• Title/Summary/Keyword: Construction level

Search Result 4,375, Processing Time 0.033 seconds

A Study for the Construction Conformity Assessment System According to the New Paradigm of Construction Management (건설관리 패러다임 전환에 따른 건설공사 품질관리 적합성평가 시스템 구축에 대한 연구)

  • Lee, Kab-Soon;Bae, Young-Ju
    • Journal of the Korea Safety Management & Science
    • /
    • v.19 no.1
    • /
    • pp.39-52
    • /
    • 2017
  • The scope of this study is the construction conformity assessment system according to the new paradigm of construction management To minimize the differences between domestic and international state, construction Conformity Assessment is subdivided into system certification and product certification. For the former, WASCON(Worldwide Assessment System of Construction Quality Maturity Stage) is applied. For the latter, AQUA(Advanced Quality Assessment System) was developed and adopted to model project for demonstration. Both systems are designed to enable quantified rating, integrated into PQCS(Project Quality Certification), which is an advanced project quality certification system. The construction work observing PQCS will gain quality score on its own quality certificate(Quality mark on construction itself or facilities is also available, if needed or preferred by customers). This Quality Rating System will inspire and encourage any related parties. PQCS score would let supplier/constructor recognize how much themselves are operating effectively and efficiently, offering them the opportunity of redeeming their weaknesses.

Performance Analysis Framework for Post-Evaluation of Construction Projects through Benchmarking from Advanced Countries (선진국 사례 벤치마킹을 통한 건설공사 사후평가 성과분석 체계 개발)

  • Lee, Kang-Wook
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.25 no.6_2
    • /
    • pp.1017-1027
    • /
    • 2022
  • Development of social overhead capital (SOC) requires huge national finance, and performance issues such as cost-efficiency, safety, and environment have been constantly raised. However, currently each construction client has limited access to its own projects' performance without analytic methodology for industry-level comparisons and benchmarking for improvement. To overcome this problem, this study proposes a comprehensive performance analysis framework for post-evaluation of large-scale construction projects. To this end, this study performed a case study of advanced countries (the U.S., the U.K. and Japan) and consultation with related experts to develop a tailored performance analysis framework for the Post- Construction Evaluation and Management system in Korea. The developed framework covers three categories (project performance, project efficiency, and ripple effect), nine areas (cost, schedule, change, safety, quality, demand, benefit-cost ratio, civil complaint, and defect), and 31 detailed metrics. Using industry-level project performance database and statistical techniques, the proposed framework can be used not only to diagnose excellent and unsatisfactory performance areas for completed construction projects, but also to provide reference data for future similar projects. This study can contribute to the improvement of clients' performance management practices and effectiveness of construction projects.

A System Dynamics View of Safety Management in Small Construction Companies

  • Guo, Brian H.W.;Yiu, Tak Wing;Gonzalez, Vicente A.
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.92-96
    • /
    • 2015
  • Due to unique characteristics of small construction companies, safety management is comprised of complex problems (e.g., resources constraints, a lack of formalized management structures, low level of management safety commitment etc.). In order to understand causal interdependencies between safety factors at different system levels (regulation, organization, technical and individual), this paper aims to develop a system dynamics (SD) model of safety management in small construction companies. The purpose of the SD model is to better understand why small construction companies have low level of safety performance. A causal loop diagram (CLD) was developed based on literature, with an attempt to map causal relationships between variables. The CLD was then converted into stock and flow diagram for simulation. Various tests were conducted to build confidence in the model's ability to represent the reality. A number of policies were analyzed by changing the value of parameters. The value of a system dynamics approach to safety management in small construction companies is its ability to address joint effects of multiple safety risk factors on safety performance with a systems thinking perspective. By taking into account feedback loops and non-linear relationships, such a system dynamics model provides insights into the complex causes of relatively poor safety performance of small construction companies and improvement strategies.

  • PDF

Job Stress of Mobile Communication Network Construction Workers

  • Lee, Dong-Gu;Yoon, Hoon-Yong
    • Journal of the Ergonomics Society of Korea
    • /
    • v.34 no.6
    • /
    • pp.549-561
    • /
    • 2015
  • Objective: The purpose of this study was to investigate the job stress factors of mobile communication network construction workers using survey based on 'Job stress factors evaluation tool for Koreans' that was developed by KOSHA in 2003. Background: Due to the rapid growth of penetration rate of smartphone, the necessity of LTE service changing from 3G network was brought up. The demand of LTE network construction in a short period of time leads to the aggravation of the job stress of mobile communication network construction workers. Method: Two hundred and fifty workers who were in the mobile communication network industry participated in this study, and among them 206 responses were analyzed for this study due to the unreliability and insincerity of responses. The eight job stress factors which are physical environment, job demand, job autonomy, relation conflict, job instability, organizational system, inadequate compensation, workplace culture were analyzed. Results: The job stress factors of mobile communication network construction workers were compared to those of other industry workers, and other work related characteristics were analyzed. The results showed that the stress level of a physical environment and job requirement were relatively higher than those of manufacturing industry workers, meaning that mobile communication network construction workers have rough working conditions and increased amount of work due to the demand of LTE network construction. The stress level of physical environment for outdoor job workers was relatively higher than that of indoor job workers. With the analytical result for level of job satisfaction, significant difference was observed (p <0.05) with every factor, and the job stress was found the highest with those not satisfied with every factor Conclusion: From the results of this study, the work loss due to the job stress could be prevented, and accurate stress factors could be removed at the workplace. Application: The results of this study may not represent the whole mobile network construction workers, the effort for job stress management is needed to improve the work efficiency and the workers' quality of life.

A Case Study on the Performance Analysis for Applying 6 sigma to a Construction Company (건설업체의 6시그마 적용 성과 분석에 관한 사Bll 연구 -S 건설업체를 중심으로-)

  • Kim Se-Won;Hwang Uk-Sun;Kim Sun-Kuk;Kim Yong-Su
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.4 s.26
    • /
    • pp.133-141
    • /
    • 2005
  • The object of this study is to present performance by applying six sigma quality management to a construction company. The research method involves to investigate and analyze data regarding six sigma projects in S construction company and a questionnaire survey from the personnel of the S construction company. The results of this study are as follows 1) S construction company utilized the six sigma quality management for 258 projects during the years of 2003 and 2004 and this bring the effect of cost reduction for quality. Moreover, before using the six sigma quality management, the average level of sigma in this company was around 2.8, after using this, the level increased to 3.6. Particularly, the construction management part, the level increased from 1.3 to 2.6.2) respondents recognize that quality management costs by applying six sigma is reduced. but there is only a little operational efficiency because it is In the early stage of applying six sigma quality management.

Construction Based Model for Assessing Maturity Level of Enterprises

  • Marzouk, Mohamed;Attia, Tarek;El-Bendary, Nasr Eldin
    • Journal of Construction Engineering and Project Management
    • /
    • v.2 no.1
    • /
    • pp.14-19
    • /
    • 2012
  • Maturity models allow organizations to assess and compare their own practices against best practices or those employed by competitors, with the intention to map out a structured path to improvement. This research explores the aspects of the Maturity Models that are relevant to distinguish them from one to another. The different Project Management maturity models for define maturity differently and measure different things to determine maturity. Because of this, organizations should give careful consideration to select appropriate maturity model. The main reason behind this research lies on the modification to the existing Organizational Project Management Maturity Model (OPM3) by adding four knowledge areas, dedicated to construction industry as best practices. These are Safety, Environment, Financial and Claim Management. This Model contains (Yes/No) questions; all of these questions must be answered before the user reviews the results that describe the overall maturity and areas of strength and weakness of an organization. The research presents the implementation of the proposed Model Construction Enterprises Maturity Model (CEM2). All the components of the developed Model have been implemented in Microsoft Access. CEM2 helps Construction Enterprises to assess their Maturity Level and know Areas of Weaknesses for future improvement. The easy to use Yes/No user interfaces help enterprises' employees to assess the maturity level of their enterprises. The Model maintains users' responses in its database; as such, many employees from different enterprise divisions can be involved during assessment phase in several sessions.

A Survey of the Satisfaction Level of Construction Information System From Users' Viewpoints On Construction Site (현장 사용자 관점에서의 건설 정보시스템 만족도 분석)

  • Yoon, Jeong-Hwan;Yoon, Su-Won;Chin, Sang-Yoon;Kim, Yea-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.4 s.32
    • /
    • pp.126-136
    • /
    • 2006
  • Most of large construction companies have developed construction information systems and their ultimate goals should be improvement of the management efficiency of the construction projects. In order to make them successful, the systems should be designed to meet system users' needs Therefore purpose of this study is to evaluate the current information management systems from the viewpoint of the system users, especially on-site engineers. Questionnaire surveys and interviews have been conducted for the highly ranked 10 construction companies on four major factors including the functions of the systems and satisfaction level of each function, recognition of the use effect, informatization support. From the surveys results, correlation between the functions of the systems and the others has been statistically analyzed.

Estimating Relative Risk Level of Construction Work (건설공사 상대적 위험도 산정)

  • Son, Ki-Sang;Yang, Hak-Soo;Gal, Won-Mo
    • Journal of the Korean Society of Safety
    • /
    • v.21 no.5 s.77
    • /
    • pp.53-59
    • /
    • 2006
  • Standard safety management costs can not be applied to each site with same rate, it is very difficult, because it depends on the experience, work method, work kind, work progress schedule, and hazard level of each construction company. Therefore, this study is to find out hazard level of each work kinds through questionnaire and interview and investigate analyze the status which standard safety management costs have been used. Also, this study is to show reasonable rates of standard safety management costs in construction industry and to set up countermeasures against those problem after reviewing its status in korea with in Japan and Europe. The domestic system of standard safety management costs is not considered in the foreign country, while only related subjective items have been investigated and evaluated for this study. This study is to investigate eleven project kinds of domestic system, first, and to investigate eleven items of apartment bldg, office, civil work such as bridge, tunnel, dam, plant etc, secondly. Additionally, three items of gymnasium, railway, particular steel tower are investigated in this study. Also this study is to investigate and analyze performed costs of presently processing worker finished work so that it shows a new reasonable rate against standard safety management costs in construction industry, in order to make basial data and material to be systemized.

A Study on the Effective Management Methods of Craftsmen through Job Environment and Productivity Analysis of Construction Craft Workers (건설기능인력의 업무환경 및 생산성 분석을 통한 기능인력의 효율적인 관리방안에 관한 연구)

  • Ha, Gee-Joo;Ha, Min-Su;Yi, Dong-Ryul
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.35 no.12
    • /
    • pp.173-180
    • /
    • 2019
  • Construction work is a labor-intensive industry, which is required systematic production activities using materials, manpower, and equipment. Among them, manpower resources play a very important role in achieving efficiently production in the organization. Construction work is highly dependent on construction craft workers, and the level of proficiency can be directly related to the construction productivity and quality. However, a rapidly aging construction craft workers in Korea, is being replaced by a foreign construction craft workers because of advoidance of new laborers in the construction site. In the future, if the continuous development and management of construction manpower is not made properly, it may be lead to adverse effects such as setbacks in production, delayed completion, faulty construction, industrial disasters, and decreased productivity in construction site. In this study, it was proposed four important factors for work capacity management of construction craft workers. These were ensuring of physical strength through the health management of construction craft workers, securing of proficiency through career management, ensuring of productivity through work capacity and establing of informatization through work capacity management. By introducing a systematic system, it is possible to improve construction craft workers' professionalism, enhancing the level of welfare, reflecting the realities of labor costs, increasing the quantitative and qualitative levels of construction craft workers, Futhermore it was demanded the continued interest and policy support for the realization of effective management of construction craft workers.

IDENTIFYING CRITICAL RISKS IN PUBLIC PRIVATE PARTNERSHIP PROJECTS IN SINGAPORE

  • Xianbo Zhao;Bon-Gang Hwang;Mindy Jiang Shu Gay
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.444-450
    • /
    • 2013
  • Public private partnership (PPP) procurement was introduced into Singapore in 2003, and 10 PPP projects was successfully completed and have been in operation. The objective of this study is to identify the critical risk factors and risk allocation preferences for PPP projects in Singapore. To achieve this objective, a comprehensive literature review was carried out and 42 risks were identified and grouped into three meta levels, i.e. macro, meso and micro levels. The questionnaire survey produced 48 completed questionnaires from 48 different contractors. The survey results indicated that 23 risk factors had significantly high criticalities and that four macro-level risks, four meso-level risks and two micro-level risks were among the top 10 risk ranking. "Lack of support from government", "availability of finance" and "construction time delay" were perceived as the top three critical risks. Also, the result implied that micro-level risks had a higher criticality mean score than macro-level and meso-level risks. The findings of this study help both public and private sectors to better understand the risks and their allocation in PPP projects, providing valuable information for organizations that intend to participate in PPP projects in Singapore.

  • PDF