• Title/Summary/Keyword: Construction Variation

검색결과 1,260건 처리시간 0.022초

LEAN CONSTRUCTION MEANS TO PROMOTE GOOD- AND ERADICATE BAD VARIATION

  • Iris D. Tommelein
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.51-59
    • /
    • 2009
  • Lean construction researchers and practitioners have established a new paradigm for managing construction projects. This paradigm stems from insights gained by viewing project delivery as one kind of production and, inspired by the success of the Toyota Production System, leveraging Toyota's 'lean thinking' in the context of such one-of production. Premises of lean construction are that (1) production systems are riddled with variation, (2) variation can be good or bad, but most of it is bad, (3) most of this variation-good or bad-is self-inflicted; consequently 'lean' passionately promotes good- and relentlessly eradicates bad variation. This paper surveys a few of many lean construction means to manage variation. Lean thinking encompasses a lot more than thinking about variation, but that is the lens used here through which construction project management is viewed. Pairing these premises with lean variation-management tools may help readers broaden the insights they can gain from reading the lean construction literature.

  • PDF

시공 프로세스에서 발생하는 공사변동 요인 및 네트워크 분석에 관한 연구 (A Study on the Task Variation and Social Network Analysis in the Construction Process)

  • 박유나;이동덕;김재준
    • 한국건설관리학회논문집
    • /
    • 제20권1호
    • /
    • pp.105-113
    • /
    • 2019
  • 하나의 건설 프로젝트에는 다양한 작업들이 상호의존적으로 진행되어 복잡한 프로세스를 이룬다. 한 작업에서 공사변동이 발생하면 추가적으로 다른 작업들도 영향을 받게 되며 신속하게 진행되는 건설현장 특성상 매번 변동에 대한 합의를 도출하기는 매우 어렵다. 이에 본 연구에서는 시공 과정에 발생하는 공사변동에 대한 근본원인을 파악하고 주요 공사변동요인에 해당하는 작업들에 대하여 인접행렬을 구축하여 네트워크 분석을 실시하였다. 이를 통해 작업들 간 관계론적 특성과 구조적 위치를 파악하였다. 이러한 시공 프로세스에서의 작업 네트워크 분석을 통해 복잡한 시공 과정에서의 작업흐름을 안정화 시키고자 하며 공정 계획의 신뢰성과 프로젝트 성과를 향상시키고자 한다.

Variation Determinants in Building Construction: Ghanaian Professionals Perspective

  • Asamaoh, Richard Oduro;Offei-Nyako, Kofi
    • Journal of Construction Engineering and Project Management
    • /
    • 제3권4호
    • /
    • pp.20-25
    • /
    • 2013
  • Variation in construction means modification of design, changes in quality, quantity of work including the alteration of standard of materials or goods to be used in the work and the removal from site any kind of material not in accordance in the contract. In Ghana, Variation order has become major issue in the construction industry. This had resulted in cost overruns, delay and in some contracts dispute, between parties. The aim of this paper was to identify the root causes of variation; effects of variations on projects in Ghana and the means of reducing the impact of variation order. The method of the study involved literature review, primary data collection, interview and closed - ended- questionnaires. Mean Scores Method was used to rank the identified factors causing variation. Analysis Of Variance Test was use to test for the significant difference between means among the professional groups. The study revealed that most causes of variation were change of design by client and inadequate working details. Establishment of oversight project management committee and flow of information were identified as means of controlling variations during project administration.

Development of A Computerized Risk Management System for International EPCS Projects

  • Yoo, Wi Sung;Kim, Woo-young;Sung, Yookyung
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.614-615
    • /
    • 2015
  • In these days, global construction market is speedily increasing and domestic construction companies have a chance of new contracts. In the meantime, international projects have been increasingly forced to cope with potential risks, which seriously impacted achieving the targeted time and cost. In this study, we introduce a computerized risk management system for international EPCS projects, which is constructed on the needs of practitioners and decision makers as an aid to proactively control the potential risks and to monitor continuously their status and variation. The system is called the Project Risk Management System (PRiMS) is useful for furnishing project managers with warning signals as a project is progressing and helpful for producing the total risk score and tracking risk variation.

  • PDF

낙동강유역에서 위성영상을 이용한 보 건설 전후 수온의 계절변화 (Seasonal Variation of Water Temperature Before and After Weir Construction Using Satellite Image in the Nakdong River)

  • 김상우;김해동;임진욱;안지숙
    • 한국환경과학회지
    • /
    • 제24권11호
    • /
    • pp.1417-1430
    • /
    • 2015
  • In this study we were to explore the seasonal variation of water temperature distributions before and after weir construction at Gumi, Chilgok, Gangjung(Goryung), Dalsung in the Nakdong River using Landsat satellite images. Relationship between in-situ water temperature and radiance values of Landsat-5, 7, 8 satellite images showed high correlation. Seasonal variation of water temperature in Nakdong River showed that the fluctuation ranges of water temperature before weir construction were larger than those after weir construction. This indicated that the variation of water temperature is due to the difference of heat storage volume by weir construction and dredging work. In particular, the water temperature after weirs construction in autumn was 4-8 times lower than that before weirs construction. Water temperature after weir construction decreased in spring and summer at the downstream of Gumi weir and Gangjung(Goryung) weir, and the upstream of Dalsung weir. In autumn and winter, the water temperature after weir construction increased in the upstream and downstream of the whole weirs except upstream of Gumi weir. Relationship between water temperature and meteorological elements (air temperature, wind speed, sunshine, radiation) showed high correlation of above 94% in air temperature, and then radiation was high correlation before and after 65%.

주택원가지수 산정모델 작성 사례연구 (Case Study on Development of Residential Building Cost Index Compilation Model)

  • 조훈희;이유섭;강태경
    • 한국건설관리학회논문집
    • /
    • 제4권4호
    • /
    • pp.220-226
    • /
    • 2003
  • 주택원가지수는 주택건설사업에 투입되는 각종 자원들의 물가변동을 단일지수 형태로 표현한 자료로 이를 통하여 주택원가의 가격변동 수준에 대한 적정성을 판단할 수 있다. 본 연구에서는 국내 기초 통계자료에 대한 검토결과를 토대로 주택원가지수를 작성할 수 있는 방법을 검토하고 사례연구를 통하여 주택원가지수를 제시하였다 본 연구에서 제시한 지수를 활용함으로써 주택건설 원가의 변동을 용이하게 파악하며 공사비 실적자료의 활용성 제고를 위한 기반을 제공하고자 한다.

리모델링 사업에 따른 공동주택의 가격변화에 관한 연구 (A Study on the Pattern of Price Variation for the Remodeled Multi-Family Housing)

  • 김재성;조규만;김태훈
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2016년도 춘계 학술논문 발표대회
    • /
    • pp.257-258
    • /
    • 2016
  • Construction of Multi-Family Housing(MFH) was rapidly spread in the 1990s, it has been mostly passed more than 20 years and it is faced to aging time. Remodeling has emerged a major issue in the construction industry as an alternative of improvement and recovery the initial performance of the deteriorated MFH. But, Many decision-makers are struggling to determine whether to conduct a remodeling because of profitability. In this context, this research was conducted as the following steps to achieve this research goal, i) remodeled MFH cases and comparative cases were collected, ii) the price information based on three time frames (i.e., before remodeling, after remodeling, and present) was collected, and iii) the relative price variation of the remodeled cases was analyzed and finally it is revealed that there are four patterns of price variation.

  • PDF

Elimination of environmental temperature effect from the variation of stay cable force based on simple temperature measurements

  • Chen, Chien-Chou;Wu, Wen-Hwa;Liu, Chun-Yan;Lai, Gwolong
    • Smart Structures and Systems
    • /
    • 제19권2호
    • /
    • pp.137-149
    • /
    • 2017
  • Under the interference of the temperature effect, the alternation of cable force due to damages of a cable-stayed bridge could be difficult to distinguish. Considering the convenience and applicability in engineering practice, simple air or cable temperature measurements are adopted in the current study for the exclusion of temperature effect from the variation of cable force. Using the data collected from Ai-Lan Bridge located in central Taiwan, this work applies the ensemble empirical mode decomposition to process the time histories of cable force, air temperature, and cable temperature. It is evidently observed that the cable force and both types of temperature can all be categorized as the daily variation, long-term variation, and high-frequency noise in the order of decreasing weight. Moreover, the correlation analysis conducted for the decomposed variations of all these three quantities undoubtedly indicates that the daily and long-term variations with different time shifts have to be distinguished for accurately evaluating the temperature effect on the variation of cable force. Finally, consistent results in reducing the range of cable force variation after the elimination of temperature effect confirm the validity and stability of the developed method.

합성수지 거푸집 재료성능 검증에 관한 연구 (A Study on the Performance Evaluation of Synthetic Resin Formwork Material)

  • 남경용;김성덕;최석;이영도
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2019년도 춘계 학술논문 발표대회
    • /
    • pp.151-152
    • /
    • 2019
  • This study length variation test, shock test were conducted to evaluate the performance of synthetic resin form. Results of both thermal length variation test and shock test satisfied the KS standards. for length variation test, the result of the horizontal and vertical valuse were -0.1% in average.

  • PDF

린 건설 공정관리이론의 현장적용에 관한 연구 (A Study on Application of Lean Construction Theory in Schedule Management)

  • 정주영;권원;박상준;전재열
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2006년도 정기학술발표대회 논문집
    • /
    • pp.515-518
    • /
    • 2006
  • 건설공사는 매우 다양한 요인들에 의해 영향을 받으며 생산 주체도 공정별로 다양해서 생산과정상에 많은 변이를 내재하고 있다. 그러나 현재의 공정관리는 결과위주의 관리 방식으로 작업의 상호연관성과 변이 발생을 충분히 고려하지 못하고 있어 많은 문제가 발생하고 있다. 린 건설은 현재의 공정관리방식의 한계를 인식하고 있으며 공정계획의 신뢰성 향상, 공정의 안정성 확보 건축 생산의 효용성 증진을 위한 새로운 관리기술로써 평가 되고 있다. 본 연구에서는 린 건설 이론을 기반으로 한 기법들을 실무적용가능성 측면에서 분석하여 VSM 및 TACT를 이용한 공정관리 기법의 현장적용성을 검토하였다.

  • PDF