• Title/Summary/Keyword: Construction level

Search Result 4,375, Processing Time 0.033 seconds

A Study on Multimedia Database Transmission Algorithm (멀티미디어 데이터베이스 전송 알고리즘에 관한 연구)

  • 최진탁
    • Journal of the Korea Computer Industry Society
    • /
    • v.3 no.7
    • /
    • pp.921-926
    • /
    • 2002
  • B+-Tree is the most popular indexing method in DBMS to manage large size data in more efficiency. However the existing B+-Tree has shortcomings in there is overhead on DISK/IO when the first time of constructing DB or of making Index, and it lessens the concurrency if there are frequent delete operations so that the index structure also should be changed frequently. To solve these problems almost DBMS is using batch construction method and lazy deletion method. But to apply B+-Tree, which is using batch construction method and lazy deletion method, into DBMS the technique for controlling and recovering concurrency is necessary, but its researching is still unsatisfactory so that there is a problem on applying it into actual systems. On this paper I suggest the technique for controlling and recovering concurrency how to implement the batch construction method and the lazy deletion method in actual DBMS. Through the suggested technique there is no cascade rollback by using Pending list, it enhances the concurrency by enabling insertion and deletion for base table on every reconstruction, and it shortens transaction response time for user by using system queue which makes the batch constructing operation is processed not in user's transaction level but in system transaction level.

  • PDF

The Case Study on Performance Measurement Weighting for Efficient Value Engineering Study of Sewage Treatment Facliity (하수처리시설의 효율적인 VE수행을 위한 다단계성능평가 분석)

  • Kim, Dongjin;Park, Jaeil;Lee, Jaehun;Lee, Minjae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.1
    • /
    • pp.40-47
    • /
    • 2016
  • Recently, the demand of sewage treatment facilities have increased by growing the population growth of city and industrialization. However, most of public sewage treatment facilities lack the preparations of design criteria by increasing sewage water amount in the future. In order to respond to this situation, the government has consistently promoted the sewage treatment construction project. This study conducted a survey targeting residents and sewage treatment facilities, civil engineering a VE project professionals for effectively operating the sewage treatment facilities and improving its value to be built in the future. Based on this survey, this study will introduce the list of performance measurements which can not only save cost but also reflect opinion of users and residents. In addition, using Multi-Level Performance Measurement and AHP analyzed the weights of performance measurement which is more objective than existing things for applying efficient VE process

A Study on the Noise Correction Factor in Apartment Complex (공동주택에서의 소음보정계수에 관한 연구)

  • Lee, Nae Hyun;Sunwoo, Young;Park, Young Min;Park, Sun Hwan;Cho, Il-Hyoung
    • Journal of Environmental Impact Assessment
    • /
    • v.14 no.5
    • /
    • pp.247-254
    • /
    • 2005
  • Road traffic noise has increasing broader effects on urban areas as well as rural areas because of rapidly increasing traffic volume and newly-constructed roads. 10 sites in building development areas were selected and the noise level were measured by the apartment floors and by the various block plans of apartment complex. Analysis result, about correction factor, in the case of right angle arrangement, apply - 2.5dB(A). In the case of apartment house correlation of each floor apply 1st floors 0dB(A), 2st floors 1.2dB(A), 3st floors 2.1dB(A), 4st floors 2.6dB(A), 5st floors 2.7dB(A), 6st floors 2.7dB(A), 7st floors 2.4dB(A), 8st floors 2.0dB(A), 9st floors 1.6dB(A), 10st floors 1.1dB(A), 13st floors 0.2dB(A), 15st floors 0.5dB(A). The level of road traffic noise in the arrangement construction of right angle was about 3.0dB(A) at N-4 point and 2.1dB(A) at N-6 point lower than that of a plan figure, respectively. The results suggested that application of correction coefficient obtained by the apartment floor and by the arrangement construction can be improved in road traffic noise. The results suggested that application of correction coefficient obtained by the apartment floor and by the arrangement construction can be improved in road traffic noise.

Analysis on the Influence of Groundwater Level Changes on Slope Stability using a Seismic Refraction Survey in a Landslide Area (지구물리탐사를 이용한 산사태지역의 지하수위에 따른 안정성 해석)

  • Lee, Kyoung-Mi;Kim, Hyun;Lee, Jae-Hyuk;Seo, Young-Seok;Kim, Ji-Soo
    • The Journal of Engineering Geology
    • /
    • v.17 no.4
    • /
    • pp.545-554
    • /
    • 2007
  • Landslides is mainly induced by a heavy rainfall, earthquake ground motion, and some other factors like soil mechanics, morphological-geological factors etc. Since the starting point of the failure seemed to be originated at a construction site in the study, it is meaningful to find out the relationship between the landslide and the construction. For this study, the slope failure factor was examined carefully to see that the original natural slope had vulnerability and that the complex ground had unstability changed by construction. A field survey was conducted on the original ground surface and filled-up ground. A laboratory test was also conducted to determine the geomechanical properties of soil samples. 2D and 3D limit equilibrium analysis with changing groundwater level were conducted at the failure depth using a seismic refraction survey. The result shows that the factor of safety is similar stability under all condition, but unstable under saturated condition.

Risk Value Calculation Method for Moderate Risk Concentration Type at Qualitative Risk Analysis Phase (정성적 위험분석 단계에서 중간위험 집중형 위험도 산정 방법)

  • Kim, Seon-Gyoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.2
    • /
    • pp.38-45
    • /
    • 2015
  • The risk analysis phase of construction risk management process is subdivided into the qualitative risk analysis that plays a major role, and the quantitative risk analysis acting as a supportive role. The traditional calculation method for quantifying a risk value that has been applied so far is an equation to multiply a probability by an impact simply, but its result shows the low risk value biased distribution. Although another equation that shows the high risk biased distribution as an alternative of traditional method was proposed, both of the low or high risk biased equations do not match with the statistical general knowledge that most natural phenomenons are close to the normal distribution. This study proposes a new risk value calculation method that is concentrated to the moderate risk value. Because the risk value distribution by a new method shows a normal shape similar to natural phenomenon, it helps to choose a middle level not biased to the low or high levels when choosing the level of risk response. Furthermore, it could contribute to improve the flexibility and rationality of risk analysis method by providing additional options for the risk value calculation.

A Study on Actual Condition Analysis of Solar Thermal System Demonstrative Enterprise in the J City (J시 태양열 시범사업의 실태조사.분석에 관한 연구)

  • Yoo, Dong-Chul;Lee, Doo-Ho;Lee, Eung-Jik
    • 한국태양에너지학회:학술대회논문집
    • /
    • 2011.04a
    • /
    • pp.80-85
    • /
    • 2011
  • As the instability of oil prices rose because of the situation in Libya, oil prices worldwide recorded the highest level due to the interference in supply. And so, in the 21st century, increasing efforts are being made to use clean new renewable energy centered on solar energy in accommodation of the cycle of nature instead of being reliant on the oil exporting nations. In order to reduce city energy internationally, the implementation of a low carbon city under the combined cooperation of industrial. construction, new renewable energy and transportation sectors with continuous development centered on low carbon green urban planning is now becoming established as the paradigm of the times. Recently, the government has begun carrying out the One Million Green Home Project, which is a project where the government with the goal of providing one million renewable energy homes by 2020 gives renewable energy subsidization for a partial amount of the standard unit price of installation when solar ray, solar heat, geothermal heat, small wind power or fuel cell energy is used. Thus, through this thesis which studies the state of and surveys the green village at Shingok-ri Songhak-myun Jaecheon-shi, it is the desire that the One Million Green Homes Project will be more efficiently developed and plans for improvement formed so that a high level of satisfaction in the product will be provided.

  • PDF

A Study on the Development of an Operation Risk Analysis Model in BTL Projects (BTL사업 운영리스크 분석 모형 개발에 관한 연구)

  • Lee, Jeong-Sun;Lee, Jeong-Hun;Oh, Se-Wook;Yoo, Hyun-Seok;Kim, Young-Suk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.475-480
    • /
    • 2008
  • In BTL project, the operation cost covering upcoming 20 years is usually alloted more than construction cost although its plan is made in short time. Therefore, it is a key issue to forecast and to analyze operation risks in the process of making contract in order to successfully finish the BTL project and to ensure the profitability of business. However, only a few domestic professional management companies are capable to carry out funding and facility management. To manage the potential risks efficiently in BLT project, it's essential to prioritize the risk factors by means of considering economical risk level, non-economical risk level and occurrence frequency. Thus, this study suggests risk analysis model for improving efficiency of BTL project from operation company's perspective by means of survey. The suggested risk analysis model is expected to establish a risk management strategy which can improve the efficiency of management affairs in BTL project.

  • PDF

PRT Benefit Estimation Study; Focused on Nan-Gok line (PRT시스템 도입시 편익산정 연구; 난곡노선을 중심으로)

  • Lee, Jin-Sun
    • Journal of the Korean Society for Railway
    • /
    • v.14 no.4
    • /
    • pp.370-375
    • /
    • 2011
  • In this paper, as a follow-up PRT studies of "J. Lee & K. Kim[2]", in terms of public transportation systems, economic feasibility of PRT systems was investigated. Based on previous studies, PRT demand was estimated and the required number of PRT vehicles has been calculated and the benefit was estimated. To ensure the economic feasibility, construction cost of a PRT system should be the level of 8 billion won per km, and the annual operating costs of the PRT system construction should be approximately 4.63% level. As a result, how much to reduce PRT construction costs, depending on whether decisions are considered to be economically feasible. Thus, PRT technology development will be conducted by targeting the most lightweight and by minimizing the infrastructure and vehicles of PRT.

A Study of the List for CM Product Measure Check-List through 4 Way View;Focusing on Owner, CMr, Designer, Constructor (4자관점을 통한 CM의 성과측정 체크리스트 항목에 관한 연구)

  • Ahn, Eun-Jin;Kim, Ju-Hyung;Lee, Yoon-Sun;Kim, Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.509-512
    • /
    • 2007
  • In Domestic, the beginning of CM system was at December 1996 by 'Construction Industry fundamental law'. Today the needs of CM is more and more during 10 years. Although the time of CM's induction and high-quality human resources are insufficiency, various studies and developments's level through theoritical base and academic level is good which are compared by developed countries's. But still now the effort of CM product measure part, especially public sector is not enough. Besides, the existing check-list is for project owner so it needs to make up for balanced view as organized 4way-view of owner, CMr, designer, constructor. On this study, produce the list of check-list and then weight of each list by view of owner, CMr, designer, constructor. The completec check-list will be useful for CM product measure objectively .

  • PDF

Computer Simulation for Working Condition of Undergroundwork Using TOP DOWN Technique (TOP DOWN 지하공사의 작업환경체크 컴퓨터시물레이션에 관한 기초적 연구)

  • 고성석;손기상;심경수
    • Journal of the Korean Society of Safety
    • /
    • v.10 no.3
    • /
    • pp.96-105
    • /
    • 1995
  • The better industry develops, the more spaces need but in the limited area. Most building become larger and more complicated if the more spaces need in the constant area. And this leads to do underground work in long period generally six(6) months for 6 basement stories due to the selection of TOP DOWN technique. Working environment in this underground area can be problems and should not be overlooked, because air quality in underground spaces become quickly worse. Recently, department name to control construction safety has been changed to ENVIRONMENT & SAFETY TEAM from SAFETY TEAM. This means that it is very important to control against environmental condition at site so much. Overall construction work as well as underground work should conform to the requirement of working environment, particularly against inhabitants around the construction area. Strut protection, one of earth protection method, in case to 40m long strut may become weaker due to thermal stress or its longitudinally compressive strain and the another one, earth anchor protection may not be applied to the site In case of encroaching on vertical underground borderline because of regulation to prohibit it. It is necessary that TOP DOWN technique should be introduced in order to solve the external and internal problem of the site such as difficulty level of the work, potential danger with excavating depth, and shortening workperiod. It is needed that improving way of working condition should be shown and simplified computer simulation program should be also provided for checking pollution level & ventilation, excluding of lighting problem here. Results measured with conformance to the Regulation for Working Environment Measurement, enforced by Ministry of Labor have been applied to the computer program developed here. Sample air taken at unit workplace which was considered as exposing condition of pollutant at breathing point and within a range of behavior of the workers, Identified exposing group in underground work, using Moded Flow Life Finally, three types of ventilation system, type I with blower & ventilator, type II natural supply with mechanical ventilation system, and type I mechanical ventilation with Drivent Fan Unit System are selected for this study.

  • PDF