• Title/Summary/Keyword: Construction field management

Search Result 1,286, Processing Time 0.034 seconds

An Empirical Study on Top Management's Leadership in Construction Quality Management Activities and Construction Quality Management Performance (최고경영자의 리더십이 건설품질경영활동과 건설품질경영성과에 관한 실증연구)

  • Cho, Jin-Ho
    • Journal of Korean Society for Quality Management
    • /
    • v.45 no.3
    • /
    • pp.403-426
    • /
    • 2017
  • Purpose:?The purpose of this study is to analyze the causal relationship between top management 's leadership and construction quality management activities that affect construction management performance based on construction quality management. Methods:?As its method, the causal relationship between the leadership of top management and the key management factors of construction quality management activities affecting management performance is analyzed by using the structural equation model. The construction companies used in the analysis sample conducted surveys on companies that are conducting ISO, KOSHA, OHSAS, DQC, and so on. Results:?It was revealed that top management's leadership has a great influence on management performance and all management factors of construction quality management activities. However, safety management does not affect the management performance of construction quality management activities. And top management's leadership on management performance are explained by the mediating effect of cost, time, quality and communication among management factors of construction quality management activities. Conclusion:?In the previous study, the quality management activities and the ISO - based integrated total quality management system (TQM) applied in the manufacturing or service industries were presented as empirical results. However, this study presents the results of different studies by presenting empirical study results by selecting time, cost, quality, safety and communication as key management factors of quality management activities of construction companies through reviewing and analyzing previous studies in construction field.

A Study on Science and Technology Policy Analysis in the field of Construction and Transportation R&D in Korea

  • Lee, Jongwon
    • International conference on construction engineering and project management
    • /
    • 2017.10a
    • /
    • pp.332-336
    • /
    • 2017
  • The field of construction and transportation R&D has been increased and improved wih the integration into the ICT. With the rapid trend changes like the Fourth Industrial Revolution, new direction and solution of R&D policy is being explored to prepare for the convergence era with other diverse research areas. In order to present new direction, it is necessary to analyze the external environment influencing construction and transportation field. In this regard, this study analyzes the science and technology policy plan and goal in Korea. In conclusion, through the policy analysis, this study suggests new direction of construction and transportation R&D in Korea.

  • PDF

Development of Multimedia Education-Network Construction Solution Based on Intranet (인트라넷을 활용한 멀티미디어 학내망 구축 솔류션의 개발)

  • 고일석
    • Journal of the Korea Society for Simulation
    • /
    • v.9 no.4
    • /
    • pp.59-66
    • /
    • 2000
  • Computer has been many effect in diverse field of mankind and it brings development of educational field like CAI. Also development of internet and If bring rapid growth of cyber school and it is required multimedia environment and efficient cyber school construction package for efficient management. In this paper we develop multimedia education-network construction package for cyber school using intranet. It will reduce the cost of management and construction for small and medium size cyber school, and it will raise efficiency of cyber school.

  • PDF

A Field Study on the Preference in the Construction Management - Focused after construction Stage - (현장관리 업무체계의 실태조사 연구 - 준공 후 업무를 중심으로 -)

  • Lee, Doo-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2003.11a
    • /
    • pp.85-89
    • /
    • 2003
  • With the social demands for tall building, the level of techniques for construction become high and there are various building materials. Also, the construction system become very complicated with the increase of worker. In spite of above facts, the method of construction management depends on the experimental capacity of a construction manager, and there are many unreasonable elements. These elements prevent well-going in construction process. To solve this problem, it is necessary to make a new system of construction management which is adequate for the condition of company and the contents of construction. In this study, the characteristic of production system and the present condition of construction management were investigated with the help of survey. Thus, the new method of construction management which can clear the previous problems was proposed.

  • PDF

A Field Study on the Preference in the Construction Management - Focused after construction Stage - (현장관리 업무체계의 실태조사 연구 - 준공 후 업무를 중심으로 -)

  • 이두진
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2003.05a
    • /
    • pp.85-89
    • /
    • 2003
  • With the social demands for tall building, the level of techniques for construction become high and there are various building materials. Also, the construction system become very complicated with the increase of worker. In spite of above facts, the method of construction management depends on the experimental capacity of a construction manager, and there are many unreasonable elements. These elements prevent well-going in construction process. To solve this problem, it is necessary to make a new system of construction management which is adequate for the condition of company and the contents of construction. In this study, the characteristic of production system and the present condition of construction management were investigated with the help of survey. Thus, the new method of construction management which can clear the previous problems was proposed.

  • PDF

Application of Geomagnetic Field-Based Indoor Positioning Technology in the Formwork Stage (거푸집공사 단계에서의 지구자기장 기반 작업자 실내측위기술 적용 방법)

  • Kim, Hyungjun;Lee, Changwoo;Kim, Hyeonmin;Ahn, Heejae;Lee, Changsu;Cho, Hunhee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.213-214
    • /
    • 2023
  • Positioning information of workers is important for safety management at construction sites. Among the various indoor positioning technologies, geomagnetic fields-based technology is more economical and has less error than other technologies. However, there is a problem that the installation and dismantling of materials such as formwork at construction sites can cause degradation in positioning performance. Therefore, in this study, the distortion of the geomagnetic field near euro-form was quantitatively measured and the application method of geomagnetic field-based indoor positioning technology on formwork stage was presented. The results showed that the distortion occurred within 10cm of the wall and column form, but positioning accuracy could be affected up to 60cm from the form due to the characteristic of geomagnetic field-collecting technology. Therefore, applying this technology to the formwork stage requires complementary measures, such as using other positioning techniques up to 60 cm near the formwork, or excluding distorted area when positioning. It is expected that this study can contribute to the efficient safety management of workers by suggesting ways to prevent an increase in positioning error when applying geomagnetic field sequence-based indoor positioning technology during the formwork stage.

  • PDF

Establishment of New Business Field in construction Management Business (건설관리사업(Construction Management)의 새로운 업역 구축에 관한 연구)

  • Jin, Hyun-Soo;Lee, Byeong-Hun;Kim, Kyung-Hoon;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.139-142
    • /
    • 2010
  • Owing to the deregulation, low interest, sufficient liquidity and etc., the real estate market has been recovered in some areas and some investment products to the degree being concerned about the overheating. In order that the construction and real estate industries, which play the considerable role in our economy, may be soundly grown toward contribution of the stable growth of our economy, it is being requested to acquire the transparency, predictability and trade stability of the international level conforming to the deregulation during the sale in lots of the building. For this reason, keeping pace with the trend of the construction industry and the current of the society, which are more and more large-scaled and globalized, it will be necessary to solve the social matters and to construct the more efficient and continuous construction management by widening and activating the field of CM through scheme of more specialized, sustainable and general CM method and establishment of new business bounded system in the construction management.

  • PDF

THE RESEARCH OF CONSTRUCTION PROJECT MATERIALS REQUIREMENT SYSTEM

  • Pan Nai-Hsin
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.764-767
    • /
    • 2005
  • In the construction industry, materials management is one of the most important components in construction engineering life cycle. Materials management optimization is one of the research subjects in the field of construction management. In the materials management system of a construction project, the suitability of selecting procurement planning strategy will influence the result of project completion. This study conducts literature review at first and also refers the related issue in other industry's application. Associated with the characteristics of construction project in civil engineering and the concept of object oriented design applied in the materials management, this research is aimed to establish a construction materials requirement preliminary system.

  • PDF

Rebar Fabrication Process in Both Field Processing and Factory Processing for Adopting Lean Construction

  • Yun, Seok-Heon;Kim, Sang-Chul
    • Architectural research
    • /
    • v.15 no.3
    • /
    • pp.167-174
    • /
    • 2013
  • Due to increasing competition of construction companies, it is required to optimize the management of construction projects and "lean" concepts are rapidly spreaded in construction industry. Steel work accounts for a large proportion in construction work, and a variety of attempts to efficiently perform steel work has currently made. And since rebar (Engineer-to-Order) can be engineered through design once order is placed, it gives the great impact on construction, thus, entire management is required. The purpose of this study is to present the method to increase the efficiency of field processing method of steel work in terms of lean construction. Once we examine process of steel work and identify the flow, we would like to analyze which processes should be improved through value analysis approach and present the improvement plans. Also, this study examines cases of field processing and factory processing, and it identifies the waste factors in the procurement process. Finally, this study would like to present the result of analysis from the perspectives of value. The rebar delivery process is divided into several steps and the duration of every step is surveyed. Using duration data, VAT (Value added time) can be calculated for analyzing the efficiency of the process.

A Comparative Analysis of Status on the Selection and Evaluation of Field Manager in Apartment and Office Building Project (공동주택과 오피스 건설현장의 조직원선정 및 평가실태 비교분석)

  • Lee Jung-Yong;Kim Byeong-Lae;Son Chang-Baek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.290-293
    • /
    • 2003
  • The field organization management in construction industry is very important factor improvement and cost reduction. But, until now, evaluation methods on the existing field organization did not make ready and endeavor of organization betterment was insufficient in construction industry. The purpose of this study to provide basic data for reasonable selection and evaluation of the field manager through analyzing operation status of the existing field organization in apartment and office building project by interview and questionnaire on the 22 construction companies. This study presented optimal proposal on the selection and evalution of field manager for productivity improvement and cost reduction by means of efficient construction progress in apartment and dffice building project.

  • PDF