• Title/Summary/Keyword: Construction delay

Search Result 629, Processing Time 0.028 seconds

A Study on the Blasting Vibration Characteristics of Geomunoreum Lava Tubes System, Jeju Island (제주 거문오름 용암동굴계에 영향을 미치는 발파진동특성에 대한 연구)

  • Song, Jae-Yong;Lee, Geun-Chun;Ahn, Ung-San;Lim, Hyun-Muk;Moon, Seong-Woo;Seo, Yong-Seok
    • The Journal of Engineering Geology
    • /
    • v.31 no.1
    • /
    • pp.103-118
    • /
    • 2021
  • For management and preservation measures of lava tube, it is studied how the blasting vibration by constructions near Geomunoreum lava tubes in Jeju affect lava tube. 11 boreholes were drilled in study area, and in-situ blasting tests were conducted by changing from 0.5 kg to 10 kg charge per delay in those boreholes. The vibration velocity, which meets the regulatory vibration criterion during daytime, was estimated as below 0.276 cm/sec by analyzing the relationship between vibration velocity and vibration level. In addition, SRE and CRE were calculated from the results of in-situ blasting tests, and k-values were shown as 130.04 in SRE, 199.71 in CRE, respectively. Also, n-values were shown as -1.717 in SRE, -1.711 in CRE, respectively. Charge per delay were assessed based on these equations, and charges per delay had ranges of 0.57~7.42 kg/delay in estimation equation of vibration velocity, 0.21~5.29 kg/delay in SRE, and 0.04~5.51 kg/delay in CRE, considering the 0.2 kine vibration criterion for cultural heritage and the 20~100 m distance from vibration source. Additionally, the relationships which meet the criteria of 0.2 kine, were calculated by combining CRE in this study with the result of previous study. Allowable charges per delay, which meet the criteria of 0.2 kine, were evaluated as 1.07 kg/delay in 50 m, 5.13 kg/delay in 100 m and 22.26 kg/delay in 200 m distances. These relationships for each vibration velocity are useful to deduce charge per delay for the ground near Geomunoreum lava tube.

Stakeholders' Perception of the Causes and Effects of Construction Delays on Project Delivery

  • Akinsiku, Olusegun Emmanuel;Akinsulire, Akintunde
    • Journal of Construction Engineering and Project Management
    • /
    • v.2 no.4
    • /
    • pp.25-31
    • /
    • 2012
  • The growing rate of delays is adversely affecting the timely delivery of construction projects. This study therefore assesses construction stakeholders' perception of the causes of delays and its effects on project delivery in a bid to proffer solution in minimizing the occurrences of delays. Questionnaire was used to elicit responses from construction stakeholders; a total of thirty three causes of delays, seventeen resultant effects of delays and fifteen methods of minimizing construction delays were identified for the study based on literature reviews. The results suggest that client's cash flow related problems are the main causes of delays while time and cost overruns are the major identifiable effects of delays in construction projects. However, adequate project planning and budgeting were suggested as possible ways of minimizing the occurrences of delays.

Development of Process Management Manual for Quality Improvement of Green Building (그린빌딩의 품질향상을 위한 공정관리매뉴얼 개발)

  • Kim, Dae-Geon;Hwang, Hyun-Jun;Ryu, Kyoung-Gu
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.245-246
    • /
    • 2013
  • The construction of green building has distinct charicteristics by work classification by applying green technologies. Thus if the new technologies are applied to construction, unskiiled worker can experience construction time delay, reconstruction occurrence and quality decrease because of mistakes during the construction and work progress. For this background, we establish the work progress manual to secure quality and performance during the construction phase of green building and provide method to be used in the construction sight operation.

  • PDF

CONFIGURATION METHOD OF HEALTH & SAFETY RULE FOR IMPROVING PRODUCTIVITY IN CONSTRUCTION SPACE BY MULTI-DIMENSION CAD SYSTEM

  • Hyoun-Seok Moon;Leen-Seok Kang;Nashwan Dawood;Sang-Bok, Ji
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1161-1165
    • /
    • 2009
  • Safety of workers and productivity in construction site are affected according to the conflict status of work spaces which are performed at a time. The interference among the work spaces in construction site should be minimized because it becomes a blocking factor that causes construction delay and low productivity. Those factors can be managed by reasonable H&S (Health & Safety) practice. This research suggests the requirements of H&S practice and rules to establish the strategy of H&S management based on the literature reviews related to H&S rule. The suggested H&S rule can be visualized for searching space conflict point if the rule is linked with visual simulation tool. Accordingly the research results can be used for improving and visualizing construction productivity by work space control in 4D/nD CAD system.

  • PDF

Analyzing Characteristics of Construction Complaints with Construction Project Type

  • Lee, Ju-Hui;Lee, Changjun;Yun, Sungmin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.3
    • /
    • pp.52-61
    • /
    • 2023
  • Conflicts in a construction project not only make negative impacts on project performance such as schedule delay or cost overrun but also require social cost to resolve the conflicts. Although the conflict needs a preemptive management because a conflict usually begins with a complaint, existing studies have focused on conflict resolution after it occurs. This study identifies and categorizes complaints which mainly appear in the construction projects. Those complaints were evaluated and quantified in terms of occurrence frequency and potential to conflict through a questionnaire survey with industry experts. Using the survey results, this study examines the characteristic of complaints in linear project and clustered project, and analyzes what kind of complaints occur by project type. As the results, this study derives the complaints with high potential to the conflicts that should be managed first during managing a construction project in each project type.

Development of Work Breakdown Structure and Analysis of Precedence Relations by Activity in School Facilities Construction Work (학교시설 건설공사의 작업분류체계 구축 및 단위작업별 선후행 관계 분석)

  • Bang, Jong-Dae;Sohn, Jeong-Rak
    • Land and Housing Review
    • /
    • v.8 no.3
    • /
    • pp.189-200
    • /
    • 2017
  • The work breakdown structure and the precedence relations by work activity are very important because they are the basic data for estimating the construction duration in the construction work. However, there is no standard to accurately estimate the construction duration since the size of the school facilities construction is smaller than the general construction work. Therefore, some schools are unable to open in March or September and the delay of the construction duration can cause damage to the students. To solve this problem, this study developed a work breakdown structure of school facilities construction work and analyzed the precedence relations by work activities. The work breakdown structure of the school facilities construction is composed of three steps. The operations corresponding to level 1 and level 2 are as follows. (1) 2 preparatory work categories; preparation period and temporary construction. (2) 17 architectural work categories; temporary construction, foundation & pile work, reinforced concrete work, steel roof work, brick work, plaster work, tile work, stone work, waterproof construction, wood work, interior construction, floor work, metal work, roof work, windows construction, glazing work and paint construction. (3) 7 mechanic and fire work categories; outside trunk line work, plumbing work, air-conditioning equipment work, machine room work, city gas plumbing work, sanitation facilities and inspection & test working. (4) 4 civil work categories; wastewater work, drainage work, pavement work and other work. (5) 1 landscaping work categories; planting work. The work breakdown structure was derived from interviews with experts based on the milestones and detailed statements of existing school facilities. The analysis of precedence relations by school facilities work activity utilized PDM(Precedence Diagramming Method)which does not need a dummy and the relations were applied using FS(Finish to Start), FF(Finish to Finish), SS(Start to Start), SF(Start to Finish). The analysis of this study shows that if one work activity is delayed, the entire construction duration may be delayed because the majority of the works are FS relations. Therefore, it is necessary to use the Lag at the appropriate time to estimate the standard construction duration of the school facility construction. Lag is a term used only in the PDM method and it is used to define the relationship between the predecessor and the successor in creating the network milestone. And it means the delay time applied to the two work activities. The results of this study can reasonably estimate the standard construction duration of school facilities and it will contribute to the quality of the school facilities construction.

A Lifetime-Preserving and Delay-Constrained Data Gathering Tree for Unreliable Sensor Networks

  • Li, Yanjun;Shen, Yueyun;Chi, Kaikai
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.6 no.12
    • /
    • pp.3219-3236
    • /
    • 2012
  • A tree routing structure is often adopted for many-to-one data gathering and aggregation in sensor networks. For real-time scenarios, considering lossy wireless links, it is an important issue how to construct a maximum-lifetime data gathering tree with delay constraint. In this work, we study the problem of lifetime-preserving and delay-constrained tree construction in unreliable sensor networks. We prove that the problem is NP-complete. A greedy approximation algorithm is proposed. We use expected transmissions count (ETX) as the link quality indicator, as well as a measure of delay. Our algorithm starts from an arbitrary least ETX tree, and iteratively adjusts the hierarchy of the tree to reduce the load on bottleneck nodes by pruning and grafting its sub-tree. The complexity of the proposed algorithm is $O(N^4)$. Finally, extensive simulations are carried out to verify our approach. Simulation results show that our algorithm provides longer lifetime in various situations compared to existing data gathering schemes.

The Development and Application of Low Vibration Explosives(NewFINECKER) (미진동 화약(NewFINECKER) 개발 및 현장 적용에 관한 연구)

  • Park, Yun-Seok;Jeong, Min-Su
    • Explosives and Blasting
    • /
    • v.28 no.1
    • /
    • pp.11-18
    • /
    • 2010
  • This study improved construction and cost efficiency that are disadvantages of existing low vibration crackers(low vibration cracker, plasma, etc) and introduced cases of development and practical applications of Low vibration explosives(NewFINECKER) that minimizes blast vibration. The low vibration explosives(NewFINECKER) is suitable to Type-1 among standard blasting patterns of Ministry of Land, Transport and Maritime Affairs(MLTM) and delay blasting is possible. Moreover, the low vibration explosives improve construction and work efficiency while the level of vibration is shown to be about 60~70% of normal emulsion explosives. Additionally, this study suggested standard blasting patterns, the prediction equation of blasting vibration, and construction methods.

An Experimental Study for Cement Setting Property of Wood Chip Board Using Construction Waste Wood (건설폐목을 이용한 목질계보드의 시멘트응결 특성에 관한 실험적 연구)

  • Kim, Sae Hoan;Oh, Sae Chool
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.3 no.1
    • /
    • pp.80-86
    • /
    • 2007
  • In this study we experimented setting time and basic properties as waste wood fiber and sodium silicate substitution rate to reuse waste wood fiber produced in construction field to wood chip board. To do this construction waste woods were crushed with the size less than 10mm, mixed with the rate of 1:2, 2.5, 3, and added sodium silicate with the rate of 0, 5% of cement content. The results are as follows. As the substitution rate of construction waste wood was increased delay of setting time was also increased, and the batch of adding 5% accelerator had a 13~17 hours faster setting time than non accelerator batch. The compressive strength was lower as wood substitution rate was higher, and as the specific gravity was higher, the strength was also higher. As wood substitution rate was higher, heat conductivity was lower, and as specific gravity was higher, heat conductivity also was higher.

  • PDF

A Study on Design Additional Fee Estimation by Change Order - Focused on Design Stage - (설계변경에 따른 설계추가용역비 산정에 관한 연구 - 설계단계 중심으로 -)

  • Park, Won-Ho;Paek, Joon-Hong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05b
    • /
    • pp.155-158
    • /
    • 2009
  • During the construction project period, a lot of change orders happen in the design and construction stage Especially, The change order during construction stage causes the huge construction cost increase and duration delay. Accordingly, research on the change order of the construction stage is being progressed relatively active in the design stage, but the design changes are rarely made. In the design stage, the owner has to pay a design addition cost when change order due to the demands of owner happens. However Korea has not the specific standard about design additional cost in design stage. Therefore, this study analyzes problems of design additional cost estimation methods through the case study, and then indicates the method that the ratio distributes to details dividing design tasks and the method of the PM(Project Management). Eventually, this study expects to minimize claim related the design additional cost in design stage.

  • PDF