• Title/Summary/Keyword: Construction facility

Search Result 1,626, Processing Time 0.034 seconds

Application on the New Technology of Construction Structures Disaster Protection Management based on Spatial Information

  • Yeon, Sangho
    • International Journal of Internet, Broadcasting and Communication
    • /
    • v.10 no.3
    • /
    • pp.136-145
    • /
    • 2018
  • The disaster monitoring technique by combination of the measurement method and the fine precision of the sensor collecting the satellite-based information that can determine the displacement space is available in a variety of diagnostic information and the GIS/GNSS by first sensor it is being requested from them. Be large and that the facility is operated nationally distributed torsional displacement of the terrain and facilities caused by such natural disasters progress of various environmental factors and the surroundings. To diagnose this spatial information, which contains the various sensors and instruments tracks the precise fine displacement of the main construction structures and the first reference in the Geospatial or more three-dimensional detailed available map and location information using the installed or the like bridges and tunnels produced to a USN/IoT change at any time, by combining the various positioning analysis of mm-class for the facility main area observed is required to constantly in the real time information of the USN/IoT environment sensor, and to utilize this as a precise fine positioning information by UAV/Drone to the precise fine displacement of the semi-permanent infrastructures. It managed to be efficient management by use of new technologies, analyzing the results presented to a method capable of real-time monitoring for a large structure or facility to construction disaster prevention.

A Study on Demand Function of Customized Cloud BIM Service - Focused on Medical Facility Design - (맞춤형 클라우드 BIM 서비스 요구기능 도출에 관한 연구 - 의료시설 설계를 중심으로 -)

  • Jung, Sung-Ho;Lee, Byung-Soo;Choi, Yoon-Ki
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.35 no.7
    • /
    • pp.53-61
    • /
    • 2019
  • Cloud BIM, which incorporates cloud computing technology and BIM technology, is increasingly used in construction. In particular, the recent trend of cloud services in IT field is to provide customized cloud services according to the characteristics of users. These changes are also linked to the cloud BIM, which is emerging in the construction industry. However, cloud BIM researches and commercial technologies that are currently underway do not reflect these trends, and they provide services through generalized management functions in construction projects. In order to solve these problems, a new type of customized cloud BIM service is needed that can provide cloud services by reflecting the characteristics of the project, customization based on the user's work, and providing the knowledge service. Therefore, this study aims to derive the system requirement function that should be preceded for implementing the customized cloud BIM service, and the target project is selected as the medical facility.

Analyzing the Features of Functional Spaces on Military Administrative Facilities using Analytical Hierarchy Process (AHP를 이용한 군 행정시설 기능공간 특성분석)

  • Park, Ho-Sung;Lee, Hyun-Soo;Park, Moonseo;Ji, Sae-Hyun
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.35 no.1
    • /
    • pp.37-46
    • /
    • 2019
  • In order to present the enhancement direction for the military administrative facilities, that can satisfy the user demands and achieve cost-effectiveness the goal of public projects, this research analyzes the features of functional spaces using Analytical Hierarchy Process(AHP). Basically, the scope is selected to four facilities commander office, private office, public office, and meeting room, because they have an effect on military administrative facilities. Since the space is established by a combination of their own functions, this research begins with an analysis of functional spaces of military administrative facilities, which is verified through literature review and interview with expert. Thereafter, an AHP survey is conducted to military personnel to analyze the priority of functional spaces and to re-classify the functional spaces of each Military administrative facilities. Resultingly, the difference of functional spaces preference according to ranks and facility type are identified. Even though the same military facilities, it means that user satisfaction is different. Therefore, user satisfaction should be considered for each facility at the construction plan. It can minimize overlapped and unused spaces, which can help ensure cost-effectiveness. Consequently, this research suggested the methodology and the process that can take user satisfaction and can support the enhancement of military facilities standards.

Establishment of WBS·CBS-based Construction Information Classification System for Efficient Construction Cost Analysis and Prediction of High-tech Facilities (하이테크 공장의 효율적 건설 사업비 분석 및 예측을 위한 WBS·CBS 기반 건설정보 분류체계 구축)

  • Choi, Seong Hoon;Kim, Jinchul;Kwon, Soonwook
    • The Journal of the Korea Contents Association
    • /
    • v.21 no.8
    • /
    • pp.356-366
    • /
    • 2021
  • The high-tech industry, a leader in the national economy, has a larger investment cost compared to general buildings, a shorter construction period, and requires continuous investment. Therefore, accurate construction cost prediction and quick decision-making are important factors for efficient cost and process management. Overseas, the construction information classification system has been standardized since 1980 and has been continuously developed, improving construction productivity by systematically collecting and utilizing project life cycle information. At domestic construction sites, attempts have been made to standardize the classification system of construction information, but it is difficult to achieve continuous standardization and systematization due to the absence of a standardization body and differences in cost and process management methods for each construction company. Particular, in the case of the high-tech industry, the standardization and systematization level of the construction information classification system for high-tech facility construction is very low due to problems such as large scale, numerous types of work, complex construction and security. Therefore, the purpose of this study is to construct a construction information classification system suitable for high-tech facility construction through collection, classification, and analysis of related project data constructed in Korea. Based on the WBS (Work Breakdown Structure) and CBS (Cost Breakdown Structure) classified and analyzed through this study, a code system through hierarchical classification was proposed, and the cost model of buildings by linking WBS and CBS was three-dimensionalized and the utilized method was presented. Through this, an information classification system based on inter-relationships can be developed beyond the one-way tree structure, which is a general construction information classification system, and effects such as shortening of construction period and cost reduction will be maximized.

Electric Field Strength and Shielding Effectiveness Comparison According to the Size of Shielding Facility (방호 시설 크기에 따른 전계강도 및 차폐 효과 비교)

  • Kang, Ho-Jae;Huh, Chang-Su;Bang, Jeong-Ju;Choi, Jin-Su;Park, Woo-Chul
    • Journal of the Korean Institute of Electrical and Electronic Material Engineers
    • /
    • v.27 no.4
    • /
    • pp.221-225
    • /
    • 2014
  • In modern times, threat of high power electromagnetic wave is increasing. When the electrical grid and communication network are attacked by these high power electromagnetic wave, the whole infrastructure is paralyzed. To protect the infrastructure from these high power electromagnetic wave threat, the shielding facility that can block high power electromagnetic wave is constructed. Also shielding effectiveness evaluation about the constructed facility is important. But, because of space efficiency and saving of construction cost to construct the actual shielding facility, the shielding room wall is generally adjacent to exterior concrete structures. As space between shielding facility wall and concrete structures is very small, arranging the transmitting antenna exterior shielding facility is realistically difficult. Therefore, in this research, The shielding effectiveness measurement plan in the state of exterior narrow space of HEMP shielding facility is presented. And to apply this plan, The influence of shielding effectiveness according to the size of the shielding facility is analyzed.

Indicator of Facility Performance Evaluation (FPE) for Educational Facilities of BTL Projects

  • Lee, Kwan-Jong;Lee, Chun-Kyong;Park, Tae-Keun
    • Architectural research
    • /
    • v.14 no.1
    • /
    • pp.35-44
    • /
    • 2012
  • Build-Transfer-Lease (BTL) was introduced to the domestic construction market in 2005. Now, seven years later, the BTL model is most active for educational facilities. In 2011, 93 educational facility projects entered the maintenance stage. Considering the characteristics of today's BTL projects for educational facilities, the main issues are the initial performance and maintenance of educational facilities and the service-providing status for the 20-year operational management period, in relation to providing safety and convenience to students, the facility users. Seeking a solution, local education offices and departments in charge of BTL under the Ministry of Education, Science, and Technology have been exploring various methods of evaluating operational maintenance performance from various perspectives. For educational facility BTL projects, however, the appropriateness of initial operation performance evaluation, rather than considering the 20-year operational management period, is controversial in regards to sustainability. On this account, performance evaluation items in four areas-operational maintenance evaluation, facility performance status evaluation, maintenance subject evaluation, and sustainable change response evaluation-should be extracted. An indicator of facility performance evaluation is presented in this study through an AHP survey targeting experts, as part of establishing an operation performance evaluation system for educational facility BTL projects.

A Study on the Complex type & Space Character of Japanese Community Mixed-support Facility (일본 공동체복합지원시설의 복합화 유형과 공간에 관한 연구)

  • Kim, Su-Mi;Kim, Moon-Duck;Seo, Su-Mi
    • Journal of the Korean housing association
    • /
    • v.20 no.2
    • /
    • pp.11-18
    • /
    • 2009
  • After 2004, as the community mixed-support facility in Japan was admitted as a private business of public facilities based on the Special Law for Urban Regeneration, the community mixed-support facilities in Japan are developed into various types with the view of the urban regeneration and urban renewal, more different point of view, and a tendency of establishment of the community facility has been considerably changed for the past twenty years. The reasons of the change are the social demand for the reformation of facility and the modification of subsidy constitution according to the establishment of equal facility. Some examples of that are the construction of lifelong education community and the change into a equivalent society between male and female and the adjusting to the aging and the welfare society and the social situation of more consumption recently, and in order to emerge from former building system, new facilities related to the contents are being expanded. The complex of the community mixed-support facility has an advantage in that it supplies the services for the complex of the community mixed-support facility, constitutes the communal character and the sense of solidarity among residents and can lead the development of region through the exchange of regional information. Through the Japanese community mixed-support facility which has many cases of it, this study would recognize the suggestion, the feature of it and examine the complex types.

A Study on Estimation Model of Construction Duration for Public Construction (공공건설공사 공사기간 산정모델에 관한 연구)

  • Kim, Byeong-Soo;Chun, Jin-Ku
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.6 s.28
    • /
    • pp.142-151
    • /
    • 2005
  • On public constructions, that the first planed projects delay than the scheduled completion day occurrence frequently because gap between the scheduled construction durations and the actual construction durations. These facts connect with not only problems of the construction during as the construction delay but also brought about the distribution costs increase as the failure of facility use plan and the people discomfort weight, failure of the production and the supply using facility then tremendous loss of each part etc. For reduce these loss, it must improve accuracy of the scheduled construction duration estimating when it order. This study try contribute to a successful manage of public project and reduce the construction duration extension frequent of the construction during, and then ensure the suitable construction duration by present the estimation model of the scheduled construction duration that include the construction duration correct element using as an index on the scheduled construction duration estimation.

The politic suggestion and the design of integrate-construction model for installation of the residential IT facility. (구내 정보통신설비를 위한 정책제안과 통합구축모델 설계)

  • Kang, Young-Chang;Lim, Sang-Chul;Kim, Sun-Hyung
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.13 no.5
    • /
    • pp.845-853
    • /
    • 2009
  • This study recognize the problems about the High-speed IT building certification system and the technical standards of telecommunication facility, broadcasting public receiving facility including Home-network facility which are installed at apartments for the successful building of the Ubiquitous city that the government is driving and suggested a sweeping change of the housing law interrelated for making up a housing efficiency grade-display system and systematizing the maintenance by solutions. Also, presented the integrate-construction model designs separately of the residential IT line about the buildings applied to technical standards, the building acquired second grade below of High-speed IT building and the building when the above solutions get to he systematized.

Development of Common Data Standard for Airports Facilities based on Building Information Modeling (BIM) (공항시설물에 대한 BIM 기반의 공통 데이터 표준 구축 방안)

  • Jung, Euisoo;Kim, Kee-Woong;Choi, Youn-Chul
    • Journal of the Korean Society for Aviation and Aeronautics
    • /
    • v.29 no.3
    • /
    • pp.100-110
    • /
    • 2021
  • Building Information Modeling(BIM) technology continues to develop and is now being applied to infrastructure facilities. As smart technology based on BIM is applied to the construction industry, the construction of the same data in a common environment is considered to be a very important step in various applications. This study was conducted on methods to establish an open BIM-based airport facility information common data environment. Therefore, this study develops the element technology to establish a common data environment for the integrated management of airport facility information, and aims to standardize data in the common data environment among various technologies and applications. In order to achieve the aim, in this study, the required technologies were derived by examining the common data environment and examining the civil engineering facility field and the case of integrated airport facility management. Through this, standards and development for information standard framework, information requirement level, BIM guidebook, and BIM library were developed in connection with national and higher standards. Through these standards, it is expected that the integrated management of various airport facilities will be efficiently carried out through a standard data platform in the future.