Korean Journal of Construction Engineering and Management
/
v.17
no.2
/
pp.127-134
/
2016
Design modification is one of the elements that must be controlled in the process of any construction project. Especially a military facility project comes with more obstacles than private work due to the unique characteristics and closeness of the military. As there are both the project manager and the user within the ordering body, it is likely to have difficulties unless communication is conducted smoothly. The reason is that such issues regarding communication lead to design modification and it will result in the user's dissatisfaction. Thus this study aimed to identify the elements that generally cause design modification by analyzing characteristics of military projects from the status of current project contracts, analyzing past elements that lead to design modification and comprehensively researching responds from the survey on operators of facility projects. It is expected that loss from design modification of military facility projects is reduced by proposing feasible and practical improvements.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2008.11a
/
pp.291-296
/
2008
For the past two decades, 3D/4D CAD research has heel mainly focused on the design and construction phase of a facility life-cycle. However, there has been a general notion that the strength of 3D/4D CAD lends itself to other phases such as planning, operation and maintenance. In this research, a 3D/4D CAD model was generated in a commercial software platform. Then, the traditional 1:fe cycle facility management procedures are reviewed to, see any possible improvement opportunity with the 3D/4D CAD model as an example. A focus group interview, in conjuction with an extensive literature review, produced the list of area where 3D/4D CAD model could significantly benefit the traditional life cycle facility practices. Finally, a questionnaire-based survey was conducted with 155 respondents to statistically verify the feasibility of 3D/4D CAD for life cycle facility management.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.22
no.12
/
pp.150-156
/
2008
Recently life and properties damage at Japan and China by generating earthquake. For establishing measure for earthquake in domestic, earthquake disaster measure law was enacted on March, 2008 from a natural disaster of earthquake and present the detail part and enforce the measures. This paper analyzes domestic site and problems of electrical facility earthquake measures at transformer vault which the power supply the emergence situation at generating earthquake. Also we present the domestic seismic design and construction direction from research and analysis related law and regulation for the seismic design and construction in domestic and foreign for electrical facility. Afterward we will need to study reliability inspection for electrical facility seismic design method and construction at buildings transformer vault.
Journal of the Computational Structural Engineering Institute of Korea
/
v.36
no.3
/
pp.147-154
/
2023
In the case of river facilities, the management of this information differs depending on national and regional rivers, therefore, there is no integrated management in place. There is concern about the loss of facility information owing to the insufficient accumulation of information during their design and construction stages. Additionally, as a result, the utilization level of facility information during the maintenance and operation stages is insufficient. To ensure effective maintenance and operation of river facilities, it is necessary to secure data consistency and increase efficiency by organizing facility information according to a standardized classification system. This study proposes a strategy for implementing the BIM standard classification system in the river sector, considering facility characteristics. The goal is to introduce a BIM information model for 3D-based river facilities, and enable efficient maintenance and operation conversion.
Kim, Yong-Hee;Lee, Young-Ho;Song, Jae-Jun;Lee, Sang-Yoon
Journal of the Korea Academia-Industrial cooperation Society
/
v.15
no.1
/
pp.515-524
/
2014
In this paper, The investment prioritization model was investigated for keeping the service level of mooring facilities more than the target level of management with a limited budget in the right time. Network level prioritization criteria of the national scale was developed to take into criteria index and quantitative evaluation, management authority's opinion. Delphi method was conducted maintenance exports of mooring facilities over twice for verifying the validity and adequacy. In order to improve the objectivity of criteria, the criteria for evaluating the utilization of port facilities is presented form yearly facility traffic/facility's length, the result of the analysis of facility traffic data. The investment prioritization criteria of mooring facilities is expected to be utilized for more efficient and national budget distribution applied to the maintenance budget plan of nationwide.
The purpose of this study was to investigate and analyze the function and scale on aspect of construction planning with examples of exhibition and convention facilities constructed recently in domestic and foreign area. Also, it was to provide the result for basic data for construction planning and architecture of similar facilities constructed later. The study methodles, but they had characteristics to use the space with compound purpose for exhibition, conference, etc through installing multi-purpose hall. Finally, for effective construction planning of exhibition and convention facilities, it was required to decrease the ratio of common area gradually and derive rationalization of whole space composition by deriving complexity of function rather than planning of single purpose of each facility for exhibition and conference function. was to analyze the characteristics of construction planning for composition and scale of exhibition, conference, public use, support, maintenance functions, etc and placement composition of unit rooms by each floor on the basis of internal area of exhibition and convention facility in Korea and Japan. As the result of analyzing 10 examples(K1~J5), the placement of auditorium and multi-purpose hall was affected according to location of exhibition room and conference room in the composition of unit rooms by each floor and the installment ratio of support facility in Korean examples was higher than in Japanese examples. In case of facility scale, the Japanese examples were overall small in the whole scale relatively to Korean examp.
Korean Journal of Construction Engineering and Management
/
v.16
no.2
/
pp.97-105
/
2015
Building information modeling (BIM)-based construction projects have increased and become more varied, and as such the management of BIM-based facility information is also increasingly important for facility maintenance. Information management, and specifically product data mapping, however, has some problems in the area of manual data entry and does not adequately consider the exchange requirements of facility maintenance. Therefore, it is necessary to introduce a method to improve the management of composite object information for BIM-based facility maintenance so that it can handle construction operation building information exchange (COBie) data for a composite object. Therefore, we present a method to map COBie data to related materials of a composite object. This research contributes to increasing the efficiency and accuracy of the required information mapping between a building model and product data using a BIM library through optimal BIM data adoption. Moreover, it allows for the creation and management of specific product data at the design development phase.
Korean Journal of Construction Engineering and Management
/
v.21
no.3
/
pp.3-10
/
2020
The endowment and concession has been put to practical use for the relocation projects of military Facilities. Yet, in terms of the project implementation, delay of a great deal of the projects is occurring due to related regulations and standards, as well as a lack of mutual understanding between project implementers and military units. This study analyzes the risk factors by identifying and prioritizing the potential risk factors at each stage of project implementation such as the issues that limit project characteristics and implementation. Among the derived risk factors, request exceeding facility standards in the licensing and design phases, opposition to troop relocation in the project approval phase, design change during construction phase in the construction and completion phases, dissenting opinions on endowed/conceded property in the property disposal phase and absence of facility standards in the MOA conclusion phase were found to be the main object of consideration in risk management. This study is expected to provide project managers with a guideline for effectively pursuing the projects, as it provides prioritization and optimization of risk management.
Journal of the Korea Institute of Building Construction
/
v.9
no.4
/
pp.147-155
/
2009
Recently, the scale and technical complexity of agricultural production has been growing. Therefore, agricultural facilities are being gradually diversified, expanded, and made more complex. To furnish Korea's agricultural industry with international competitiveness, it is thus necessary to introduce new management techniques. The PCM (procurement-construction-maintenance) information management system for agricultural facilities is established by setting up its WBS (work breakdown structure). In this study, the WBS of a facility such as facility, space, element, works, and resources is analyzed. Following this analysts, a WBS of an agricultural facility that is appropriate for the PCM information system of an agricultural facility, is proposed by deriving it from actual WBS.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.