• Title/Summary/Keyword: Construction information structure

Search Result 1,013, Processing Time 0.035 seconds

Fundamental Study on Visualization of Bar Placing Records Using Augmented Reality (증강현실을 활용한 배근 이력 가시화 방안에 관한 기초적 연구)

  • Park, U-Yeol
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.11a
    • /
    • pp.126-127
    • /
    • 2018
  • Rebar work is important in terms of cost and process of reinforced concrete construction along with formwork and concrete construction, and the quality of reinforced concrete construction has a great influence on the safety and durability of the structure. Therefore it is important to thoroughly inspect the steel reinforcement after casting the concrete because it is difficult to confirm the actual condition of the reinforcement. The purpose of this study is to develop an augmented reality system to visualize the records of bar placing work, which is increasingly utilized in the construction field. In order to improve maintenance of reinforced concrete, this study suggests a plan to effectively manage the drawing information including the structural drawing, the placing drawing, and the photographed image at the construction and inspection stage, and develop a system that utilizes augmented reality technology that can display the state of the inside of a concrete structure by superimposing it on actual environment.

  • PDF

A Study on the Process of Tower Crane Construction Planning in Steel Structure (철골공사에서의 타워크레인 양중계획 프로세스에 관한 연구)

  • Jung, Deok-Gi;Park, Jung-Lo;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.11a
    • /
    • pp.145-146
    • /
    • 2011
  • Lifting plan in conjunction with the overall construction plan will be established. It is being created by executive director of the Corporation and other such as an experienced site manager. But, written lifting plan based on the limited information and experience is causing some problems such as decreasing productivity, workability loss, delay. The reasons for the problems are lack of prediction of construction execution, inappropriate materials on the past performance, individual experience, limits of knowledge, lack of technical materials, shortage of advisor. Therefore, to solve the problems, we have to overcome the situation in which we depends on lifting planner's experience and intuition, limited information by accumulating objective and reliable materials. Because unorganized lifting plan will lower efficiency of lifting equipment and make reducing construction period difficult. In this study, influence factors on lifting plans will be derived through reviewing literatures and lifting plan cases. Derived influence factors will be classified as components and classes, classified influence factors are assessed suitability. Also, Decision making items are derived from the factors. Finally, tower crane lifting plan process will be suggested from the result.

  • PDF

Development of an Approximate Cost Estimating Framework for River Facility Construction at Planning Stage (하천시설물 공사의 기획단계 개략공사비 산정체계 개발)

  • Shin, Jung Min;Woo, Sungkwon;Lee, Si Wook;Kim, Ok Ki
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.3D
    • /
    • pp.371-381
    • /
    • 2008
  • The systematic methodology for estimating construction cost approximately at planning and pre-design phase of a river facility construction project has not yet been established because of its unique characteristics including its relatively small project size in terms of cost. This research suggests a 4-level cost information structure and identifies critical factors affecting construction cost as a result of thorough analysis of accumulated historical cost data of river facility construction projects. Also, this research presents the framework of the approximate cost estimating methodology for river facility construction project a planning stage.

Suggestion and Verification of Assessment model on Construction-Cost of Steel Bridge in Project Performance Phases

  • Kab-Soo Kyung;Hye-Yeon Park;Sin-Hwa Kang;Eun-Kyoung Jeon
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.606-615
    • /
    • 2009
  • Estimating the reasonable construction-cost according to the construction phase in public construction is an important element for securing and executing a national budget efficiently. As a general rule, the predetermined cost of construction is estimated at the end of the design of the target structure. Therefore, it seems to be a considerably difficult problem to estimate the approximate cost of construction, only with its basic information of the bridge in the design planning phase and the early design stage where we can not have specific detailed-section of the target structure. In this paper, we present the calculation of construction-cost in the planning phase based on the analysis of factors affecting the cost of construction conducted in the previous study. Beside, to estimate the cost of construction in early design phase, we would like to present the calculation of construction-cost in the early design phase by executing the analysis of data collected from 61 steel box bridges. It was found from the result of study that the estimated cost of construction gained by the calculation of construction-cost in this paper reduces the error between the real cost of construction and that by the existing method of using.

  • PDF

Analitic study of the PSC box structure based on BIM (BIM기반의 PSC 박스 구조물의 해석기법)

  • Lee, Heon-Min;Park, Jae-Geun;Jo, Sung-Hoon;Choi, Jung-Ho;Shin, Hyun-Mock
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2009.05a
    • /
    • pp.179-180
    • /
    • 2009
  • Recently Development of construction system that subjective operators share and control information efficiently based on the three-dimensional space and design information throughout life cycle of construction project is progressing dynamically. In this study, therefore, we research about interface method between 3-D modeling data for civil-structure-design, especially psc-box-girder design and analysis program, and analysis method of the psc box structure based on BIM(Building Information Management)

  • PDF

A Study on Optimal Technical Factors of USFSS Based on Integrated Technique of Wireless Communication and Location Awareness (무선통신 및 위치인식 통합기술을 활용한 지하구조물 현장지원시스템 최적 요소기술 연구)

  • Jang, Yong-Gu;Jeong, Jae-Hyung;Lee, Jun-Woo;Kim, Hyun-Soo
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.12 no.4
    • /
    • pp.48-58
    • /
    • 2009
  • In recent years, construction worker safety in construction site is important. Especially, the frequent collapse accidents have happened in tunnels, utility tunnel and underground structure, so that the importance of worker safety is greatly emphasized. It is difficult to communicate with other workers in underground space, using the current cable or wireless communicator. When the accident is occurred, it can't rescue workers. This is the reason that it has a deficiency to find a location of survivor and communicate rescure crew and field workers. In this paper we extract the optimal technical factors of USFSS(Underground Structure Field Support System) based on integrated technique of wireless communication and location awareness. And USFSS developed in this study is suited for bad environment of underground structure construction and able to track 3D position of laborer and communicate mutually.

  • PDF

Interface Design of Virtual Modeling Dataand Nonlinear Analysis Program (Virtual Modeling Data와 비선형 해석 프로그램의 Interface 설계)

  • Park, Jae-Guen;Lee, Heon-Min;Jo, Sung-Hoon;Lee, Kwang-Myong;Shin, Hyun-Mock
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2008.04a
    • /
    • pp.100-103
    • /
    • 2008
  • Recently Development of construction system that subjective operators share and control information efficiently based on the three-dimensional space and design information throughout life cycle of construction project is progressing dynamically. In case of civil structures which are infrastructure, Demand for structure of complex system which has multi-functions such as super and smart bridges and express rails is increasing and system development which computerizes and integrates process of structure design is in need. For that, research about link way between three dimensional modeling data and structure analysis programs should be preceded. In this research, therefore, research about interface design between three dimensional virtual modeling data to automate efficient civil-structure-design and nonlinear finite element analysis program which is made up of reinforced concrete material model that express material's character clearly.

  • PDF

English Predicate Inversion: Towards Data-driven Learning

  • Kim, Jong-Bok;Kim, Jin-Young
    • Journal of English Language & Literature
    • /
    • v.56 no.6
    • /
    • pp.1047-1065
    • /
    • 2010
  • English inversion constructions are not only hard for non-native speakers to learn but also difficult to teach mainly because of their intriguing grammatical and discourse properties. This paper addresses grammatical issues in learning or teaching the so-called 'predicate inversion (PI)' construction (e.g., Equally important in terms of forest depletion is the continuous logging of the forests). In particular, we chart the grammatical (distributional, syntactic, semantic, pragmatic) properties of the PI construction, and argue for adata-driven teaching for English grammar. To depart from the arm-chaired style of grammar teaching (relying on author-made simple sentences), our teaching method introduces a datadriven teaching. With total 25 university students in a grammar-related class, students together have analyzed the British Component of the International Corpus of English (ICE-GB), containing about one million words distributed across a variety of textual categories. We have identified total 290 PI sentences (206 from spoken and 87 from written texts). The preposed syntactic categories of the PI involve five main types: AdvP, PP, VP(ed/ing), NP, AP, and so, all of which function as the complement of the copula. In terms of discourse, we have observed, supporting Birner and Ward's (1998) observation that these preposed phrases represent more familiar information than the postposed subject. The corpus examples gave us the three possible types: The preposed element is discourse-old whereas the postposed one is discourse-new as in Putting wire mesh over a few bricks is a good idea. Both preposed and postposed elements can also be discourse new as in But a fly in the ointment is inflation. These two elements can also be discourse old as in Racing with him on the near-side is Rinus. The dominant occurrence of the PI in the spoken texts also supports the view that the balance (or scene-setting) in information structure is the main trigger for the use of the PI construction. After being exposed to the real data and in-depth syntactic as well as informationstructure analysis of the PI construction, it is proved that the class students have had a farmore clear understanding of the construction in question and have realized that grammar does not mean to live on by itself but tightly interacts with other important grammatical components such as information structure. The study directs us toward both a datadriven and interactive grammar teaching.

Concrete Reinforcement Modeling with IFC for Automated Rebar Fabrication

  • LIU, Yuhan;AFZAL, Muhammad;CHENG, Jack C.P.;GAN, Vincent J.L.
    • International conference on construction engineering and project management
    • /
    • 2020.12a
    • /
    • pp.157-166
    • /
    • 2020
  • Automated rebar fabrication, which requires effective information exchange between model designers and fabricators, has brought the integration and interoperability of data from different sources to the notice of both academics and industry practitioners. Industry Foundation Classes (IFC) was one of the most commonly used data formats to represent the semantic information of prefabricated components in buildings, whereas the data format utilized by rebar fabrication machine is BundesVereinigung der Bausoftware (BVBS), which is a numerical data structure exchanging reinforcement information through ASCII encoded files. Seamless transformation between IFC and BVBS empowers the automated rebar fabrication and improve the construction productivity. In order to improve data interoperability between IFC and BVBS, this study presents an IFC extension based on the attributes required by automated rebar fabrication machines with the help of Information Delivery Manual (IDM) and Model View Definition (MVD). IDM is applied to describe and display the information needed for the design, construction and operation of projects, whereas MVD is a subset of IFC schema used to describe the automated rebar fabrication workflow. Firstly, with a rich pool of vocabularies practitioners, OmniClass is used in information exchange between IFC and BVBS, providing a hierarchy classification structure for reinforcing elements. Then, using International Framework for Dictionaries (IFD), the usage of each attribute is defined in a more consistent manner to assist the data mapping process. Besides, in order to address missing information within automated fabrication process, a schematic data mapping diagram has been made to deliver IFC information from BIM models to BVBS format for better data interoperability among different software agents. A case study based on the data mapping will be presented to demonstrate the proposed IFC extension and how it could assist/facilitate the information management.

  • PDF