• 제목/요약/키워드: Construction facility

검색결과 1,622건 처리시간 0.026초

하천제방의 합리적인 설계 방안 (A Study of alternative to rational design of Levee)

  • 김진만;최봉혁
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2010년도 추계 학술발표회
    • /
    • pp.119-123
    • /
    • 2010
  • Causes of the levee collapse are directly or indirectly associated with geotechnical engineering as well as hydraulics. In this paper, literature survey and analysis were conducted to present the alternatives in geotechnical engineering issues for rational levee design. The alternatives include the reasonable river-bed soil utilization and precautions of numerical analysis and slope stability analysis, disruption type and improvement method of drainage facility.

  • PDF

중.저준위 방사성폐기물의 천층처분을 위한 인공방벽 실증시험시설의 건설 및 운전 경험 (Construction and Operational Experiences of Engineered Barrier Test Facility for Near Surface Disposal of LILW)

  • Jin-Beak Park;Se-Moon Park;Chang-Lak Kim
    • 방사성폐기물학회지
    • /
    • 제2권1호
    • /
    • pp.23-34
    • /
    • 2004
  • To validate the previous conceptual design of cover system, construction of the engineered barrier test facility is completed and the performance tests of the disposal cover system are conducted. The disposal test facility is composed of the multi-purpose working space, the six test cells and the disposal information space for the PR center. The dedicated detection system measures the water content, the temperature, the matric potential of each cover layer and the accumulated water volume of lateral drainage. Short-term experiments on the disposal cover layer using the artificial rainfall system are implemented. The sand drainage layer shows the satisfactory performance as intended in the design stage. The artificial rainfall does not affect the temperature of cover layers. It is investigated that high water infiltration of the artificial rainfall changes the matric potential in each cover layer. This facility is expected to increase the public information about the national radioactive waste disposal program and the effort for the safety of the planned disposal facility.

  • PDF

액체로켓엔진 연소기의 성능평가를 위한 가압식 연소시험설비의 구성 요구조건 (Sub-System Requirements of a Pressure-fed Hot-firing Test Facility for the Performance Assessment of a LRE Thrust Chamber)

  • 이광진;임병직;서성현;한영민;최환석
    • 한국추진공학회지
    • /
    • 제15권4호
    • /
    • pp.94-102
    • /
    • 2011
  • 액체산소와 케로신을 사용하는 액체로켓엔진 연소기의 성능평가를 위한 가압식 연소시험설비의 구성 요구조건에 대해 기술하였다. 본 논문에서 제시한 가압식 연소시험설비의 요구조건들은 KSR-III 및 30톤급 액체로켓엔진 연소기의 자력개발 과정에서 활용된 지상연소시험장 구축과 운용 경험을 바탕으로 도출된 것이다. 따라서 본 논문은 대형 연소시험설비의 설계 및 시공을 위한 사전 검토 내역 및 기본 자료로 활용할 수 있을 것으로 기대한다.

액체로켓엔진 연소기의 성능평가를 위한 가압식 연소시험설비의 구성 요구조건 (Sub-System Requirements of a Pressure-fed Hot-firing Test Facility for the Performance Assessment of a LRE Thrust Chamber)

  • 이광진;임병직;서성현;한영민;최환석
    • 한국추진공학회:학술대회논문집
    • /
    • 한국추진공학회 2010년도 제35회 추계학술대회논문집
    • /
    • pp.63-71
    • /
    • 2010
  • 액체산소와 케로신을 사용하는 액체로켓엔진 연소기의 성능평가를 위한 가압식 연소시험설비의 구성 요구조건에 대해 기술하였다. 본 논문에서 제시한 가압식 연소시험설비의 요구조건들은 KSR-III 및 30톤급 액체로켓엔진 연소기의 자력개발 과정에서 활용된 지상연소시험장 구축과 운용 경험을 바탕으로 도출된 것이다. 따라서 본 논문은 대형 연소시험설비의 설계 및 시공을 위한 사전 검토 내역 및 기본 자료로 활용할 수 있을 것으로 기대한다.

  • PDF

GSIS를 이용한 상수도시설물의 데이터베이스 구축 및 관리시스템 개발에 관한 연구 (A Study on the Database Construction and the Management System Development of Water-Facility Using GSIS)

  • 김영곤
    • 대한공간정보학회지
    • /
    • 제10권1호
    • /
    • pp.109-123
    • /
    • 2002
  • 본 연구의 목적은 GSIS를 이용한 상수도시설물 데이터베이스 구축과 관리시스템의 개발에 있다. 상수도관의 변류시설을 효과적으로 구축하기 위해 GSIS 데이터모델인 라우트시스템과 이벤트 테이블을 활용하는 기법을 적용하였으며, 개발된 관리시스템을 실제로 적용하여 기존의 일반 상수도시설 관리방법과 업무효율성, 정보탐색비용, 데이터베이스 관리효율성 측면에서 비교 분석하였다. 또한, 개발한 상수도관리시스템과 다른 2개 지방자치단체의 시스템들을 기능, 처리속도, 및 운영의 편리성 측면에서 비교 고찰하였다. 업무모델의 일반화는 국내 3개 지방자치단체의 상수도시스템에 대한 자료를 기초로 하여 시도하였고 일반화된 업무모델은 광역상수도시스템의 업무모델로 보완한 다음 이를 다른 2개 지방자치단체의 상수도 업무모델과 비교 분석하였다. 향후 지방자치단체에서 GSIS에 의한 상수도시설물 관리 시스템을 구축할 경우, 본 연구에서 일반화 된 업무모델을 이용한다면 좀 더 효율적이고 경제적으로 구축할 수 있을 것이다.

  • PDF

민군 시설공용 확대 및 활성화 방안에 관한 연구 - 요인 분석과 AHP분석 기법으로 - (A Study on the Expansion and Revitalization Plan when Conceiving Civil and Military Sharing Facilities - Factor Analysis and Analytic Hierarchy Process -)

  • 공금록;박영준
    • 대한건축학회논문집:구조계
    • /
    • 제34권5호
    • /
    • pp.19-26
    • /
    • 2018
  • A civil-military facility sharing project is a part of mutual cooperative efforts, which enables the military to use any civilian (local government or company) or a civilian to use any military facility. Such facility sharing project may reduce or clear possible conflicts with the local residents in the surrounding area of a military facility while being available to save budgets for new construction or maintenance of a defense or military facility. Various measures have been proposed for institutional resolutions on conflicts with the local residents in the surrounding area of a military facility. This study collects and organizes previous cases of the civilian-military facility sharing projects, and analyzes the characteristics of such cases based on the project types. In addition, by organizing and proposing the project characteristics, plans (ideas) and determination criteria to expand and vitalize are presented regarding the project types having restrictions. AHP technique is employed to research on the matrix for the project feasibility determination. Also, the opinions organized through the cause analysis are categorized and presented as a project for the expansion and vitalization of future project. According to the rearch result, Type I, II and III are determined to be projects that can be implemented without difficulties. Type IV, on the other hands, is determined as not illegal, yet inadequate so that some legal and institutional complements are required to expand and vitaliza this facility sharing project.

유니버설 디자인의 원리와 지침에 의한 노인복지시설 기준 분석: 법률 규정을 중심으로 (Analysis of Facility Standard for Elderly Welfare Facility by Universal Design Principle and Guideline: Focusing on Legal Regulations)

  • 김수정
    • 산업융합연구
    • /
    • 제15권1호
    • /
    • pp.1-7
    • /
    • 2017
  • The purpose of this study is to analyze the facility standards of the elderly welfare facilities applying the seven principles of the universal design. The facility standards of the elderly welfare facilities were limited to the provisions of the "Enforcement Regulation of the Elderly Welfare Act". There are few legal regulations applying the universal design in the construction of the elderly welfare facilities. The facility standards are set only with the minimum requirements such as securing the safety of the user, securing the space area, functional convenience, and risk prevention. However, the contents of the regulations are limited to the minimum standards for functional convenience and safety required for living. In conclusion, in the elderly welfare facilities, the notion of universal design, which considers not only the elderly, but also service providers, employees, and general visitors, should be considered.

  • PDF

정보화에 의한 시설공사 감리업무 전자화방안 (Electronic Supervision System of Construction Facility by Construction IT)

  • 강인석;문현석;박서영;이양규
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2005년도 추계학술대회 논문집
    • /
    • pp.1143-1148
    • /
    • 2005
  • Recently, the application of construction IT (Information Technology) is recognized as an essential tool for the effective construction management and construction CALS. And the large construction projects are already using PMIS tool, and the application of construction IT tool will be accelerated by rapid popularization of computerized construction management system. This study defines a concept of construction IT and suggests an improved method to apply construction IT tool for construction supervision system.

  • PDF

Genetic Algorithm을 이용한 건설물자재의 Layout (Facility Layout Problem with Genetic Algorithm)

  • 장현승
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2003년도 학술대회지
    • /
    • pp.99-103
    • /
    • 2003
  • 건설공사 현장에서 공간활용을 위해 가장 보편적으로 쓰이는 방법이 site plans 이다. 이 방법은 건설 물자재를 적재하고 운반할시 공간이 부족한 도심지 부근에서 어떻게 건설 물자재를 옮기고 적재하는가? 크래인의 위치는 어디에 선정할것인가? 하는 문제를 해결하기 위한 것이다. 본고는 이러한 문제를 수평적으로 해결함과 동시에 수직적으로도 해결할 수 있는 방안을 도출했다. 이러한 해결 방안은 건설현장을 지도 또는 감독하는 메니져에게 가장 효과적으로 건설 물자재를 적재시켜 줄 수 입어 방법론을 제시함으로써 공기의 단축을 가져올 수 있는 효과를 누릴 수 있다. 방법론으로는 Genetic Algorithm을 이용하여 multiple-floor layout 문제점 해결하였다.

  • PDF

교육시설의 개념단계 공사비예측을 위한 인공신경망모델 개발에 관한 연구 (A Study on the Model of Artificial Neural Network for Construction Cost Estimation of Educational Facilities at Conceptual Stage)

  • 손재호;김청융
    • 한국건설관리학회논문집
    • /
    • 제7권4호
    • /
    • pp.91-99
    • /
    • 2006
  • 본 연구는 신축 교육시설 프로젝트의 개념단계에서 공사비를 예측하기 위한 인공신경망모델의 제안을 목적으로 한다. 현행 공공 교육시설의 개념단계 공사비예측에는 기본인자인 연면적에 의한 단일변수 모델이 적용되고 있다. 그러나 개념단계에서 단일변수 공사비예측모델을 적용하여 예측된 공사비는 그 오차범위가 크고, 실시설계 완료 후 물량산출에 의해 산정된 상세공사비와 비교하여 큰 차이를 보일 경우 프로젝트의 수정이 불가피하며, 이는 프로젝트의 비용을 증가시키고 공기를 지연시킨다. 그러므로 본 연구에서는 교육시설 프로젝트의 사업계획 수립 및 예산확보 과정에서 공사비예측에 적용이 가능한다 변수 인공신경망모델을 제안하였다. 개발된 모델을 평가한 결과 평균오차율이 6.82%로써, 평균 93.18%의 정확도를 기록하였다. 제안된 인공신경망모델은 지난 5년간 신축된 교육시설의 공사예정금액을 실적자료로 사용하여 학습되었기 때문에, 차후 교육시설 신축공사의 예산편성에 그 활용이 기대된다.