• Title/Summary/Keyword: Construction disaster

Search Result 1,482, Processing Time 0.031 seconds

Track Models Generation Based on Spatial Image Contents for Railway Route Management (철도노선관리에서의 공간 영상콘텐츠 기반의 궤적 모델 생성)

  • Yeon, Sang-Ho;Lee, Young-Wook
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.30-36
    • /
    • 2008
  • The Spatial Image contents of Geomorphology 3-D environment is focused by the requirement and importance in the fields such as, national land development plan, telecommunication facility management, railway construction, general construction engineering, Ubiquitous city development, safety and disaster prevention engineering. The currently used DEM system using contour lines, which embodies geographic information based on the 2-D digital maps and facility information has limitation in implementation in reproducing the 3-D spatial city. Moreover, this method often neglects the altitude of the rail way infrastructure which has narrow width and long length. There it is needed to apply laser measurement technique in the spatial target object to obtain accuracy. Currently, the LiDAR data which combines the laser measurement skill and GPS has been introduced to obtain high resolution accuracy in the altitude measurement. In this paper, we tested of the railway facilities using laser surveying system, then we propose data a generation of spatial images for the optimal manage and synthesis of railway facility system in our 3-D spatial terrain information. For this object, LiDAR based height data transformed to DEM, and the realtime unification of the vector via digital image mapping and raster via exactness evaluation is transformed to make it possible to trace the model of generated 3-dimensional railway model with long distance for 3D tract model generation. As the results, We confirmed the solutions of varieties application for railway facilities management using 3-D spatial image contents.

  • PDF

Development of Mobile-Based Design Value Engineering(VE) Supporting System for VE Process Improvement (VE프로세스 개선을 위한 모바일 기반의 설계VE 시스템 개발)

  • Song, Chang-Young;Yang, Byong-Soo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.21 no.5
    • /
    • pp.433-443
    • /
    • 2021
  • Value Engineering(VE) is an organized effort to create the most value through a functional analysis and creation of alternatives. Depending on the VE job plan, a VE Workshop must be performed in a certain place within a certain period of time. A VE Workshop, which is an organized activity that aims to create the best value through functional analysis and creation of alternatives, should be held in a certain place and at a scheduled time according to the VE job plan. In the Pre-Study, VE Study and Post-Study phases of VE, functional assessments, performance evaluations and idea evaluations are driven by variable management techniques and analysis methods, respectively. Generally, VE is executed for about 3 to 5 days in a particular place to create value. However, there are many problems associated with limiting all VE processes to a specific place and schedule. Moreover, in Korea, VE teams are required to finish all VE processes in a limited time because of the short duration of VE workshops, the necessity of which has been overlooked. Therefore, an efficient VE support system is required to resolve the problem of time and space limitations. In this study, a VE support system based on the Mobile environment was developed to support the VE Workshop process. This VE support system enables participants to review design documents, drawing sheets and all VE-related documents using mobile devices. After the Workshop, participants can conveniently rearrange the result(evaluation of function and ideas) at the workshop. Not only can the members of VE team can review the design documents, drawing sheet and all VE-related documents in the step before the workshop, but also the result(evaluation of function and ideas) of the workshop can be easily rearranged in the phase after the workshop under the developed supporting system using mobile devices.

A Field Test on Bearing Capacity Characteristics of Materials for Ground Cavity Restoration Based on Plate Bearing Test (평판재하시험을 이용한 공동 복구재료의 지지특성에 관한 현장실험)

  • Park, Jeong-Jun;Shin, Heesoo;Kim, Dongwook;You, Seung-Kyong;Yun, Jung-Mann;Hong, Gigwon
    • Journal of the Korean Geosynthetics Society
    • /
    • v.17 no.4
    • /
    • pp.293-304
    • /
    • 2018
  • This paper described a results of field test based on plate bearing test of the restoration material, which was developed to restore the ground cavity due to sewerage damage. The analysis of bearing capacity characteristics on the restoration materials was performed by experimental results. The results showed that the load bearing capacity in the maximum stress condition of the foundation ground is about 66%-70%, when the expansion mat is embedded at the bottom of 0.1 m and 0.2 m from the ground surface. However, The load bearing capacity of expansion mat according to embedded depth was not large. The load bearing capacity of concrete mats was about 82%-90% compared with that of ground surface, and it showed about 50% of the load bearing capacity compared with the expansion mat. As a result of analysis of allowable bearing capacity according to restoration materials, it was confirmed that the allowable bearing capacity of the expansion mat and the concrete was about 130%-150% and about 160% more than the foundation ground, respectively.

Investigation for the deformation behavior of the precast arch structure in the open-cut tunnel (개착식 터널 프리캐스트 아치 구조물의 변형 거동 연구)

  • Kim, Hak Joon;Lee, Gyu-Phil;Lim, Chul Won
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.21 no.1
    • /
    • pp.93-113
    • /
    • 2019
  • The behavior of the 3 hinged precast arch structure was investigated by comparing field measurements with numerical analyses performed for precast lining arch structures, which are widely used for the open-cut tunnel. According to the field measurements, the maximum vertical displacement occurred at the crown with upward displacements during the backfilling up to the crown of the arch and downward displacements at the backfill height above the crown. The final crown displacement was 19 mm upward from the original position. The horizontal displacement at the sidewall, which had a maximum horizontal displacement, occurred inward of the arch when compacting the backfill up to the crown and returned to the original position after completing the backfill construction. According to the analysis of displacement measurements, economical design is expected to be possible for precast arch structures compared to rigid concrete structures due to ground-structure interactions. Duncan model gave good results for the estimation of displacements and deformed shape of the tunnel according to the numerical analyses comparing with field measurements. The earth pressure coefficients calculated from the numerical analyses were 0.4 and 0.7 for the left and the right side of the tunnel respectively, which are agreed well with the eccentric load acting on the tunnel due to topographical condition and actual field measurements.

A Study on the Type of Planting according to the Establishment and Management of the Royal Tombs of the Joseon Dynasty (조선왕릉 조성 및 관리에 따른 식재유형 고찰)

  • Kim, Eun-Kyoung;Bae, Jun-Gyu
    • Journal of the Korean Institute of Traditional Landscape Architecture
    • /
    • v.37 no.1
    • /
    • pp.33-40
    • /
    • 2019
  • The purpose of this study is to analyze historical records of what the trees had been planted like by establishment and management of the Royal Tombs of the Joseon Dynasty so that it could be utilized for historical records to manage the trees in the Royal Tombs. The research method was to analyze the related keywords for 40 trees out of 42 trees in the Royal Tombs of the Joseon Dynasty reffering to "The Annals of the Joseon Dynasty(朝鮮王朝實錄)," and "Neungji(陵誌)". There are two types of planting called Jeongsik(定植) Bosik(補植) in the Royal Tombs. Jeongsik(定植) is a planting method by Salleungdogam(山陵都監), the office in charge of construction of the royal tomb when they were building the royal tomb. Every tree additionally planted after building up the royal tomb was called Bosik(補植). The types of tree planting the composition and management of the royal tombs of Joseon are as follows. First, the first planting for landscaping was carried out during the process of building the province. Second, after the formation of Shanung, all the plants were planted by Wangmyung as additional plants. Third, due to the deforestation in the late Joseon period, additional plants were planted in the fertile plains. Fourth, trees were damaged due to natural disasters, and trees were planted together with the construction of the botanical gardens. Fifth, in the 22nd year of King Jeongjo, all the royal families' graves were regularly planted. This study aims to investigate the history of forest landscape management for the restoration of the royal tombs of Joseon.

A Study on Optical Design Factors by Artificial Recharge Performance (인공함양 주입성능평가에 의한 설계요소 산정 연구)

  • Won, Kyoung-Sik;Lee, Yeoung-Dong;Shin, Dong-Min;Kim, Byeong-Jun;Kim, Gyoo-Bum
    • The Journal of Engineering Geology
    • /
    • v.30 no.4
    • /
    • pp.603-615
    • /
    • 2020
  • The design factors of artificial recharge are determined by considering the hydrogeological characteristics of the aquifer. The optimal design factors for artificial recharge were derived after performing the injection tests step by step for each injection type (vertical well, ditch and mixed type), which were built in the test site of the study area. It was analyzed that the difference in the injection effect according to the diameter of the injection well was not large, and the 100 mm well was evaluated as appropriate in consideration of the availability and economy of land use. Since the injection effect was well maintained even in the upper rock, the depth of the injection well was proposed for the alluvial layer and the upper rock layer. On the other hand, in four cases of filter media in the ditch, it was analyzed that the penetration efficiency and the hydraulic interference effect indicated excellent injection performance when a filter medium of 10 to 30 mm diameter was filled in the ditch. In addition, the proper spacing of the injection wells was analyzed as 9~12 m considering the interference efficiency. The interference efficiency attenuation coefficient per 1 m of hole spacing was calculated to be 1.75% in this area. In the future study, the artificial recharge design factors obtained in this stage are applied and verified on site construction and operation. Also it is expected to contribute to securing water in areas where there is always a lack of water.

Investigating on the Necessity of Integrated Project Management System for Effective Facility Management Utilizing Digital Twin Technology (디지털트윈을 활용한 건축물 시설안전대응 통합관리체계 구축 필요성에 관한 연구)

  • Yum, Sang-Guk;Park, Young-Jun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.42 no.5
    • /
    • pp.711-721
    • /
    • 2022
  • Due to a long-term pandemic of COVID-19 since 2019, our society finally goes into 'un-tact (non-contact) era' in earnest by increasing an importance of non-contacted activities which are able to live without contacts among people. Un-tact era has influenced to generate a huge structural change with digitalization in our daily life as well as industrial society based on digital twin as an essential technology. As a technology representing real world in virtual digital world by integrating various technologies applied to 4th industrial revolution, digital twin leads an innovation in industrial society with diverse industrial processes. But this technique isn't actively used across all industries due to structural limitations and environmental restrictions of digital twin. Especially, the field of construction and facility is necessary to use digital twin because it requires periodic managements of buildings in daily life and is directly connected with casualties in cases of disaster. But issues faced in reality are acting as an obstacle for applying digital twin. Therefore, this study suggests the necessity applying digital twin in facility safety response based on these issues and emphasizes active applications of digital twin by describing the expected effects being created. Furthermore, it connects to create demands of digital twin by overcoming current issues and suggesting high sustainable development.

A Study on the Changes in the Back Garden of Gyeongbokgung Palace during Cheongwadae Period through an Interview with Landscape Manager (조경 관리자 인터뷰를 통한 청와대 시기 경복궁 후원의 변화에 관한 연구)

  • Kim, Kyu-Yeon;Lee, Shi-Young;Choi, Jaehyuck;Choi, Jong-Hee
    • Journal of the Korean Institute of Traditional Landscape Architecture
    • /
    • v.41 no.2
    • /
    • pp.26-34
    • /
    • 2023
  • This study conducted interviews with former and current managers of Cheongwadae landscape architecture to provide basic information necessary to preserve, manage, and utilize Gyeongbokgung Palace's back garden, and the main conclusions summarized are as follows. First, the topography changed a lot with the construction of the main building and the official residence under President Roh Tae-woo. The water system was connected to Gyeongbokgung Palace in the past, but is now disconnected. Second, in the case of planting, the most important principles were the president's security and protocol, and accordingly, trees were placed or managed. Trees were planted by introducing excellent trees in various regions, and wildflowers and ground cover plants were frequently replaced according to the season. Third, facilities and roads were arranged for the president's protocol, hobbies, and workers' rest, and fire-fighting facilities were installed to prevent disaster in the forest area of Baegaksan Mountain. Fourth, the biggest inflection point of Gyeongbokgung Palace's back garden during Cheongwadae period was the change in topography due to the new construction of the main building and official residence during President Roh Tae-woo, the removal of A and B barbed wire fences that separated space during President Roh Moo-hyun, and the extensive landscaping carried out for the G20 Summit under President Lee Myung-bak. The area of Gyeongbokgung Palace's back garden is expected to face another inflection point due to the opening of Cheongwadae on May 10, 2022, and the work of evaluating the historical, academic, and landscape values of Gyeongbokgung Palace's back garden should be carried out while preserving the status.

Analysis of Forest Environmental Factors on Torrent Erosion control work area in Gyeongsangnam-do - Focus on Erosion Control Dam and Stream Conservation - (경남지역 야계사방사업지의 산림환경특성 분석 - 사방댐 및 계류보전사업을 중심으로 -)

  • Kang, Min-Jeng;Kim, Ki-Dae;Oh, Kang-San;Park, Jin-Won;Park, Jae-Hyeon
    • Journal of agriculture & life science
    • /
    • v.50 no.5
    • /
    • pp.111-120
    • /
    • 2016
  • The objective of this study was to provide basic information for selecting the right timing and the right place of erosion control of stream on Gyeongsangnam-do. In order to achieve this objective, a total of 526 erosion control dams and 230 mountains stream conservation facilities on the constructed places and construction planned places for the erosion control were investigated on site, forest physiognomy, and hydrologic conditions. The erosion control dams and mountain stream conservation facilities were mostly constructed in the area, which has the sedimentary rock, 200-400m of altitude, a slope of 21~30°, and II of landslide hazard map. Among the forest environmental factors, it was only similar to the construction frequency in the areas that have small diameter class, III age class. Also, we investigated the hydrological environmental factors that determine the size and numbers of erosion control dam. The places constructed to the highest frequency were below 50ha in the area, 2.1~4.0km/㎢ of drainage density, longitudinal water system, 61~90mm of maximum precipitation per hour, and 201~300mm of day maximum precipitation. As the results, the sites and floodgate conditions between the constructed places and stream conservation facilities for the erosion control showed to be very similar. Therefore, these results indicate that the erosion control of the stream of the areas, which have the disruption of mountain peaks and the high erosion risk areas, should be used on both the erosion control dam and stream conservation facilities.

Evaluation on Odor Removal Performance of Bacteria-Based Odor Reduction Kit for Revetment Blocks (호안블록용 박테리아 기반 악취저감 키트의 악취제거 성능평가)

  • Keun-Hyoek Yang;Ju-Hyun Mun;Ki-Tae Jeong;Hyun-Sub Yoon;Jae-Il Sim
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.12 no.2
    • /
    • pp.229-238
    • /
    • 2024
  • This study evaluated the odor removal performance of a bacteria-based odor reduction kit. The bacteria used were Rhodobacter capsulatus, Paracoccus limosus, and Brevibacterium hankyongi, which can remove ammonia (NH3), hydrogen sulfide (H2S), total nitrogen (T-P), and total phosphorus (T-N), which are odor pollutants. The materials used were bacteria and porous aggregates (expanded vermiculite, zeolite beads, activated carbon), and the combination of the materials varied depending on the removal mechanism. Materials with a physical adsorption mechanism (zeolite beads and activated carbon) gradually slowed down the concentration reduction rate of odor pollutants (NH3, H2S, T-P, and T-N), and had no further effect on reducing the concentration of odor pollutants after 60 hours. Expanded vermiculite, in which bacteria that remove odors through a bio-adsorption mechanism were immobilized, had a continuous decrease in concentration, and the concentration of odor pollutants reached 0 ppm after 108 hours. As a result, the odor removal performance of materials with physical adsorption mechanisms in actual river water did not meet the odor emission standard required by the Ministry of Environment, while the expanded vermiculite immobilized with bacteria satisfied the odor emission permissible standard and achieved water quality grade 1.