• Title/Summary/Keyword: Construction document phase

Search Result 26, Processing Time 0.026 seconds

An Analysis of the Duration of the Construction Document Phase of Large Public Building Projects Delivered by the Total Solution Service from 2009 to 2014 (공공기관 발주 대형건축공사 실시설계 기간에 대한 분석 및 개선방안 -2009년부터 2014년까지 공공발주 맞춤형 서비스 프로젝트를 중심으로 -)

  • Jung, Wooyoung;Lee, Taewon;Rhee, Pung-wook;Lee, Ghang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.4
    • /
    • pp.89-97
    • /
    • 2015
  • This paper analyzes the duration of the construction document (CD) phase of 42 large public building projects delivered by the total solution service of Public Procurement Services in Korea from 2009 to 2014. The quality of construction documents significantly affects the quality of construction and facility management. Thus, securing appropriate time for the CD phase during project planning is important for the quality of a project. Currently, the duration of the CD phase is planned based on the construction costs of a project following a notice of the Ministry of Land, Infrastructure and Transport. However, our analysis results showed that the correlation between the actual duration of the CD phase and construction costs is very weak. The actual CD phase takes 1.33-1.79 times longer than the planned duration. The practitioners who were interviewed, were already aware that the correlation between the duration of the CD phase and the construction costs is weak. They identified the complexity of the project, the extent of the design changes, project type, client characteristics, and others as more influential factors on the CD phase than the construction costs. To improve the quality of CDs, a new guideline for determining an adequate CD phase duration should be studied and developed.

INTEGRATION OF SSM AND IDEF TECHNIQUES FOR ANALYZING DOCUMENT MANAGEMENT PROCESSES

  • Vachara Peansupap;Udtaporn Theingkuen
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.725-731
    • /
    • 2009
  • Construction documents are recognized as an essential component for making a decision and supporting on construction processes. In construction, the management of project document is a complex process due to different factors such as document types, stakeholder involvement, document flow, and document flow processes. Therefore, inappropriate management of project documents can cause several impacts on construction work processes such as delay or poor quality of work. Several information and communication technologies (ICT) were proposed to overcome problems concerning document management practice in construction projects. However, the adoption of ICT may have some limitation on the compatibility of specific document workflow. Lack of understanding on designing document system may cause many problems during the use and implementation phase. Thus, this paper proposes the framework that integrates Soft System Methodology (SSM) concept and Integrated Definition Modeling Technique (IDEF) for analyzing document management system in construction project. Research methodology is classified as the case study. Five main construction building projects are selected as case studies. The qualitative data related to problems and processes are collected by interviewing construction project participants such as main contractors, owners, consultants, and designers. The findings from case study show the benefits of using SSM and IDEF. The use of SSM can help identify the problems in managing construction document in rich picture view whereas IDEF can illustrate the document flow in construction project in details. In addition, the idea of integrating these two concepts can be used to identify the root causes of process problems at the information level. As the results, this idea can be applied to analyze and design web-based document management system in the future.

  • PDF

Automatic Construction of Korean Unknown Word Dictionary using Occurrence Frequency in Web Documents (웹문서에서의 출현빈도를 이용한 한국어 미등록어 사전 자동 구축)

  • Park, So-Young
    • Journal of the Korea Society of Computer and Information
    • /
    • v.13 no.3
    • /
    • pp.27-33
    • /
    • 2008
  • In this paper, we propose a method of automatically constructing a dictionary by extracting unknown words from given eojeols in order to improve the performance of a Korean morphological analyzer. The proposed method is composed of a dictionary construction phase based on full text analysis and a dictionary construction phase based on web document frequency. The first phase recognizes unknown words from strings repeatedly occurred in a given full text while the second phase recognizes unknown words based on frequency of retrieving each string, once occurred in the text, from web documents. Experimental results show that the proposed method improves 32.39% recall by utilizing web document frequency compared with a previous method.

  • PDF

OPPORTUNITIES FOR IT IN CONSTRUCTION INDUSTRY OF IRAN

  • A. Hemmati;Kheyroddin
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.424-432
    • /
    • 2007
  • The last twenty-five years have seen dramatic improvements in and widespread use of IT to describe and document the work of the many disciplines involved in construction projects. Iran is a developing country and construction is a basic factor of developing too. Hence, the country needs to a special programming for construction of buildings, structures and infrastructures. Many parts of Iran are located in highly seismic zones and structures must be constructed safe e.g., according to recent seismic codes. In this paper opportunities of IT in construction industry of Iran are investigated in three categories. Pre-construction phase, construction phase and earthquake disaster mitigation are studied. Studies show that information technology can be used in these items for reducing the losses and increasing the benefits. Both government and private sectors must contribute to this strategic project for obtaining the best result.

  • PDF

Analysis of the Importance from Detailed Work (Role) of the Construction Manager for G-SEED Certification in the Design Phase (녹색건축인증을 위한 설계단계 건설사업관리자의 세부 업무(역할)별 중요도 분석)

  • Lee, Duhwan;Kang, Seongmi
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.6
    • /
    • pp.103-112
    • /
    • 2020
  • In this study, based on actual project implementation cases, task management plans for construction management related green building certification were derived in major stages. Accordingly, the importance from details of construction management tasks for the operation and management process of the schematic design phase, design development phase, and construction document phase, focusing on G-SEED certification, was analyzed. In addition, major items were derived based on the weight of additional construction costs and acquisition scores through previous research cases on the analysis of construction costs for G-SEED certification, and the importance from details of construction management tasks on the major items of G-SEED certification was analyzed. As a result, the review and confirmation of the elements of reflection related to G-SEED in the schematic design phase, the adequacy of design documents and the connectivity of design phase in the design development phase were important. And the review and confirmation of the items directly related to the construction phase in the construction document phase were important.

Analysis on Characteristic of Construction Cost for Steel Box Bridge (강박스교량 공사비 특성 분석)

  • Sun, Chang Won;Kyung, Kab Soo;Kang, Shin Hwa;Kwon, Soon Cheol
    • Journal of Korean Society of Steel Construction
    • /
    • v.21 no.1
    • /
    • pp.1-14
    • /
    • 2009
  • Estimating appropriate construction cost at the design phase is judged with one important issue to the efficient security and the execution of budget. Therefore, in this paper, to build fundamental data of appropriate construction cost for steel box bridges, the existing calculated document such as the quantity, unit price document and detail items etc.. was analyzed and the basic specification of the bridges was investigated. Also, by estimating the relationship between predetermined cost and construction items on the bridges, the paper is intended to produce basic data for the calculation of appropriate construction cost in planning phase. From the result, it was calculated ratio of construction item in the total construction cost and unit cost. And then it was deduced effect factor of construction cost in steel box bridge.

Development of BIM-based Construction Document Information Database Structure through the Link to the BIM Model and Construction Document Information (설계모델과 문서정보의 효율적 연계를 위한 BIM기반 데이터베이스 체계 구축방안)

  • Lee, Donggun;Cha, Heesung;Kim, Kyungrai;Shin, Dongwoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.5
    • /
    • pp.42-53
    • /
    • 2015
  • Construction industry has the form of industry progressed through mutual cooperation among participants in various fields. Accordingly, it may be referred to as an aggregate of information where various pieces of information are generated and managed according to each construction phase. Most of the information on the construction project is issued in the form of a document. And document management of the site is critical to successful execution of the project. Therefore, in the construction site to use IT technology for efficient information management. But, most of the information on the construction site is managed by the non-structured document. and Information management in the construction site is difficult to lack of information management systems. In this study, proposed construction information database structure and breakdown structure to the information management of the construction site through the BIM technology. Therefore, previous studies were reviewed about the document management and information link management. and Space breakdown structure and information breakdown structure was proposed to structure the information of the construction site and Database for information storage is designed. And, BIM-based construction information database was examined through the application scenario.

Developing a Drawing Template for BIM software to Improve BIM-based Drawing Work Efficiency in the Construction Document Phase (실시설계단계 BIM 기반 도면 작업 효율 향상을 위한 도면화 템플릿 개발)

  • Kim, Yi-Je;Kim, In-Chie;Chin, Sang-Yoon
    • Journal of KIBIM
    • /
    • v.10 no.4
    • /
    • pp.98-109
    • /
    • 2020
  • Based on the prior research which developed the consistency review checklist of the BIM model and 2D drawing through the drawing analysis of the construction documents phase, the apparent limits of the existing template and the template development items were derived. As well, the BIM-based drawing templates of the construction documentation phase were developed and verified using ArchiCAD BIM software. The developed template was then applied to the actual project model in the construction documents phase, and, as a result, 50% of existing work elements could be utilized as templates. This is an increase of more than 30% over the existing template utilization elements, and it is analyzed to be effective in practical application and utilization. Based on the results of this study, if the BIM model construction criteria matching the drawing's utilization purpose are presented, while at the same time the BIM data interlocking and drawing template development studies are conducted, the utilization of BIM data can be maximized and additional drawing work can be minimized to increase the percentage of template utilization elements. In addition, it is believed that this can employed to address functional and institutional problems of BIM-based drawing and make a contribution to the activation of BIM.

Reliability Analysis and Utilization of BIM-based Highway Construction Output Volume (BIM기반 고속도로 공사 물량산출 신뢰성 검토 및 활용)

  • Jung, Guk-Young;Woo, Jeong-Won;Kang, Kyeong-Don;Shin, Jae-Choul
    • Journal of KIBIM
    • /
    • v.3 no.3
    • /
    • pp.9-18
    • /
    • 2013
  • In case of applying the BIM method in the civil engineering of irregularly shaped structure, BIM method began to be introduced in the current building engineering area compared with the expected effects of the relatively high construction productivity has been recognized. In this paper, I have developed quantity calculation algorithms applying it to earthwork and bridge construction, tunnel construction, retaining wall construction, culvert construction and implemented BIM based 3D-BIM Modeling quantity calculation. Structure work in which errors occurred in range between -6.28% ~ 5.17%. Especially, understanding of the problem and improvement of the existing 2D-CAD based of quantity calculation through rock type quantity calculation error in range of -14.36% ~ 13.07% of earthwork quantity calculation. It's benefit and applicability of BIM method in civil engineering. In addition, routine method for quantity of earthwork has the same error tolerance negligible for that of structure work. But, rock type's quantity calculated as the error appears significantly to the reliability of 2D-based volume calculation shows that the problem could be. Through the estimating quantity of earthwork based 3D-BIM, proposed method has better reliability than routine method. BIM, as well as the design, construction, maintenance levels of information when you consider the benefits of integration, the introduction of BIM design in civil engineering and the possibility of applying for the effectiveness was confirmed. In addition, as the beginning phase of information integration, quantity document automation program has been developed for activation of BIM. And automatically enter the program code number, linkage and manual volume calculation program, quantity document automation programs, such as the development is now underway, and step-by-step procedures and methods are presented.

Linking LOD and MEP Items towards an Automated LOD Elaboration of MEP Design

  • Shin, Minso;Park, SeongHun;Kim, Tae wan
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.768-775
    • /
    • 2022
  • Current MEP designs are mostly applied by 2D-based design methods and tend to focus on simple modeling or geometry information expression such as converting 2D-written drawings into 3D modeling without taking advantage of the strength of BIM application. To increase the demand for BIM-based MEP design, geometric information, and property information of each member of the 3D model must be conveniently linked from the phase of the Design Development (DD) to the phase of Construction Document (CD). To conveniently implement a detailed model at each phase, the detailed level of each member of the 3D model must be specific, and an automatic generation of objects at each phase and automatic detailing module for each LOD are required. However, South Korea's guidelines have comprehensive standards for the degree of MEP modeling details for each design phase, and the application of each design phase is ambiguous. Furthermore, in practice, detailed levels of each phase are input manually. Therefore, this paper summarized the detailed standards of MEP modeling for each design phase through interviews with MEP design companies and related literature research. In addition, items that enable auto-detailing with DYNAMO were selected using the checklist for each design phase, and the types of detailed methods were presented. Auto-detailing items considering the detailed level of each phase were classified by members. If a DYNAMO algorithm is produced that automates selected auto-detailing items in this paper, the time and costs required for modeling construction will be reduced, and the demand for MEP design will increase.

  • PDF