• Title/Summary/Keyword: Construction delay

Search Result 629, Processing Time 0.032 seconds

Quantity Management Model for Manufacturing and Assembly of Large-scale Modular Construction Projects during Construction Phase (대규모 모듈러 건축 프로젝트 현장 시공 시 공장 생산량 및 현장 시공량 관리 모델)

  • Choi, Onekyu;Lee, Hyunsoo;Park, Moonseo;Hyun, Hosang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.1
    • /
    • pp.43-53
    • /
    • 2018
  • Modular construction can improve construction quality and accuracy through manufacturing process, and it allow massive production and cost savings by repeatedly producing the same unit. In particular, it is possible to reduce the time because the on-site work and the manufacturing process can be carried out at simultaneously. However, according to the modular construction project survey report, there is no significant difference regarding the average construction period between modular construction and conventional construction. This is due to schedule delay problems that occur during construction phase. Therefore, it is necessary to select alternatives to prevent schedule delay during on-site construction progressing. Especially, in case of large-scale modular construction project, on-site module assembly and manufacturing process are performed concurrently. Hence, identification of alternatives should be done at the co-occurrence by taking both manufacturing and on-site work process in to account. In this research, the management factors of large-scale modular construction project were identified through the IDEF0 modeling, and the quantity management model for manufacturing and assembly is developed. This will reduce the schedule delay problem that occurs in the progression on-site work of a large scale modular construction.

Robust Delay-dependent Stability Criterion for Uncertain Networked Control System (불확실성이 존재하는 네트워크 제어시스템의 강인 지연의존 안정성 판별법)

  • Park, Myeongjin;Kwon, Ohmin;Park, Ju H.
    • IEMEK Journal of Embedded Systems and Applications
    • /
    • v.4 no.2
    • /
    • pp.97-102
    • /
    • 2009
  • In this paper, the problem of stability analysis for networked control systems with norm-bounded parameter uncertainties is investigated. By construction Lyapunov's functional, a new delay-dependent stability criterion for uncertain networked control system is established in terms of LMIs (linear matrix inequalities) which can be easily by various convex optimization algorithms. One numerical example is included to show the effectiveness of proposed criterion.

  • PDF

Construction of a robust tracking system with N-th sampling delay

  • Inooka, Hikaru;Ichirou, Komatsu Ken
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2001.10a
    • /
    • pp.87.5-87
    • /
    • 2001
  • In the past, we presented the tracking system with one sampling delay. In this paper, first we propose a tracking system with N-th sampling delay, in the case where an input-output pulse transfer function of a plant Z$\_$-N/. Secondly we propose a system configuration converting an input-output pulse transfer function of a plant into Z$\_$-N/ with the inverse system of the plant. Moreover, the proposed tracking system configuration is applied to an actual Ball and Beam system and good results are obtained.

  • PDF

A Study on the Analysis of Delay Claim Risk in Apartment Housing Projects (공동주택공사에서의 공기지연 리스크분석에 관한 연구)

  • Kim Jae-Wook;Woo Kwang-Min;Lee Hak-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.217-221
    • /
    • 2003
  • This study proposes a new classification system and analysis methodology for time delay risk of apartment projects. And this study proposes the classification of major trades and risk level and risk index by performing expert-oriented interview and survey report on a national scale. The purpose of this study is to present basic data for time delay risk management system through the analysis of risk level, risk index and rank of major 5 trades(earth work, structure work, masonry work, window and door/glass work, and interior finish work) in apartment projects.

  • PDF

Overlay Multicast Tree Construction Algorithm for Synchronized Real-time Media Multicast Service over the Internet (동기화된 실시간 미디어 멀티캐스트 서비스에 적합한 오버레이 멀티캐스트 트리 구성 알고리즘)

  • Joo, Hyun-Chul;Song, Hwang-Jun
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.31 no.11A
    • /
    • pp.1037-1043
    • /
    • 2006
  • This work presents an effective overlay multicast tree construction algorithm for synchronized real-time media multicast service over the Internet. The proposed algorithm is designed to minimize delay variance among group members to provide the synchronized service as well as average delay of group members in order to support the service in real-time. Basically, of orthogonal genetic algorithm is employed to obtain the near optimal tree with a low computational complexity since the given problem is NP-complete. Finally, experimental results are provided to show the superior performance of the proposed algorithm.

A P2P Overlay Multicast Tree Construction Algorithm Considering Peer Stability and Delay (피어의 안정성과 지연을 동시에 고려한 P2P 오버레이 멀티캐스트 트리 구성 알고리즘)

  • Kwon, Oh-Chan;Yoon, Chang-Woo;Song, Hwang-Jun
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.36 no.4B
    • /
    • pp.305-313
    • /
    • 2011
  • This paper presents a P2P (Peer-to-Peer) overlay multicast tree construction algorithm to support stable multimedia service over the Internet. While constructing a multicast tree, it takes into account not only the link delay, but also peer stability. Since peers actually show dynamic and unstable behavior over P2P-based network, it is essential to consider peer stability. Furthermore, the weighting factor between link delay and peer stability is adaptively controlled according to the characteristics of the multicast tree. Basically, Genetic algorithm is employed to obtain a near optimal solution with low computational complexity. Finally, simulation results are provided to show the performance of the proposed algorithm.

A Study on the Delay Analysis Methodologies in Construction of Korea High Speed Railway (경부고속철도 건설사업의 공기지연분석에 관한 연구)

  • Yun Sung-Min;Lee Sang-Hyun;Chae Myung-Jin;Han Seung-Heon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.250-255
    • /
    • 2004
  • To analyze delay, Seoul - Daegu line of Korea High Speed Railway was divided into three sections and analyzed independently by the business characteristics. The analysis on the project delay reasons was performed on macro and micro scales. This analytic method was named as 'Macro-Micro Delay Analysis Method (MMDAM)'. The macro scale analysis has three approaches, which are (1) scheduling, (3) structural characteristic, (3) and responsibility of project administrative works. Micro analysis also has three, methodologies which are (1) As Planned Method, (2) As Built method, (3) Modified Time Impact Analysis for analyzing the most influential section which the largest delay occurred. Using elicited project delay reasons from above analysis, the questionnaire was carried out for analyzing the influence of project delay reason. The reasons of the delay were driven from two different aspects (1) structural characteristic and (2) responsibility of the people involved in the project. The reasons that were identified from aforementioned three sections are the factors of the delay of the large-scale government driven projects. Finally, the author suggested the methodology of identifying the project delaying factors. The author also analyzed delay reasons in both the overseas and domestic cases of high rapid railway construction and has elicited some benchmarks for the future projects.

  • PDF

Masonry work interference factor deduction based on daily report data analysis (작업일보 데이터를 활용한 조적공사 작업간섭 요소 도출)

  • Park, Min Ha;Lee, Hye Lin;Ko, Yong-Ho;Han, SeungWoo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.11a
    • /
    • pp.172-173
    • /
    • 2015
  • Construction project involves numerous repetitive operations. Especially in high-rise and apartment houses projects, the amount of repetitive operations increase and a preceding operations delay causes serious damage to the total duration of the project. This study deducts work delay factors by site engineer interview and survey. The study analyzes daily report data to deduct crucial processes affecting masonry work which has been investigated to be one of preliminary processes conducted at the beginning of finish work.

  • PDF

An Analysis on Relations between Design Errors Detected during BIM-based Design Validation and the Impacts Using Logistic Regression (로지스틱 회귀분석을 이용한 BIM 설계 검토에 의하여 발견된 설계 오류와 그 영향도간의 관계 분석)

  • Won, Jongsung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.05a
    • /
    • pp.264-265
    • /
    • 2017
  • This paper aims to analyze relations between design errors prevented by building information modeling (BIM)-based design validation and their impacts in order to identify critical consideration factors for successfully implementing BIM-based design validation in the architecture, engineering, and construction (AEC) projects. More than 800 design errors detected by BIM-based design validation in two BIM-based projects in South Korea are categorized according to its causes and work types. The relations between causes and work types of design errors and project delay, cost overrun, low quality, and rework generation that can be caused by the errors are analyzed through conducting logistic regression. Characteristics of each design error are analyzed by conducting face-to-face interviews with practitioners in the two BIM-based projects. As the results, the impacts of design error causes on predicting project delay, cost overrun, low quality, and rework generation were the highest.

  • PDF

Influence of Delay Time on the Ground Vibration (발파공간 지연시차가 지반진동에 미치는 영향)

  • Kim, Ji-Soo;Choi, Tae-Hong;Lee, Chang-Won
    • Explosives and Blasting
    • /
    • v.32 no.2
    • /
    • pp.1-8
    • /
    • 2014
  • In this study, 16 test blastings had been carried out with different spacings, burdens, drilling lengths, and charges per delay for investigating the characteristics of ground vibration propagation, which depends on the delay time. From the tests, it was possible to derive a ground vibration equation. Using the equation, the characteristics of ground vibration could be investigated by analyzing the nomogram and predicting the Peak Particle Velocity (PPV), which are influenced by the delay time and the priming location. The trend of ground vibration change depending on the delay time was analyzed for the standards charges of 0.5, 1.6, 5, and 15 kg, which were suggested in "Blasting design and construction guidelines to road construction" by the Ministry of Land, Infrastructure and Transport. From the study, it would be possible to suggest a favorable vibration control method, which depends on the charge.