problem, by utilizing SLA used in the IT field, it attempts to explore scheme which can be evaluated targeted level of BIM suitable for business in the planning phase.

  • PDF

A Study on the Technology Level Assessment of Road Construction in Korea (한국의 도로분야 기술수준 분석에 관한 연구)

  • Kim, Kyong-Hoon;Lee, Du-Heon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.4
    • /
    • pp.129-138
    • /
    • 2015
  • In this study, the road construction field of high impact in the construction industry were selected, and the analysis of the detailed technology level was carried out. and we derived the main fields for future overseas. As results, the technology level of road facilities in korea was high about road operations and management sector, while it was relatively row about road pavements. And this study, we analyzed the economic, social and technological priority, and derived main fields to have the high investment efficiency. A derived items are found to be "maintenance-free Modular Road Pavements" and "Cities temperature reduction-type road".