• Title/Summary/Keyword: Construction level

Search Result 4,375, Processing Time 0.034 seconds

Post Occupancy Evaluation of the Central Hospital in Quang Nam Province of Vietnam Funded by Korean ODA (ODA 지원 베트남 중부 꽝남성 종합병원의 거주후 평가)

  • Kwon, Soon Jung;Yu, Yeo Kyoung;Kim, Jihyun;Bang, Seol Ah
    • Journal of The Korea Institute of Healthcare Architecture
    • /
    • v.22 no.1
    • /
    • pp.39-49
    • /
    • 2016
  • Purpose: This is the ex-post evaluation on "the Central General Hospital in Quang Nam Province in Vietnam" funded by Korean ODA. Through this evaluation, this study tries to explore useful ways to improve the effectiveness of Korean ODA projects related to hospital establishment. Methods: Field survey and analysis of questionaire to the staffs and patients of Quang Nam Province General Hospital were conducted twice in 2012 and 2014 after the completion of the Hospital. Two sets of surveys and questionaire outcomes have been comparatively analysed by statistics in order to seek the trend of satisfaction level of hospital users and find out the improvement way in hospital design and construction. Results: The satisfaction level on the hospital was relatively high and that of 2014 is higher than that of 2012. The satisfaction level of the users was recorded in Likert 5 scales. Continuous facility complement and maintenance is considered as the main contributor in increasing the satisfaction level of users. As far as the satisfaction level of outpatient is concerned, that of 2012 was recorded as 3.65 and that of 2014 was 4.05. In case of inpatient, the satisfaction level on the hospital in 2012 was 3.76, and 4.06 in 2014. Implications: In overseas hospital projects, proper hospital project management system including medical service plan, strategic plan, brief, design & construction and maintenance have to be put together effectively and efficiently for the success of the hospital project. At the same time local climate, culture, building material and local code have to be considered in order to build sustainable hospital.

A Study on the Method for Judging the EMP Protection Plan and Required Level through Decision Making (의사결정론을 통한 EMP 방호대책 및 수준 판단방안 제시에 관한 연구)

  • Kim, Kuk-Joo;Park, Sang-Woo;Baek, Jang-Woon;Park, Young-Jun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.19 no.2
    • /
    • pp.193-200
    • /
    • 2019
  • In the context of increasing threats of EMP by neighboring countries in the security situation on the Korean peninsula, EMP protection facilities are a very important means of ensuring military operational capability. These EMP protection facilities should be constructed by comprehensively judging various factors about operation units. However, Defense Military Facilities Criteria and National Technical Guideline for EMP protection require at least 80dB shielding effectiveness without considering other options. In this study, we use objective and statistical methods to refine the consideration of the required EMP protection level based on the opinions of the experts. To do this, the Delphi technique is used for this study, and the survey was conducted from 53 experts related to EMP protection standard in the military and civilian sectors. The first questionnaire investigated the appropriate level of EMP protection, and the second questionnaire analyzed the factors considered in establishing EMP protection level. As a result of the factor analysis on the opinions of the experts, it was concluded that the EMP protection requirement level should be determined by variables of METT + TC.

Extraction and Analysis of Construction Phase Risk Factors in High-rise Construction Project (초고층 건설공사 시공단계 리스크 요인 도출 및 분석)

  • Kim, Sooyong;Kim, Sunghyun;Yang, Jinkook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.2
    • /
    • pp.90-98
    • /
    • 2016
  • High-rise buildings construction project have various risk factors. Major risk factors are negative results such as time delay and increase of costs. Therefore, this study was analyzed risk factors in construction stages of high-rise buildings using by PROMETHEE technique. For this, this research were identified risk factors through experts Focus Group Interview(FGI). And, PROMETHEE was used to setup evaluation standard for analysis of high-rise building construction risks. Next, the standard of evaluation index calculation was composed by using the definition level in PDRI. Preference function and evaluation index were identified through questionnaires. Through these processes, this study has calculated the importance of high-rise building construction risks using by PROMETHEE technique. As a result, high degree risk factors were as following. These are 'Operation plan of material lifting', 'Outrigger & Belt Truss Construction', 'Foundation work plan of high-rise building' and 'Considering a Structure concept of high-rise building'.

Analyzing the Market Structure of Asian Construction Contracts : A Perspective on Korean Construction Firms (국내 건설기업의 아시아 계약실적 구조 분석)

  • Lee, Kang-Wook
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.39 no.5
    • /
    • pp.623-630
    • /
    • 2019
  • As the Asian region becomes strategically important in the international construction market, competition among construction firms has been more intense. While existing literature on the Asian construction market have mainly focused on qualitative approaches to market entry strategies and risk assessment, quantitative research to explain the dynamic competitive structure of the market has been rarely conducted. To address this issue, this study analyzes the structure of contract performance in the Asian region based on the data from 3,996 projects awarded to Korean construction firms from 2009 to 2017. In addition, this study applies a mathematical model using both static (market concentration) and dynamic (market mobility and instability) analyses. Consequently, the static analysis indicates that market concentration led by top-four firms tends to be increased, and on the dynamic aspect, the market position of Korean construction firms is recently weakened and fluctuated in most of the Asian regions and the construction sectors. The methodology and result of this paper would be meaningful not only to understand the underlying structure of industry-level performance but also to provide a useful reference for establishing competitive strategies towards the Asian market.

AN APPROACH FOR ESTIMATING TOTAL COST OF OCCUPATIONAL SAFETY FOR BUILDING CONSTRUCTIONS

  • Gurkan Emre Gurcanli;Nesimi Teoman Korkutan;Ugur Mungen
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.168-175
    • /
    • 2011
  • Construction accidents are major problem in Turkish Construction industry and especially fatally rates are very high. Current legislative system on occupational safety in Turkey enforces employers to implement safety measures as well as safety management systems. However level of consciousness in the industry is unsatisfactory and safety are perceived as extra cost and unnecessary expenditure. Moreover, especially in small residential building constructions which have a big share in the industry and unfortunately safety measures to mitigate or abate construction risks do not exist. The study focuses on small residential building construction sites and in the scope of this study, thirty building projects are examined. For each building project, project cost including labour and material costs, service and consultancy costs for mechanical, electrical systems as well as architectural and structural services, costs for supervision and finally general expenditures for construction site facilities were calculated. On the other hand, occupational safety costs for personal protective equipment, collective protective measures, consultancy and training were determined. Work breakdown structures were established and for each work item firstly occupational risks were evaluated and furthermore according to risk scores safety measures to be implemented were defined and related costs were calculated. The study gave results for total safety cost on average, in terms of percentage of total project cost (3.73% of total project cost), safety cost per man-hour (0.40 USD) and safety cost in terms of unit construction area (11.60 USD per square meter). Since safety management is a part of whole project management process, study gives suggestions and techniques to calculate safety costs and implement safety measures as a part of project management service for professionals. Authors believe that suggested approach may easily developed by the usage of more data to establish a model for estimation not only for building construction sites but also for all construction projects.

  • PDF

A Study on Application of Smart Construction Safety Technology into Railway Construction (철도건설공사에 적합한 스마트 건설안전기술 적용방안에 대한 연구)

  • Sungwon Jung;Taekeun Oh
    • The Journal of the Convergence on Culture Technology
    • /
    • v.10 no.1
    • /
    • pp.483-488
    • /
    • 2024
  • Railroad construction requires a lot of budget, manpower, and equipment, and as a result, many accidents occur. Although efforts are being made at the national level to reduce the accidents at railway construction sites, the occupational accident rate is not showing a downward trend. Various efforts are needed to reduce accidents, the application of smart construction safety technology will be effective. However, if smart construction safety technology is introduced indiscriminately without analysis, duplicate investment may occur, which may lead to a waste of budget for railway construction. In this regard, this study analyzes accident cases at railroad construction sites through a survey of stakeholders and proposes smart construction safety technologies to be effective for those accident types.

Study on mechanical behaviors of cable-supported ribbed beam composite slab structure during construction phase

  • Qiao, W.T.;An, Q.;Wang, D.;Zhao, M.S.
    • Steel and Composite Structures
    • /
    • v.21 no.1
    • /
    • pp.177-194
    • /
    • 2016
  • The cable-supported ribbed beam composite slab structure (CBS) is a new type of pre-stressed hybrid structure. The standard construction method of CBS including five steps and two key phases are proposed in this paper. The theoretical analysis and experimental research on a 1:5 scaled model were carried out. First, the tensioning construction method based on deformation control was applied to pre-stress the cables. The research results indicate that the actual tensile force applied to the cable is slightly larger than the theoretical value, and the error is about 6.8%. Subsequently, three support dismantling schemes are discussed. Scheme one indicates that each span of CBS has certain level of mechanical independence such that the construction of a span is not significantly affected by the adjacent spans. It is shown that dismantling from the middle to the ends is an optimal support dismantling method. The experimental research also indicates that by using this method, the CBS behaves identically with the numerical analysis results during the construction and service.

A Study on a Strategic Plan for Knowledge Management in Construction Companies - Measuring Knowledge Management in Construction Firms - (건설기업의 지식경영 추진 전략 방안에 관한 연구 - 지식경영의 수준 측정을 통하여 -)

  • Park Jae-Hyun;Baik Jonh-Keon;Kim Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.252-256
    • /
    • 2002
  • Since early 1990s, construction companies in Korea have tired to adopt knowledge management(KM) which has been emphasized by enterprises in advanced countries and academic researches to sustain competitive advantages. However, concentrations were onto applying KM without measuring current status level of knowledge management in their organizations. Therefore, competitive advantages can hardly meet their prior expectations, still less penetrating into the organizations. As a result, this research presents strategic model measuring organizational status of knowledge management originated by interviews and questionnaires on companies.

  • PDF

Case Study of Construction Management in Damage due to Soil Particle Migration Using Inclinometer Incremental Deflection (경사계를 이용한 토립자 유출 관련 피해 시공 관리 사례 연구)

  • Kim, Sung-Wook;Han, Byung-Won
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2006.03a
    • /
    • pp.268-275
    • /
    • 2006
  • Excavation works of cylindrical shafts and tunnels for the construction of a variety of infrastructures have been frequently going on in the urban areas. When ground excavations of cylindrical shafts and shallow tunnels proceed in the ground condition of high water level and silt particle component, ground water drawdown involving soil particle migration causes loosening of ground around tunnels and shafts, causes settlement and deformation of ground. Damages due to ground sinking and differential settlement can occur in the adjacent ground and structures. The extent and possibility of damage relevant to ground water drawdown and soil particle migration can't be so precisely expected in advance that we will face terrible damages in case of minor carefulness. This paper introduces two examples of construction management where using incremental deformation graph of inclinometer, we noticed the possibility of soil migration due to ground water drawdown in the excavation process of vertical shaft and shallow tunnel, analysed a series of measurement data in coupled connection, properly prepared countermeasures, so came into safe and successful completion of excavation work without terrible damages. The effort of this article aims to improve and develop the technique of design and construction in the coming projects having similar ground condition and supporting method.

  • PDF

A Study on complex waterproofing Method Using Part of Joint Watertightness Improved Sheet (접합부 수밀성 향상 시트를 이용한 복합방수 공법에 관한 연구)

  • Suh Woo-Il;Kim Su-Ryon;Kwak Kyu-Sung;Oh Sang-Keun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • v.y2004m10
    • /
    • pp.1-6
    • /
    • 2004
  • We ensure a flat and regular basic surface by using part of joint waterproofing improved sheet method applying the upper slab of a concrete structure. We solve the problem of getting loose scale the general sheet by waterproofing of the sheet and improving adhesive strength of the basic concrete. Also, waterproofing sheet union to problem of joint have solved using of insertion type method so that, it improved a watertightness. It has improved in resist impact, resist abrasion and it is the effect of shortened construction period and cutting down on construction expenses. Here are the special quality and superiority of this waterproofing research. (1) Level material has the super adhesive strength so that it makes the basic surface without the gab of waterproofing sheet and waterproofing layer with the string adhesive strength. (2) We unite the sheet with the joining part between sheets by waterproofing sheet joint using of method. (3) There is the effect of shortened construction period and cutting down on construction expenses without waterproofing of protection.

  • PDF