• Title/Summary/Keyword: Construction firm

Search Result 249, Processing Time 0.029 seconds

A Study on the Trouble of qualify Control Circle Activity in Construction Field (건설분야 품질관리 분업조 활동의 문제점에 관한 사례연구)

  • 이복영;김세희
    • Journal of the Korean Professional Engineers Association
    • /
    • v.24 no.5
    • /
    • pp.129-137
    • /
    • 1991
  • In case a firm proceeds with TQC the activity of QCC, one of the activities concerned with TQC, is made first of all. There fore, in consideration that TQC could not be successful with the activity of QCC being unsuccessful a firm underlines activating QCC and makes considerable support of the educational discipline. However, as for the data of TQC having been introduced in domestic country no data related to construction industry have been found, all of them being concerned with manufacturing industry and it has happened that some firms of the construction industry make the negative reaction to the activity of QCC. So some of firms including our one have prepared and published their own texts and made them available by utilizing the translated Japanese data which were attained through Japanese construction firms. It is thought that a problem has been caused by the above-stated. While Japanese firms have made R & D of the features concerning to the most basic QCC activity for themselves, Korean ones have just followed and taken advantage of those originated by Japanese without being conscious of the basic idea, and this has caused the consequent failing of QCC activity. In other word, the emphasis of the results only rather than process has brought about the unsuccessful QCC activity.

  • PDF

Curved beam through matrices associated with support conditions

  • Gimena, Faustino N.;Gonzaga, Pedro;Valdenebro, Jose V.;Goni, Mikel;Reyes-Rubiano, Lorena S.
    • Structural Engineering and Mechanics
    • /
    • v.76 no.3
    • /
    • pp.395-412
    • /
    • 2020
  • In this article, the values of internal force and deformation of a curved beam under any action with the firm or elastic supports are determined by using structural matrices. The article presents the general differential formulation of a curved beam in global coordinates, which is solved in an orderly manner using simple integrals, thus obtaining the transfer matrix expression. The matrix expression of rigidity is obtained through reordering operations on the transfer notation. The support conditions, firm or elastic, provide twelve equations. The objective of this article is the construction of the algebraic system of order twenty-four, twelve transfer equations and twelve support equations, which relates the values of internal force and deformation associated with the two ends of the directrix of the curved beam. This final algebraic system, expressed in matrix form, is divided into two subsystems: twelve algebraic equations of internal force and twelve algebraic equations of deformation. The internal force and deformation values for any point in the curved beam directrix are determined from these values in the initial position. The five examples presented show how to apply the matrix procedures developed in this article, whether they are curved beams with the firm or elastic support.

What Factors Do Government Subsidy Programs Care about for Inter-Firm Collaboration? Priortization of Evaluation Criteria of Small Business Collabortation Grant, Korea

  • SHIN, Woo-Jin;KANG, Minsu;YANG, Dongwoo
    • The Korean Journal of Franchise Management
    • /
    • v.13 no.1
    • /
    • pp.1-17
    • /
    • 2022
  • Purpose: In this study we aim to identify factors affecting successful inter-firm collaboration. We tried to find out whether government subsidies to small-business owners should be made to experienced and competent cooperatives or to cooperatives with potential even if inexperienced. Research design, data and methodology: Using analytic hierarchy process (AHP), we examine if evaluation criteria for the Small Business Collaboration Grant (SBCG) reflect the potential of successful collaboration of applicant cooperatives. Results: We found that experts tend to think that applicant cooperatives without any experience as a recipient for the SBSG need to be evaluated by their growth potential and their preparation of the application rather than by their business performance or achievement history. The weight of the evaluation must be different between the growth potential and the achievements already achieved. By means of an expert survey, we confirmed that Rookies should weigh evaluation indicators that can reflect their growth potential, and experienced groups should give weight to evaluation indicators that can reflect their achievements. Conclusions: For SBCG applicants with experiences, experts tend to weigh more on SBCG business performances and feasible sharing systems. The screening procedure for the first applicant cooperatives need to focus more on "partner selection" stage, whereas elements related to "realization" apply to experienced applicant cooperatives.

The Improvement Plan of Organization Management Through the Survey of Actual Condition in Construction Work (건설공사(建設工事) 실무분석(實務分析)을 통한 조직관리(組織管理) 개선방안(改善方案))

  • Choi, Byung-Ju;Cui, Xian;Choi, Suk-Woo;Kim, Ok-Kyue
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.2
    • /
    • pp.121-129
    • /
    • 2008
  • Domestic exoteric construction market by opening of world construction market with recent FTA of rapidly change. On these time, need quality increase of construction to possess government official and international competitiveness of customer satisfaction by offering consumer building of good quality. Therefore, must establish direction to inspects and must advance forward formation government official's present actual conditions for building company's QI. This study is as following if summarize studying result of formation government official to improve quality in construction spot. First, formation's CEO will for QI need side improvement the formation government official enemy by important thing. Second, at checking activity and systematic action that participate of responsible persons cooperation enterprise space-time by complete charge department organization should be achieved. Third, complete charge department for quality control operation large size construction firm substantially formation Organizational well operate, but heavy hydrogen building company was construed by greatly unprepared misgovernment. AHP analysis result complete charge department is serious necessity, and the CEO under direct control organizational structure was construed by thing which can bring excellent effect in operation management side of quality business side and formation. Therefore, heavy hydrogen building company should does to occupy competitive power high position with tissue at active quality complete charge deputy.

A Study on The situation of Disasters and Characters of Technical Construction Firms (전문건설업종별 재해현황 및 특성에 관한 연구)

  • Jung, Sung-Hoon;Lee, Gil-Hwan;An, Kyui-In;Lim, Seong-Il;Kang, Kyung-Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.11 no.4
    • /
    • pp.93-109
    • /
    • 2009
  • The study focuses on analysing situation of disasters and characteristics in construction process which the technical construction firms accomplish. Besides, the study aims at the role and responsibilities of technical construction firms in construction safety. It is found out by a questionnaire and interviews in this study that safety control and management have a key role to prevent accidents in construction projects. Based on the result of the research, it is concluded that institutional improvement and support strategies are suggested and that additional to the support of the government and institutions in charge of the field of construction safety the effort of the first contractor, the second contractor and the laborer it is also important.

Applying Unit Modular In-Fill Construction Method for High-Rise Buildings

  • Moon, Sangdeok;Kim, Junyoung;Lee, Jaesung;Ock, Jongho
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.132-137
    • /
    • 2015
  • A modular construction method includes factory-prefabricated room-sized volumetric units. Although low-rise buildings have been constructed worldwide using this method for more than 30 years, it is a relatively new technology in high-rise construction. There are three basic methods of constructing high-rise buildings using modular construction: the core method, the core-and-podium combination method, and the modular in-fill method. While the first two have been used in the USA and in several European countries, the third method, introduced in 2011 by an international cruise ship development firm, is a rather new approach for which there are few case histories. Therefore, its applicability and construction feasibility should be verified. As a pilot study to test the applicability of the modular in-fill method, a 12-story residential building was built in Korea. This paper describes a case study of the pilot project. The advantages and disadvantages of the method and its applicability in terms of cost effectiveness and construction schedule management were evaluated.

  • PDF

A study on the hindrance factors for improving efficiency of the working design (실시설계단계 효율성 향상을 위한 저해요소 분석 - 'ㅇㅇ동 문화 및 집회시설' 사례를 중심으로 -)

  • Kim, Sung-Sik;Park, Jung-Lo;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.11a
    • /
    • pp.129-130
    • /
    • 2011
  • 2009 Presidential Council on National Competitiveness to plan trying to the advancement in the construction industry 'design and engineering of the global competitiveness' in the content of weak points of the design and engineering capabilities to secure the overall problem. In domestic technological of design and engineering behind the other building construction sector about 70%. Especially hindrance factor was founded between design ordering organization, design firm and subcontractor in working design stage. In this paper carried out to hindrance factor that decrease the efficiency in working design stage for a strategy to improve the utilization of basic data.

  • PDF

A Study on the Application Plan of the Optimized Risk Assessment Model in Construction Field (최적 위험도 평가 모델의 건설업 분야 적용 방안에 관한 연구)

  • cho, Jae-hwan
    • Journal of the Korea Safety Management & Science
    • /
    • v.19 no.4
    • /
    • pp.53-62
    • /
    • 2017
  • It has come to attention that a risk-assessing organization, that will benchmark a company's safety department, is imperative, following an increase in large-scale SOC-business project, construction of higher-raised buildings, development of underground space; all that have increase accident rates. Having faced problems that arise in firms that demand diversity, complexity and instantaneity, the purpose of the thesis is to arrive at efficient and practical problem-solving means. In order to solve the problems that would surface theoretically during an actual risk assessment, the state of the operation systems of the top five national construction firms having a hazard rate of 0.25 times less than the average rate have been analyzed, while a hierarchal recognition research of the employees who not only function at the operating level but are the practice subjects of a firm, has also been conducted, bringing the main text.

INTEGRATED PERFORMANCE MANAGEMENT FOR WHOLE PHASES OF URBAN RENEWAL MEGAPROJECTS

  • Heedae Park;Kang-Wook Lee;Seung Heon Han
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1463-1467
    • /
    • 2009
  • Construction projects are vulnerable to diverse internal and external factors, requiring systematic and consistent performance management along the entire life cycle of a project. In particular, urban renewal projects have a range of performance measures, including policy reconciliation and permits, project development, project financing, design, construction, and occupancy and maintenance. This requires a program-level megaproject approach, which integrates each stage of a project as well as variety of stakeholders' interests in pursuing a project from different perspectives. However, previous research on performance management has focused especially on the limited scopes of factors, including cost, quality, and schedule at the project level or on financial factors at the firm level. Given the lack of current approaches, this study suggests an integrated and systematic performance management scheme to control urban renewal megaprojects at the broadened perspectives of the program level. To this end, this study adopts the balanced scorecard approach and elicits key performance indices associated with various project configurations. Finally, an algorithm is presented for quantitatively assessing the level of performances along whole life cycle of urban renewal megaprojects.

  • PDF

A Correlation Analysis between the Change of Managerial Environment and the Business Performance of Domestic Construction Firms (국내 건설환경 변화와 기업경영성과의 상관관계 분석)

  • Lee, Dong-Hoon;Kim, Sun-Kuk;Shin, Dong-Hwa
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.1
    • /
    • pp.111-121
    • /
    • 2009
  • Because of its unique characteristics, the construction industry tends to be affected by economic environment more than any other industries. The domestic construction industry was forced to change its management pattern and system when it went through the foreign currency crisis, and since then, the construction industry has been growing in terms of quality over last 10 years, breaking from the quantitative performance-oriented growth in the past. The study was intended to integrate the financial data of the companies during the period before and after the foreign currency crisis so as to analyze the effect of environmental changes on management performance of the companies. It was aimed at evaluating the changes to the stability, profitability and the growth potential, and collecting the data on variation of the market scale, price of resources such as material and labor and the financial environment, thereby analyzing the correlation with the management performance. The study, to deal with the difficulties which are anticipated, like the foreign currency crisis experienced in the past, was also intended to identify the correlation between the economic conditions and the performance of the construction companies, using the experimental data in the past.