조적공사에서의 작업 지연 요소 도출 및 개선 시스템 제안 (Delay Factor Analysis and Process Enhancement System Development Focusing on Masonry Work)

  • 박민하;이혜린;고용호;한승우
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2015년도 춘계 학술논문 발표대회
    • /
    • pp.119-120
    • /
    • 2015
  • Appropriate management of the finish works in construction project is one of most important activities that must be conducted considering the total duration of the project. Masonry work is a fundamental process that is performed in the preliminary steps of finish works. However, it has been investigated that the analysis of delay factors affecting masonry work has been neglected in the domestic construction site. Therefore, this study deducts delay factors affecting masonry work by literature review and survey on site engineers and labors. This study has been conducted as a preliminary step of developing a construction project interference management system which is expected to suggest objective information for the decision making in construction sites.

  • PDF

AN AUSTRALIAN PERSPECTIVE OF THE SUITABILITY OF THE SCL PROTOCOL'S PROVISIONS FOR DEALING WITH FLOAT FOR ADOPTION AND USE BY THE AUSTRALIAN CONSTRUCTION INDUSTRY

  • Peter Ward
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.340-349
    • /
    • 2011
  • During the negotiation and resolution of delay and disruption disputes on construction projects, the use and misappropriation of float, and the question of float ownership, are considered to be a major concern to those involved. Most practitioners and authors are of the opinion that it is an issue that should be clearly defined and addressed within the provisions of the contract. However, the terms "float" or "ownership of float" are rarely mentioned (if at all) in most of the standard forms of Australian construction contracts, giving little guidance to those involved as to how this issue should be addressed. In October 2002 the United Kingdoms Society of Construction Law (SCL) published a Delay and Disruption Protocol (the Protocol) that contains a suggested approach to the issue. The aim of this research was to obtain an Australian opinion of the suitability of the SCL's Delay and Disruption Protocols suggested approach to the issue of float and ownership of float for use by the Australian construction industry. Qualitative interviews were carried out with Australian construction industry experts experienced in the administration, negotiation, and resolution of delay and disruption disputes to obtain their opinions of the suitability of the SCL's proposed approach. Results indicate general confusion and uncertainty as to how the issue of float and float ownership should be addressed in general, with the SCL's approach adding further to that confusion.

  • PDF

CONSTRUCTION SCHEDULE DELAY RISK ASSESSMENT BY USING COMBINED AHP-RII METHODOLOGY FOR AN INTERNATIONAL NPP PROJECT

  • HOSSEN, MUHAMMED MUFAZZAL;KANG, SUNKOO;KIM, JONGHYUN
    • Nuclear Engineering and Technology
    • /
    • 제47권3호
    • /
    • pp.362-379
    • /
    • 2015
  • In this study, Nuclear Power Plant (NPP) construction schedule delay risk assessment methodology is developed and the construction delay risk is assessed for turnkey international NPP projects. Three levels of delay factors were selected through literature review and discussions with nuclear industry experts. A questionnaire survey was conducted on the basis of an analytic hierarchy process (AHP) and Relative Importance Index (RII) methods and the schedule delay risk is assessed qualitatively and quantitatively by severity and frequency of occurrence of delay factors. This study assigns four main delay factors to the first level: main contractor, utility, regulatory authority, and financial and country factor. The second and the third levels are designed with 12 sub-factors and 32 sub-sub-factors, respectively. This study finds the top five most important sub-sub-factors, which are as follows: policy changes, political instability and public intervention; uncompromising regulatory criteria and licensing documents conflicting with existing regulations; robust design document review procedures; redesign due to errors in design and design changes; and worldwide shortage of qualified and experienced nuclear specific equipment manufacturers. The proposed combined AHP-RII methodology is capable of assessing delay risk effectively and efficiently. Decision makers can apply risk informed decision making to avoid unexpected construction delays of NPPs.

도로 공사중의 교통영향권역 설정 및 적용성에 관한 연구 (A Study on the Traffic Effect Zone and Application of Road Occupying Construction)

  • 이주호;이영우;임채문
    • 한국산업융합학회 논문집
    • /
    • 제6권2호
    • /
    • pp.131-139
    • /
    • 2003
  • The links operating interrupted flow are intend to yield the traffic between the out flow and inflow part effect zone of street section, we build the delay model using the time gap between under construction and not. We review the applicability of interrupted flow, and thus we can put this data to practical use as the basis data to compute the inducement charge for traffic delay. Also building about traffic effect zone of interrupted flow wouldn't produce at the section beside occupying roads and construction cross section, thus we must review the plan to minimize traffic delay by the construction occupying road. In future there must be advanced the incomplete in this study, and groping for the various alternatives to minimize the traffic delay by the road occupying construction, with developing the various sets of detailed analyzing models, that is analysis on the street strength, crossroads geometrical forms of crossroads, public traffics, pedestrians, occupying types.

  • PDF

계획공정표, 모든 지연을 포함한 준공공정표, 발주자 지연을 제외한 준공공정표의 비교를 통한 공기지연분석 (A Delay Analysis based on the Comparison of the As-planned Schedule, As-built Schedule including All Delays and As-built Schedule absent Owner Delays)

  • 윤철성;주해금;김선규
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2003년도 학술대회지
    • /
    • pp.426-429
    • /
    • 2003
  • 건설공사는 프로젝트의 진행 중 내${\cdot}$외부의 여러 조건의 변경이나 사회적 요구에 따라 초기의 계약과는 다른 많은 변경사항이 발생하게 된다. 이러한 변경사항은 프로젝트 추진과정에서 많은 영향을 미치게 되며, 이로 인하여 발생되는 영향은 대부분 프로젝트의 공기지연으로 나타나게 된다. 건설공사에서 발생하는 공기 지연은 기본적으로 도급자의 면책여부에 따라 공기연장이나 지체상금의 부과 등의 결과로 나타나게 되는데 이러한 사항에 대한 발주자와 도급자의 의견이 대립될 경우 클레임으로 발전하게 된다. 클레임에서 가장 중요한 사항은 공기지연일수의 산정으로서 이는 공기지연 클레임에서 가장 중요한 부분이라고 할 수 있다. 본 연구에서는 공기지연 클레임에서 가장 중요한 자료가 되는 공기지연일수 산정방법의 한 방법으로 계약 초기에 작성된 계획공정표(As-Planned Schedule)와 모든 지연이 포함된 준공공정표(As-Built Schedule including all delays) 그리고 발주자 지연이 제외된 준공공정표(As-Built schedule absent owner delays)를 비교함으로써 각 계약 구성원의 귀책으로 인한 광기 지연일수 산정방법을 제시하고자 한다.

  • PDF

An Integrated Expert Model for Delay Management in Construction Projects

  • jalal, Majid Parchami;Yousefi, Elham
    • Journal of Construction Engineering and Project Management
    • /
    • 제7권3호
    • /
    • pp.1-14
    • /
    • 2017
  • Delay claim should actually be supported by a set of proper information so that the contractors could prove their validity. The so-called information should be able to clarify the relationship between delay events and how they impact on the whole project. Therefore, exploiting an integrated system by people who are involved in construction business would certainly prove helpful. In the present study, delay analysis methods have been investigated along with selecting a relatively comprehensive method which has been modified, and eventually, a novel model and its required modules have been proposed for evaluating delay claims. The suggested integrated model is formed to identify delayed events, to classify delays, to measure the impacts of delays on the project scheduling, and finally to estimate the damages which were caused by those so-called delays. A decision support system (DSS) model which is related to the integrated system is actually extracted from Iran's general contract conditions, that is, 4311 magazine (equivalent to red FIDIC book). It is then programmed and coded by C# program. This DSS model can be used as an input of Easy Plan program. In addition, at the end of this research, the coded DSS has been used along with the so-called program so that a modified and developed model could be generated.

Evaluation of the Effect of Project Delay on Future Benefits in the Nepal Highway Infrastructure Construction Sector

  • Chhabi Lal PAUDEL;Michael HENRY
    • 국제학술발표논문집
    • /
    • The 10th International Conference on Construction Engineering and Project Management
    • /
    • pp.137-144
    • /
    • 2024
  • Public infrastructure projects are implemented to achieve targeted economic development of nations. However, due to the delayed execution of projects, the investment cost of the project increases in proportion to time overrun. The increased investment cost for the defined scope of project may have an effect on the achievement of planned future benefits, but the effect of delay on the loss of estimated benefits is not well explored. The primary objective of this research is to assess the effect of delayed execution of road and bridge construction projects on the estimated future benefits. Furthermore, the relationship between delay and the percentage loss of future benefits is modeled using the linear regression analysis. The data consists of 395 road and 248 bridge construction contracts under the Department of Roads, Nepal. The statistical analysis of road and bridge construction contracts showed that there is a reduction in estimated benefits in future years due to the effect of delay. The relationship between the percentage loss of estimated benefit and delay period in months was found to be significant for both road and bridge contracts. The results show that delay not only affects the short-term cost overrun but also the achievement of estimated future benefits. This research thus contributes valuable insights into the understanding of the impact of project delays on both cost overruns and the loss of estimated future benefits. Furthermore, this research has practical implications for policymakers, private sector investors, and financing agencies involved in infrastructure development projects.

공동주택의 공기지연 원인분석 사레 연구 (A Case Study on Reason Analysis for Schedule Delay of Apartment House)

  • 박창욱;윤석헌
    • 한국건축시공학회지
    • /
    • 제9권1호
    • /
    • pp.89-94
    • /
    • 2009
  • A study was performed the analysis for the schedule delay of the public housing. To perform this study, the first study existing research literature on the cause of the schedule delay was considered. The based on existing study, this study selected the cause of schedule delay. For check of the schedule delay, this study was compared the monthly schedule and the work diary. Survey was conducted for using the selected cause of schedule delay. And the importance was calculated for using the AHP method. In a case site, the cause of the schedule delay was analyzed. The last, the delay cause was presented the map of cause of effect the based on the delay cause of a case site.

Construction Delay Analysis Using Daily Work Report Data for Short Construction Seasons

  • Jamal, Md Shah;Abdelaty, Ahmed;Shrestha, K. Joseph
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.616-623
    • /
    • 2022
  • Some regions and states, such as Wyoming, have harsh weather conditions, forcing most transportation projects to be completed under tight schedules. However, construction projects are not only delayed by weather conditions, but also delayed by other factors such as contractor's competency, resource availability, coordination issues, and safety. Also, the construction method, geographical location of the projects, and inability to follow baseline schedules accurately due to the contractor's resource allocation are also reasons for the delay. This paper discusses the main reasons for the delay in the public transportation projects based on Daily Work Reports (DWRs) from five different transportation projects of the last three years in Wyoming. This paper focuses on the inconsistencies of the contractor's schedules to complete the project according to the baseline schedule. First, the authors collected DWRs and baseline schedules from the Wyoming Department of Transportation (WYDOT). Second, the DWR data are compared against the baseline schedules to determine the reasons for delaying their significance. Finally, the paper presents the recommendations to mitigate the effects of delays on public transportation projects as well as to improve the documentation process of DWR data.

  • PDF

건설공사의 작업지연 원인분석방법 (THE ROOT CAUSE ANALYSIS METHOD FOR SCHEDULE DELAY IN CONSTRUCTION)

  • 지근창;유정호;김창덕
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2006년도 정기학술발표대회 논문집
    • /
    • pp.131-136
    • /
    • 2006
  • 작업의 지연을 줄이거나 예방하기 위해서는 작업지연상황을 지속적으로 확인하여 작업지연을 야기하는 원인을 찾아내고 대책을 세워야 한다. 건설 프로젝트는 동일한 조건하에서도 주변 환경에 따라 결과 값이 다르게 나타나는 일회성이 강한 분야 중에 하나이다. 그래서 지금까지 이루어진 선행연구들은 작업지연기간 산정방법 또는 작업지연의 클레임 사례에 관한 연구와 프로젝트 종료 후 결과에 의한 원인을 제시한 것이 대부분이다. 따라서 공사 진행 중에 발생하는 작업지연에 대해 체계적으로 활용할 수 있는 분석방법과 절차가 필요하다. 본 연구는 작업지연 원인분석 범위를 프로젝트내의 현장관리 분야로 국한하고 작업의 투입요소에 의한 분석과 VSM을 활용한 분석으로 나눴다. 건설업에 적합한 원인분석 방법을 제안하기 위해 기존에 활용되고 있는 분석방법의 특징을 분석하고 건설업의 특징을 분석하여 건설업에 활용이 적합한 방법을 도출하고 절차를 제안하였다.

  • PDF