• Title/Summary/Keyword: Construction Sequence Analysis

검색결과 271건 처리시간 0.026초

MOVEMENT CONTROL OF HIGH-RISE BUILDINGS DURING CONSTRUCTION

  • Taehun Ha;Sungho Lee;Bohwan Oh
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.46-51
    • /
    • 2011
  • High-rise buildings are widely being constructed in the Middle-East, South-East, and East Asia. These buildings are usually willing to stand for the landmark of the region and, therefore, exhibit some extraordinary features such as super-tall height, elevation set-backs, overhangs, or free-form exterior surface, all of which makes the construction difficult, complex, and even unsafe at some construction stages. In addition to the elaborately planned construction sequence, prediction and monitoring of building's movement during construction and after completion are required for precise and safe construction. This is often called the Building Movement Control during construction. This study describes Building Movement Control of the KLCC Tower, a 58-story office building currently being built right next to the famous PETRONAS Twin Towers. The main items of the Building Movement Control for the KLCC Tower are axial shortening and verticality. Preliminary prediction of these items are already carried out by the structural design team but more accurate prediction based on construction stage analysis and combined with time-dependent material testing, field monitoring, and site survey is done by the main contractor. As of September 2010, the Tower is under construction at level 30, where the plan abruptly changes from rectangle to triangle. Findings and troubleshooting until the current construction stage are explained in detail and implementations are suggested for future applications.

  • PDF

시공 단계 및 비탄성거동을 고려한 초고층 건축물의 3차원 해석 기법 개발 (Development of Three Dimensional Analysis Method of High-Rise Buildings Considering the Construction Sequence and the Inelastic Behavior)

  • 양주경;설현철;김진근
    • 콘크리트학회논문집
    • /
    • 제20권2호
    • /
    • pp.249-256
    • /
    • 2008
  • 초고층 건축물의 건설이 증가함에 따라 설계, 시공, 사용 단계에서 구조물의 거동을 정확히 예측하는 연구가 점점 중요해지고 있다. 이러한 초고층 건축물의 거동을 예측하기 위해 많은 연구들이 있어 왔지만 대부분의 연구가 기둥이나 보와 같은 선 요소를 사용한 2차원 골조 해석에 중점을 두고 있다. 최근 초고층 건축물에는 다양한 건축 구조 시스템이 적용되고 있으며, 특히 플랫플레이트 구조를 적용하는 사례가 늘고 있다. 그러나 기존의 2차원 해석기법 만으로는 플랫플레이트 구조를 포함하는 초고층 건축물을 합리적으로 모델링하여 해석하는 것이 어려우며, 구조 부재 간 변형이나 하중 전달 과정을 입체적으로 모사하는 데에도 한계가 있다. 따라서 이 연구에서는 기둥, 보와 같은 구조 부재와 동바리와 같은 비구조 부재를 모델링하기 위한 선 요소와 슬래브 구조 부재를 모사하기 위한 평판 요소를 사용하여 초고층 건축물의 거동을 예측하기 위한 3차원 해석기법을 제안하였다. 구조물의 거동을 보다 합리적으로 예측하기 위해 가설공사와 같은 시공 단계, 크리프와 건조수축과 같은 콘크리트의 비탄성거동의 영향을 고려하였다.

시공단계를 고려할 수 있는 유한요소 해석 모델 개발 (Development of finite element analysis model for multi-step excavation problem)

  • 이연규
    • 터널과지하공간
    • /
    • 제6권4호
    • /
    • pp.326-334
    • /
    • 1996
  • In underground construction the multi-step excavation sequence is commonly adopted for the convenience of the underground work. A numerical simulation method which is capable of analyzing the effects of excavation sequence on the stability of the opening is greatly needed. In this study a two dimensional finite element code was developed based on the effective numerical algorithm for the multistep excavation. The practical applicability of the model was verified for the simplified excavation sequences.

  • PDF

철근콘크리트 고층건물 기둥의 부등축소량 해석 및 보정을 위한 시스템 개발 (System Development for Analysis and Compensation of Column Shortening of Reinforced Concrete Tell Buildings)

  • 김선영;김진근;김원중
    • 콘크리트학회논문집
    • /
    • 제14권3호
    • /
    • pp.291-298
    • /
    • 2002
  • 최근 사용재료의 품질과 설계기법의 향상으로 철근콘크리트 고층구조물에 대한 시공이 활발히 이루어지고 있다. 그러나 대부분의 경우에 시간의존적 비탄성변형을 무시하고 있다. 특히 시공단계에서 발생하는 초기변형은 장기적으로 구조물에 심각한 영향을 미칠 수 있다. 또한, 고층구조물에서 발생하는 부등축소는 탄성변형, 크리프, 건조수축 등이 조합되어 일어나기 때문에 고층구조물의 부등축소를 예측하고 실제 현장에서 보정하기 위해서는 장기거동에 대한 해석이 필수적이다. 본 연구에서는 동바리의 설치/제거를 포함한 실제적인 시공과정을 반영할 수 있는 2차원 골조해석 시스템을 개발하였다. 해석 시스템은 데이터베이스 설계기법과 그래픽 사용자 인터페이스(graphic user interface) 환경에서 개발되었으며, Input module, DB Strore module, Database module, Analytical module, Analysis result generation module로 크게 구성되어 있다. 해석 시스템은 시공단계별로 해석을 반복해석을 수행함으로써 발생하는 수많은 데이터와 정보를 데이터베이스 설계를 통해 효율적인 시스템 관리를 한다. Graphic user interface(GUI) 환경의 지원에 의해 사용자가 데이터의 입력, 수정, 검색 작업을 쉽게 할 수 있으며 해석결과를 그래픽 다이어그램(graphic diagram), 테이블(table), 차트(chart) 등으로 확인할 수 있다. 개발된 시스템은 거푸집과 동바리의 설치 및 제거를 포함하는 일반적인 시공단계를 고려할 수 있으며 기둥의 부등축소량을 예측할 수 있으며, 각각의 시공단계별로 발생하는 기둥의 부등축소량을 실제 실무에서 보정할 수 있도록 지원한다.

Cloning and Sequence Analysis of a Glyceraldehyde-3-phosphate Dehydrogenase Gene from Ganoderma lucidum

  • Fei Xu;Zhao Ming Wen;Li Yu Xiang
    • Journal of Microbiology
    • /
    • 제44권5호
    • /
    • pp.515-522
    • /
    • 2006
  • A cDNA library of Ganoderma lucidum has been constructed using a Zap Express cloning vector. A glyceraldehyde-3-phosphate dehydrogenase gene (gpd) was isolated from this library by hybridization of the recombinant phage clones with a gpd-specific gene probe generated by PCR. By comparison of the cDNA and the genomic DNA sequences, it was found that the complete nucleotide sequence encodes a putative polypeptide chain of 338 amino acids interrupted by 6 introns. The predicted amino acid sequence of this gene shows a high degree of sequence similarity to the GPD proteins from yeast and filamentous fungi. The promoter region contains a CT-rich stretch, two CAAT boxes, and a consensus TATA box. The possibility of using the gpd promoter in the construction of new transformation vectors is discussed.

Load Redistribution of Prestressed Concrete Girder Bridges during the Bearing Replacement

  • Park, Sun-Kyu;Kim, Hyeong-Yeol;Kim, Jung-Hyuk
    • KCI Concrete Journal
    • /
    • 제11권3호
    • /
    • pp.141-151
    • /
    • 1999
  • In the replacement of bearing system of bridges, the jacking work to secure work spaces may cause damage of the superstructure, hence the behavior of superstructure by the jacking force must be considered. Especially, in prestressed concrete I-type girder bridges, considering the stress concentration at the girder and the load redistribution of superstructure, the allowable jacking force and jacking sequence have to be determined. In this study, an analytical method is proposed to calculate the jacking force and overall jacking sequence for the replacement of bearing system without any damage to the superstructure. The stress concentration at the girder and load redistribution of the deck due to jacking force are considered to compute the allowable jacking force for each girder and overall jacking sequence for girders in the deck. Using the solution algorithm developed in this study, the optimum jacking sequence and required jacking force for the prestressed concrete I-type gilder bridge having the standard sections are calculated.

  • PDF

복수적분 시구간 직렬탐색 시스템에서 부분 상관기를 이용한 Kronecker 부호의 특성 분석 (Analysis of Kronecker Sequence with Partial-Period Correlation in a Multiple-dwell Serical Serarch System)

  • 임연주;박상규
    • 한국통신학회논문지
    • /
    • 제25권8B호
    • /
    • pp.1333-1340
    • /
    • 2000
  • 본 논문에서는 고속의 초기동기가 가능한 Kronecker 부호를 DS/CDMA 시스템의 확산부호로 하여 패킷 무선 데이터 통신에서의 사용을 위한 타당성을 보인다 먼저 Kronecker 부호의 생성방법 상관특성을 보여 대체적인 부호의 특성을 밝히고 부분 상관기를 이용할 수 있음을 보인다 더 나아가 PN 부호와 같은 평균 초기동기획득 시간을 가질 때의 Kronecker 부호의 오경보 확률과 실패 확률을 구하여 Kronecker 부호가 PN 부호보다 더 높은 동기 확률을 가짐을 보임으로써 패킷 통신에서 Kronecker 부호를 사용할 수 있는 가능성을 확인한다.

  • PDF

3D/BIM Applications to Large-scale Complex Building Projects in Japan

  • Yamazaki, Yusuke;Tabuchi, Tou;Kataoka, Makoto;Shimazaki, Dai
    • 국제초고층학회논문집
    • /
    • 제3권4호
    • /
    • pp.311-323
    • /
    • 2014
  • This paper introduces recent applications of three-dimensional building/construction data modeling (3D) and building information modeling (BIM) to large-scale complex building construction projects in Japan. Recently, BIM has been utilized as a tool in construction process innovation through planning, design, engineering, procurement and construction to establish a front-loading-type design building system. Firstly, the background and introduction processes of 3D and BIM are described to clarify their purposes and scopes of applications. Secondly, 3D and BIM applications for typical large-scale complex building construction projects to improve planning and management efficiency in building construction are presented. Finally, future directions and further research issues with 3D and BIM applications are proposed.

Frequency variation in construction stages and model validation for steel buildings

  • Aras, Fuat
    • Steel and Composite Structures
    • /
    • 제22권3호
    • /
    • pp.647-662
    • /
    • 2016
  • This study aims to monitor the variation of modal frequencies of steel buildings during their construction sequence. In this respect, construction of a steel building is followed by vibration based measurements. The monitored building is a three-story educational building within a building group whose structural system consists of steel moment resisting steel frames and eccentric braces. Five different acceleration measurements in two perpendicular directions are taken on five different construction stages, starting from the erection of the columns and beams ending with the completion of the construction. The recorded measurements are transferred into frequency domain and the dominant frequencies for each case have been determined. The change in the dominant frequencies is evaluated with the existing construction stages and performed constructional works between the stages. The last measurement, performed on the building in service, revealed the first two dominant frequencies as mutual in X and Y direction, showing that these dynamic modes are torsional modes. This result is investigated by numerical analysis performed with finite element model of the building constructed for design purpose. Lower frequencies and different mode shapes are determined from numerical analysis. The reason of lower frequencies is discussed and the vibration survey is extended to determine the effects of an adjacent building. The results showed that the building is in strong relation with an adjoining building in spite of a designed construction joint.

크리프와 건조수축을 고려한 철근콘크리트 기둥과 동바리의 축력 재분배 해석법

  • 김선영;이태규;김진근;이수곤
    • 콘크리트학회논문집
    • /
    • 제13권6호
    • /
    • pp.629-636
    • /
    • 2001
  • 최근 철근콘크리트 골조 구조물에 대한 장기변형 특성을 고려하여 고층건물의 설계 및 시공에 적용하려는 연구가 활발하게 진행되고 있다. 그러나 기존의 연구에서 고려하고 있는 시공단계는 reshoring을 고려하지 못하고 거푸집제거 및 shoring을 한 단계로 고려하기 때문에 동바리를 제거하기전의 초기재령에서 발생하는 변형을 고려하지 못한다. 본 연구에서는 동바리의 설치/제거를 포함한 실제적인 시공과정을 고려하여 거푸집의 강성, 동바리의 강성 그리고 시간에 따른 콘크리트의 강성의 변화에 따른 축력변화를 예측할 수 있는 2차원 골조해석 프로그램을 개발하였다. 예제해석결과 동바리의 축력이 시간에 따라서 감소한다. 또한, 동바리의 개수와 상관없이 기둥과 동바리와의 축력 재분배에 의해서 외측기둥에는 실제 설계 값보다 비탄성 하중이 작게 작용하고 내측 기둥에서는 크게 나타난다. 한편, 프로그램의 타당성을 검증하기 위하여 실제 철근콘크리트 골조 구조물을 타설-거푸집 제거-reshoring-동바리 제거-부가하중작용과 같은 일반적인 시공순서에 따라서 제작하였다. 실험결과 동바리를 제거하기 전에 기둥에 변형이 발생하며 동바리의 축력이 기둥에 분배되었다. 따라서 개발된 해석프로그램은 실험결과를 비교적 잘 예측하였다.