• 제목/요약/키워드: Construction delay

Search Result 629, Processing Time 0.03 seconds

CONSTRUCTION COST CLAIMS, OR ENTITLEMENTS?

  • Tan Hock Soon Adrias
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.150-159
    • /
    • 2007
  • More often than not, cost claims which are legitimately due and entitled to the contractor for works done, or for loss and expense incurred arising from disruption, prolongation and delay, are surprising not successfully recovered, whether in whole or in part, or none at all. One of the main reasons attributing to such scenario, is due to either the contractor, employer or the consultants and their poor understanding of and adherence to established and proper contractual rubric that is embodied in the building construction contract for the works. This paper explores some such pitfalls that could very well spell the ultimate financial disaster for many contractors, and highlights salient and essential intimations that contractors and consultants should watch out for.

  • PDF

A Study on the Improvement of Railway Construction Schedule Using KTX Construction Case (경부고속철도 사례분석을 통한 철도건설공기 개선에 관한 연구)

  • Yang, Yeonjong;Chung, Byunghyun
    • Journal of the Korean Society for Railway
    • /
    • v.15 no.6
    • /
    • pp.662-669
    • /
    • 2012
  • In 2004, KTX operated in Korea on the 5th in the world. But there are various factor on planed schedule delay of Big National Construction Project like Seoul-Busan High Speed Rail Project(Seoul-Busan HSR). For example, Often change of government policy, project management control problem of design and construction, conflict of interested party like environmental organization/resident are the main delay factors. The suggestions for improvement of the construction schedule through the Seoul-Busan HSR will help to make a new leap forward in rail construction.

Construction of Delay Predictine Models on Freeway Ramp Junctions with 70mph Speed Limit (70mph 제한속도를 갖는 고속도로 진출입램프 접속부상의 지체예측모형 구축에 관한 연구)

  • 김정훈;김태곤
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 1999.10a
    • /
    • pp.131-140
    • /
    • 1999
  • Today freeway is experiencing a severe congestion with incoming or outgoing traffic through freeway ramps during the peak periods. Thus, the objectives of this study is to identify the traffic characteristics, analyze the relationships between the traffic characteristics and finally construct the delay predictive models on the ramp junctions of freeway with 70mph speed limit. From the traffic analyses, and model constructions and verifications for delay prediction on the ramp junctions of freeway, the following results were obtained: ⅰ) Traffic flow showed a big difference depending on the time periods. Especially, more traffic flows were concentrated on the freeway junctions in the morning peak period when compared with the afternoon peak period. ⅱ) The occupancy also showed a big difference depending on the time periods, and the downstream occupancy(Od) was especially shown to have a higher explanatory power for the delay predictive model construction on the ramp junction of freeway. ⅲ) The speed-occupancy curve showed a remarkable shift based on the occupancies observed ; Od < 9% and Od$\geq$9%. Especially, volume and occupancy were shown to be highly explanatory for delay prediction on the ramp junctions of freeway under Od$\geq$9%, but lowly for delay predicion on the ramp junctions of freeway under Od<9%. Rather, the driver characteristics or transportation conditions around the freeway were through to be a little higher explanatory for the delay perdiction under Od<9%. ⅳ) Integrated delay predictive models showed a higher explanatory power in the morning peak period, but a lower explanatory power in the non-peak periods.

SCHEMATIC APPROACH TO IMPROVE TIME PERFORMANCE OF HIGHWAY CONSTRUCTION CONTRACTS

  • Ralph D. Ellis ;Jae-Ho Pyeon
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.638-642
    • /
    • 2005
  • This paper presents incentive application strategies and delay prevention strategies as schematic approaches to improve time performance of highway construction contracts. This research recognizes the importance of improving time performance during highway construction. Strategic solutions of the most core issues on time performance incentive contracting are identified. The suggested incentive application strategies develop criteria for applying time classification to projects, for assigning project time classifications to contractors and designers, and for determining appropriate incentive values in A (cost) + B (time cost) and other performance incentive contracts. The suggested delay prevention strategies develop criteria for determining the appropriate subsurface utility engineering (SUE) level and to develop best practices for avoiding utility relocation delays. A schematic approach for each strategy is developed. This paper also introduces current incentive contracting practices in Florida. The researchers obtained the information from experienced persons in the highway construction industry, including key highway contractors, designers, and Department of Transportation (DOT) and Federal Highway Administration (FHWA) personnel. The major focus of this research is to develop strategies and suggest approaches to improve time performance of highway construction contracts. For future study, practical tools to facilitate implementation of the suggested strategies should be developed, so that the criteria, implementation processes, and best practices developed may contribute to the current industry-wide effort to improve time performance.

  • PDF

Application of Super Retarding Agent for Integration of Construction Joints (시공줄눈의 일체화를 위한 초지연제의 활용)

  • Hyun, Seung-Yong;Lim, Gun-Su;Jeong, Yeong-Jin;Kim, Jong;Han, Min-Cheol;Han, Cheon-Goo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.11a
    • /
    • pp.15-16
    • /
    • 2022
  • This study is to confirm the integration performance of joints according to the method of applying the super retarding agent. When the super-delay system was applied, the integration performance was found to decrease somewhat on the 7th day of age. In the case of the 28th of age, it was found that the integration performance is improved. When a diluent is injected and a super delay agent is sprayed, shear bond strength is the highest.

  • PDF

Apportionment of Liquidated Damages and Compensation for Delay Damages in Domestic Construction Project : Analysis and Improvement (국내 현행 공기지연 책임에 따른 지체상금 및 손실보상의 문제점 및 개선방안)

  • Kim, Kyong Ju;Kim, Kyoungmin;Kim, Jong Inn;Wei, Ameng;Kim, Eu Wang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.1
    • /
    • pp.12-20
    • /
    • 2023
  • To calculate the amount of owner-caused and contractor-caused delays based on a simplified delay analysis, which has been customarily used in Korea, has a limitation in reflecting the impact of the concurrent delay and the acceleration work. It also resulted in the apportionment of liquidated damages by applying the ratio of the number of delays between the owner and the contractor. This study analyzes that the conventional method does not meet the international standards. In order to improve the problem of construction delay analysis and the apportionment of liquidated damages based on it, owner delays, contractor delays, concurrent delays, and the impact of acceleration should be analyzed together. This study suggests that in the apportionment of liquidated damages, the extension of time should be extended by the sum of concurrent delays and the owner-caused delays, and liquidated damages should be imposed on delays incurred after the extension of time. It can be seen that it conforms to the international standards. The results of this study are expected to contribute to improving the problems of delay analysis and liquidated damages calculation, which have been conventionally accepted.

A switching-based delay optimal aggregation tree construction: An algorithm design (에이전트 시스템 개발도구에 관한 연구)

  • Nguyen, Dung T.;Yeom, Sanggil;Choo, Hyunseung
    • Annual Conference of KIPS
    • /
    • 2017.04a
    • /
    • pp.677-679
    • /
    • 2017
  • Data convergecast is an indispensable task for any WSN applications. Typically, scheduling in the WSN consists of two phases: tree construction and scheduling. The optimal tree structure and scheduling for the network is proven NP-hard. This paper focuses on the delay optimality while constructing the data convergecast tree. The algorithm can take any tree as the input, and by performing the switches (i.e. a node changes its parent), the expected aggregation delay is potentially reduced. Note that while constructing the tree, only the in-tree collisions between the child nodes sending data to their common parent is considered.

Risk Factors Influencing the Delays on the Remodeling Construction Works - Focused on Office Building Projects - (리모델링 공사의 공기지연을 야기하는 리스크 요인 - 오피스 건축물을 중심으로 -)

  • Cho, Kyu-Man;Kim, Tae-Hoo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.18 no.4
    • /
    • pp.385-394
    • /
    • 2018
  • There have been frequent reports of schedule delays due to various risks of remodeling projects, which are different from new construction. Therefore, this study was carried out to analyze the risk factors inherent in the remodeling project and the likelihood of schedule delay occurrence in the remodeling construction work. To analyze the relationship between the risk factors and the likelihood of schedule delays of remodeling projects, (1) a prototype of the office building remodeling work was developed through the analysis of existing case and literature, (2) a questionnaire survey was conducted on 29 construction managers who have been or are currently conducting remodeling projects, and (3) after evaluating the reliability of the collected questionnaire results, the relationship between the two elements, which denotes (i) likelihood of schedule delays per each work, (ii) importance of risk factors, and (iii) risk factors affecting schedule delay in remodeling work, was suggested. Using the results of this study, it is expected to develop a plan for preventing the schedule delay of the office building remodeling work through control the risk factors that may cause schedule delays.

A Study on Estimation Model of Construction Duration for Public Construction (공공건설공사 공사기간 산정모델에 관한 연구)

  • Kim, Byeong-Soo;Chun, Jin-Ku
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.6 s.28
    • /
    • pp.142-151
    • /
    • 2005
  • On public constructions, that the first planed projects delay than the scheduled completion day occurrence frequently because gap between the scheduled construction durations and the actual construction durations. These facts connect with not only problems of the construction during as the construction delay but also brought about the distribution costs increase as the failure of facility use plan and the people discomfort weight, failure of the production and the supply using facility then tremendous loss of each part etc. For reduce these loss, it must improve accuracy of the scheduled construction duration estimating when it order. This study try contribute to a successful manage of public project and reduce the construction duration extension frequent of the construction during, and then ensure the suitable construction duration by present the estimation model of the scheduled construction duration that include the construction duration correct element using as an index on the scheduled construction duration estimation.