• Title/Summary/Keyword: Construction Site Workers

Search Result 368, Processing Time 0.019 seconds

Damages of minarets during Erciş and Edremit Earthquakes, 2011 in Turkey

  • Bayraktar, Alemdar;Altunisik, Ahmet Can;Muvafik, Murat
    • Smart Structures and Systems
    • /
    • v.14 no.3
    • /
    • pp.479-499
    • /
    • 2014
  • This paper illustrates the damages of reinforced concrete and masonry minarets during October 23 (Erciş) and November 9 (Edremit), 2011 Van earthquakes in Turkey. Erciş and Edremit are townships located 90km and 18km from Van city center in Turkey, respectively. Ground accelerations and response spectrums for these earthquakes are given in this paper. A total of 63 reinforced concrete and masonry minarets are heavily damaged or collapsed in the city center and villages nearby after both earthquakes. Because of the fact that there is no Turkish standard and specification directly related to design of minarets, nearly all of the constructions are carried out by workers using only their own technical knowledge. So, all of the non-engineering reinforced concrete and masonry minarets completely collapsed or damaged heavily. From the study, it is seen that the damages are due to several reasons such as site effect, location, and length of the fault, reduction in cross section and formation of the discontinuity, use of plain reinforcement steel, use of concrete with insufficient strength, existence of short lap splices and incorrect end hook angle, larger mass and stiffness concentrations on some region, longitudinal reinforcements discontinuity, cracks at the cylindrical body, and damage of spire and end ornament. In addition to these reasons, the two earthquakes hit the minarets within seventeen days, causing progressive damage. So, the existing design and construction practices should be improved to provide sufficient earthquake performance. Also, it is recommended that there should be a safe distance between the minaret and surrounding structures to reduce the loose of life after earthquake.

Artificial Intelligence-based Real-time Risk Estimation Method of Construction Site Workers (인공지능기반 공사현장 작업자의 실시간 위험성 추정 방법)

  • Kang, Sung-Hwan ;Lee, Dong-Yeop;Cheung, Chong-Soo
    • Proceedings of the Korean Society of Disaster Information Conference
    • /
    • 2023.11a
    • /
    • pp.307-308
    • /
    • 2023
  • 본 논문에서는 공사현장 작업자의 실질적 영향을 미치는 요소들을 고려하여 인공지능기반의 실시간 위험성 추정 기법을 개발하였다. 기존 재난안전학 또는 안전공학에서는 위험성평가를 실시하여 강도·빈도에 의하여 위험성을 추정하고 도출된 값을 통해 위험한 정도를 분류하는 경우가 많다. 그러나 대부분의 공사현장에서는 정적인 위험성평가를 통해 해당 유해위험요인을 근거로 형식적인 위험성평가가 이루어지고 있기 때문에 대부분의 사고 후 증빙 자료로만 활용되고 있는 것이 현실이다. 이 위험성평가를 진행하면서 변화하는 환경의 유해위험을 실시간으로 반영할 수 없게 되고, 이는 실질적인 작업자의 안전을 보장해 주지 못하는 문제를 발생시킨다. 이러한 점에서 위험성평가와 더불어 실질적인 안전한 작업장을 만들기 위해서 작업자의 건강정보 및 실시간 공사현장의 영상정보에 기반한 위험성 추정 기법은 실질적 안전사고를 예방하는 방법론 중 하나가 될 수 있다. 작업자의 건강정보는 개개인 맞춤형 건강 데이터에 근거한 해석이 가능하고 실시간 공사현장 영상은 작업 중 발생할 수 있는 돌발상황에 대비하기위해 사용된다. 이러한 위험성 추정 방법은 다양한 공사현장의 위험성 추정 기법으로 사용될 수 있다. 이로 인해 높은 정확도의 위험성 추정 수치를 얻을 수 있으며, 이는 실질적안 안전 예방활동에 있어서 매우 중요하게 작용한다. 위험성 추정 수치 예제를 통하여 본 논문에서 제시된 위험성 추정 방법론이 타당함을 확인하였다. 본 논문에는 기존 위험성평가에 더해 작업자의 건강정보 및 공사현장 실시간 영상정보를 이용하여 실질적인 작업자 안전을 위한 예방 방법을 제시하였다.

  • PDF

A Study on the Safety through Response Analysis Evaluation of Pre-Anxiety Behavior and Risk Sensitivity Images (대응분석을 통한 안전·불안전 행동 및 위험감수성 이미지 평가)

  • Yu Mi Moon
    • Journal of the Society of Disaster Information
    • /
    • v.20 no.3
    • /
    • pp.471-483
    • /
    • 2024
  • Purpose: This study aimed to understand the relationship between risk-sensitive factors and safety and unsafe behavior, and to clarify the relationship between risk-sensitive factors and demographic cha- racteristics through response matching analysis. To this end, a survey was conducted on 501 construc- tion site workers and data were analyzed using the SPSS program. Method: Six factors were derived through frequency analysis, cross-analysis, exploratory factor analysis, and reliability analysis for data purification. Multiple regression analysis and response analysis were conducted. Result: Risk-sensitive sensitivity and avoidance were found to have a significant effect on safety behavior and unsafe behavior, and the relationship was found according to age and occupation. Conclusion: Taken together, it shows that safety behavior is influenced by managing individual risk sensitivity and sensitivity, and properly managing avoidance. Accordingly, it suggests that intervention is necessary to manage risk sensitivity and sensitivity to promote safety behavior and maintain a sustainable safety culture, and to prevent excessive avoidance.

Applying CVM for the Reinvestment Ratio of Development Profits Generated by Renewing Old Industrial Park in Daegu Metropolitan City (CVM 분석을 이용한 개발이익 재투자 비율 설정에 관한 연구: 대구광역시 노후산업단지 재생사업을 중심으로)

  • Shin, Woo-Hwa;Shin, Woo-Jin
    • Land and Housing Review
    • /
    • v.13 no.4
    • /
    • pp.27-44
    • /
    • 2022
  • In December 2019, the Ministry of Land, Infrastructure and Transport announced the revision of the Enforcement Decree of the Industrial sites and Development Act. In this revision, the reinvestment ratio of development profits generated by renewing the old industrial park is delegated to the local government ordinance. According to this announcement, the reinvestment ratio can be adjusted to less than 50% of sales revenue from construction projects and 25% of land sales for non-industrial use depending on local government conditions. This study aims to investigate the policy rationale for the adjusted ratio of reinvestment in development profits and explore how Daegu City can use this policy when revising ordinances in the future. A survey was conducted with a total of 320 experts, including public corporations, public officials, and industrial site workers in the Industrial Complex Committee. We employ contingent value measurement (CVM) based on 262 valid responses. The results showed that 27% of sales from the construction business and 22% of sales from non-industrial land were derived with an appropriate reinvestment ratio. Although the results in this study might not be generalized in other regions, we provide a potential reference for other local governments who are interested in ordinance revisions in the future. Another contribution of this study is to suggest the statistical method to derive the relevant ratio.

Comparative Analysis Study on Accidents Cases of Manned and Unmanned Tower cranes (유·무인 타워크레인의 사고 사례 비교분석 연구)

  • Jeong Kyeongtae;Jo Minje;Kim Hyein;Lee Donghoon
    • Journal of the Korea Institute of Construction Safety
    • /
    • v.6 no.1
    • /
    • pp.27-32
    • /
    • 2024
  • In this study, based on accident cases of manned and unmanned tower cranes, the types and causes of accidents were analyzed and tower crane accident prevention measures were proposed accordingly. As a result, 'lack of communication' was commonly analyzed as the biggest cause of accidents. Therefore, in this study, we investigated domestic and international systems and laws regarding signalmen responsible for communication between tower crane operators and workers and proposed the following three improvement methods. First, the signalman system must be legally and institutionally reestablished. Second, national agencies and private organizations with expertise should create standardized training manuals and distribute them to signalman educators, and create checklists to manage educators. Third, in the case of a site using a tower crane, the employer must mandatorily deploy a signalman with professional qualifications. Lastly, the results of this study are expected to highlight the differences in accident types and causes of manned and unmanned tower cranes and the need for legal and institutional improvement in the signal system.

Analysis of Dose by Items According to Act on Safety Control of Radiation Around Living Environment (생활주변방사선안전관리법 시행에 따른 항목별 선량 분석)

  • Jeong, Cheonsoo;Oh, Hyunji;Lee, Jieun;Jo, Sumin;Park, Sohyun
    • Journal of the Korean Society of Radiology
    • /
    • v.7 no.6
    • /
    • pp.377-381
    • /
    • 2013
  • The study attempted to analyze items presented in Act on safety control of radioactive rays around living environment, which has been recently enacted. The test items have been divided into cosmic rays, cosmic rays, terrestrial radiation, and byproduct, etc., and the selected locations for measurement included an airplane at 8000m in the air, mountainous area at 1000m above sea level, 15m-underground building, construction site, and seashore at 0m altitude. The test showed that, based on cosmic rays, plane at 8000m in the air had 4.91mSv/y of effective dose per year. The mountainous area at 1000m above sea level, which was chosen to measure cosmic rays and terrestrial radiation, was measured 0.35mSv higher than the seashore at 0m in altitude due to the effect of cosmic rays and terrestrial radiation from the greater height above sea level. The construction site, chosen as a location to measure byproduct, showed the highest value among the items with 6.66mSv, which is as 10times high as that of a completed building. The seashore at 0m in altitude had 5.96mSv, and, 15m-underground building, based on terrestrial radiation, was the lowest with 4.91mSv. This suggests that, despite the assumption that terrestrial radiation will have greater effect deeper underground, it did not affect inside the building significantly. This study showed that the items presented in Act on safety control of radioactive rays around living environment were not close to effective dose limit for radiation workers proposed by ICRP. However, they were between 4 and 7 times higher than that for general public. This suggests that there should be continuous research on and attention to Safe Management of Daily Surrounding Radiation Act, which is still at its beginning stage.

Development of 3-Dimensional Rebar Detail Design and Placing Drawing System (3차원 배근설계 및 배근시공도 작성 자동화 시스템 개발)

  • Choi, Hyun-Chul;Lee, Yunjae;Lee, Si Eun;Kim, Chee Kyeong
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.27 no.4
    • /
    • pp.289-296
    • /
    • 2014
  • The rebar detailing is an important work influencing the final performance and quality of RC structures. But it is one of the most irrational and illogical activity in construction site. Many groups of workers, including main contractors, structural engineers, shop drawers, rebar fabricators, and etc., participate in this activity. A loosely-organized process for this activity is apt to produce a big amount of rebar loss or even degraded structures. A 3-dimensional rebar auto-placing system, called as Rebar Hub, has been designed and implemented in this research. Rebar Hub provides a totally integrated service from 3D structural modeling of buildings to rebar auto-placing considering anchorage, splice, and the length of ordered rebar. In addition, Rebar Hub can recognize the 2D drawing CAD files and then build 3D structural models which are used for the start point of 3D rebar auto-placing. After rebar auto-placing, each members of the 3D structural model have rebar information belonging to them. It means that the rebar information can be used for the afterward works such as quantity-survey, manufacturing and fabrication of rebars. Rebar Hub is showing outstanding performance while applying to practical projects. It has almost five times productivity and reduces the rebar loss up to 3~8% of the initially-surveyed amount of rebar.

On-site Investigation of Work Cease Rights Conducted by Employers to Ensure Worker Safety (근로자 안전을 확보하기 위해 실시하는 사업주에 의한 작업중지권 현장 실태조사)

  • Woo Sub Shim;Sang Beam Kim
    • Journal of the Society of Disaster Information
    • /
    • v.19 no.4
    • /
    • pp.806-814
    • /
    • 2023
  • Purpose: According to the Occupational Safety and Health Act of the Ministry of Employment and Labor, in order to prevent industrial accidents, the right to stop work must be exercised in the event of an imminent danger. This study conducted a fact-finding survey on whether employers fulfilled the right to suspend work in the workplace when an imminent danger, such as a typhoon, was encountered. Method: For two days from August 9 to October, when the impact of Typhoon Khanun No. 6 was significant, it was confirmed by wire whether or not the work suspension was carried out at the workplace, and the subjects of the survey were 1,649 construction sites, 830 manufacturing sites, and 278 other industries, for a total of 2,757 sites. Result: As a result of the fact-finding survey, 56% (1,555 locations) on August 9th and 77% (2,142 locations) on August 10th carried out full or partial work suspension. In particular, on August 10, when the typhoon landed, 40% of all workplaces completely stopped work. Conclusion: Through this study, it was confirmed that the right to suspend work by employers is being used in actual workplaces. In the future, when there is an imminent danger, in addition to the right to suspend work, flexible and telecommuting, working hour adjustments, etc. must be actively used to ensure the safety of workers and protect their lives.