Korean Journal of Construction Engineering and Management
/
v.18
no.6
/
pp.109-120
/
2017
Even though domestic construction companies are expanding into overseas construction markets, the profitability of overseas project are decreasing and finally some biggest domestic construction companies recorded heavy deficit one after another in 2013. Contract management, which is very deeply related to profitability, is the most difficult area to domestic construction companies, especially in Middle East and Asia where they have the highest market share and a high level of contract management is required. The purpose of this study is to assess their contract management competences to help them improve contract management skills and strategies. First, we defined the overseas project contract management process and selected competences from the each process stage. Then, we conducted a survey with overseas project experts. For considering their competences from various angles, we divided survey groups into domestic construction groups and other groups (Contract consultancy agencies and Construction research institutes) to understand the internal and external perspective of the domestic construction companies' contract management competences. The results of survey was analyzed by using paired samples t-test, Borich Needs Assessment Model and Independent t-test. We expected that the results of this study could contributes to establish strategies for enhancing the domestic construction companies' contract management competencies.
Jang, Dong Hyeok;Kim, Han Soo;Nguyen, Tan Khoa;Jung, Sung Won
Korean Journal of Construction Engineering and Management
/
v.16
no.1
/
pp.64-73
/
2015
The theft of construction equipments and materials at construction sites is one of the risk factors that may affect to the productivity as well as the progress of the project. However, managers of the construction site have paid little attention to the security measure, therefore the theft loss at construction sites has been occurred repeatedly every year. In this study the situation analysis has been carried out for the present condition of theft loss of construction equipments and materials as well as its prevention measure based on the questionnaire survey targeting field managers, experienced theft loss at the site, as a part of base study to set up a security measure of construction sites. The main content of this study is analyzing characteristics of theft loss and the degree of impact and risk by it at construction sites, then reviewing the direction of the prevention plan establishment for the future through the analysis of the importance and utilization level of prevention measures. The result of this study would give an opportunity to create an awareness against the theft loss at construction sites as well as can be utilized as a basic survey for the systematic development of concerned prevention measures.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2008.11a
/
pp.278-281
/
2008
As all industries field has changed very quickly, the field of construction faces in many changed. It is the representatively change that focus on the growth of quality level than increase of the quantity in construction. Whether the project successes or not is related to the survival of the company and it is necessity that we need performance measurement indicators to complete the project successfully. The domestic construction company considers overbearingly the cost-performance indicator in executing a project so far. It is rare of studies that suggest the methodology of more deeply measurement and analysis about the each project itself. The performance measured methodology based on Lean Construction is linked with the each project performance measurement methodology. This methodology uses three indicators such as the reliability, effectiveness and productivity at the sane their measuring whether each task is completed at the point of work. The measurement on the three performance indicators measure and evaluate whether the task is completed on the focus of construction duration. The research suggest the work plan reliability and weight of the performance measurement methodology based on the Lean Construction and the three considerately in the scope of measurement. If the suggestion is considered fully, we can indicate more objective and accurate construction project performance measurement indicators based on Lena Construction.
Korean Journal of Construction Engineering and Management
/
v.20
no.3
/
pp.3-11
/
2019
The construction of a facility is an act whereby infrastructure such as roads and railways and other facilities such as housing and office spaces are constructed, and due to the characteristics of the relevant industry where such construction is carried out in a custom order method, it requires a long period of time mostly. While the construction is carried out over a long period of time, fluctuations in the price of raw materials required for the construction occur. Therefore, the cost of the construction also fluctuates inevitably. The fluctuation of the construction cost meshes closely with the profit of a constructor and the efficiency of government spending. Therefore, it is necessary to maintain the construction cost at a reasonable level by adjusting the construction cost rationally in order to secure the required construction quality and spend the budget efficiently. The buffer system for solving such problem is the contract amount adjustment system by fluctuations in prices (Escalation/De-Escalation). In this study, the method combining the escalation method based on the item adjustment method was suggested for an efficient contract amount adjustment method. In addition, it is proposed that there be an investigation and codification of matters not applied to government acts and regulations on contracts related to the adjustment of fluctuations in prices legally.
Journal of the Korea Institute of Building Construction
/
v.9
no.5
/
pp.135-144
/
2009
The primary focus of this study has been directed towards assessing the potential impact of construction method improvement on a reduction in project cost. A total of 90 actual application cases were collected from a public organization and private construction firms, and 32 cases were used in analysis by adopting a synthetic approach. The level of cost reduction was measured in terms of material and labor cost by comparing the existing method and the improved method. An analysis of the results indicates that project cost can be reduced by up to 5.26 percent compared to a normal project by adopting a synthetic approach. Additional benefits include the assurance of uniform quality, savings in terms of labor and/or materials, and improved productivity. The potential of the applicability of this approach to other types of buildings and the implications of research findings were discussed in detail.
Lee Woo-Jin;Kim Yea-Sang;Chin Sang-Yoon;Kim Kyung-Rai;Jung Young-Soo
Proceedings of the Korean Institute Of Construction Engineering and Management
/
autumn
/
pp.282-285
/
2003
The construction industry has been behind in informatization compared to other industries such as banking, manufacturing, medical, etc. since it is not conscious of informatization and it also has difficulties in attracting investments and attracting IT experts. Furthermore, there has been lack of survey and research on that specifically what areas and how much degree they are behind in informatization. This paper presents a framework and strategy for assessment of informatization based on end users' viewpoints. The authors has already performed the assessment of informatization of general contractors based on IT experts' viewpoints. However, this paper tries to assess informatizaton of construction based on end users' aspects. The result of this research is expected to provide various aspects such as assessment, identification of needs, and problems regarding information systems. These could be effectively used as a guideline and a direction for information system development.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
autumn
/
pp.242-245
/
2003
Most engineering tasks require collaboration between many users in major hospital Construction Projects that have many risks. Loss of cost and change orders occurred in factors such as information exchange, misunderstandings, advanced Technology in hospital projects. Moreover, changes in context, costs, requirements, deadlines, etc. require negotiation of issues that may modify important project characteristics. Each part of the major hospital construction projects have been rapidly changed technology of equipments. Therefore it is a major challenge to make a high level of communication and to have mutual understanding. The objective of this paper is to reduce risks for the design process and construction process of hospital projects.
The construction industry is a labor-oriented and quality, cost, and schedule performance is effected by technicians. However, the construction industry have faced a labor shortage problem. Therefore, technician graying and no new workers inflow cause labor shortage and decline of worker's skill level. The utilization of foreign technicians instead of domestic technicians has been increased in the construction industry. This paper performed questionnaire survey for 43 managers on 14 project fields to determine the current status and problems of construction technicians and to propose a improvement plan. As a result, most foreign technicians are carpenters and iron workers, but the skill levels are generally lower than domestics. The major problems for foreign technicians are communication and non-skilled. Then, labor productivity and accident rates of foreign technicians are higher than domestics. This paper proposes that skill training programs, language lessons, and multi-cultural programs are effective to improve foreign workers' problems.
Proceedings of the Korea Water Resources Association Conference
/
2008.05a
/
pp.2151-2155
/
2008
In case of constructing final closure in sea having big tide variation, the velocity in gap and the seepage velocity under the revet are faster because of inner and outer water level difference of the revet. Thus, the rubbles for final closure lose and the original ground is scoured by piping. There are several difficulties from the view of construction efficiency and safety. This study finds hydraulic phenomena in final closing construction area, develops a program for final closing simulation, minimizes the error during design and construction, and supports the engineering capacity for efficient and safe construction. The existing design method for final closure only considers the flow in gap, but the developed program considers the seepage in revet and flow in closure gap. This developed program chooses the suitable rock size for final closing design and establishes the proper method for final closing construction.
The various alternatives to reduce the construction period and cost in the wide and long tunnel have been attempted recently. However, the concrete lining forming process after finishing tunnel excavation may delay construction period considering the specific conditions of the wide and long tunnel. The concrete lining is indispensible for the road tunnel. For this reason, the blasting-lining synchronizing study had been carried out to reduce construction period in the Gyea-Ryong Tunnel. Lining models were installed at four different distance conditions the floor of the tunnel. After model installation, hundreds of blasting vibration measurements and concrete material tests were performed to calculate the safe distance between blasting point and concrete lining form. The study also introduces a method which can obtain the better ability of construction by improving working environment with the ventilation and the relocation of tunnel equipments in the working places.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.