• 제목/요약/키워드: Construction Sequence

검색결과 588건 처리시간 0.028초

시공단계별 해석에 의한 현수교의 안전한 건설방법 (The Safe Erection Method of Suspension Bridges by Construction Sequence Analysis)

  • 방명석
    • 한국안전학회지
    • /
    • 제22권6호
    • /
    • pp.55-62
    • /
    • 2007
  • The structural safety of long span bridges such as suspension bridges is smaller under the construction stage than in the completion. But the importance of construction sequences has been neglected in most of safety check programs. On this study is developed the structural analysis method of suspension bridges considering construction sequences and structural analyses are performed by step by step during construction. This can be used to determine the safest erection method. The results shows that the more critical structural behavior appears under construction than after completion.

비틀림 초고층 프로토타입 모델에 대한 시공단계해석의 적용 (Applications of Construction Sequence Analyses to Prototype Models of Twisted Tall Buildings)

  • 최미미;김재요;엄태성;장동운
    • 한국전산구조공학회논문집
    • /
    • 제26권1호
    • /
    • pp.89-97
    • /
    • 2013
  • 비정형 초고층 건물의 계획 및 시공이 늘어남에 따라 이 연구에서는 프로토타입 모델에 대한 시공단계해석의 적용을 통하여 비정형 초고층 건물의 시공 중 구조적 거동을 분석하고자 하였다. 비틀림 초고층 건물을 대상으로 횡력저항시스템, 비틀림각도, 공법 조건에 따른 총 18개의 모델을 선정하였다. 횡력저항시스템으로는 다이아그리드 시스템과 가새튜브 시스템을 적용하였으며, 각 횡력저항시스템별로 $0^{\circ}$, $1^{\circ}$, $2^{\circ}$ 비틀림각도를 갖는 세 가지 평면 형태와 외곽 튜브와 내부 골조의 시공순서에 따른 세 가지 공법을 가정하였다. 시공 중인 초고층 건물의 구조적 성능은 시공단계해석의 횡변위 결과를 통하여 분석되었으며, 골조 공기와 최대 양중량과 같은 시공성능이 함께 비교되었다.

산업플랜트 건설 프로젝트의 주요 공정 시퀀스 분석을 통한 리스크 평가 (Project Risk Assessment Through Construction Sequence Analyses for Industrial Plant Construction Projects)

  • 이규성;최재현
    • 한국건설관리학회논문집
    • /
    • 제14권4호
    • /
    • pp.140-151
    • /
    • 2013
  • 2011년과 2012년 국내건설기업의 해외건설시장 공종별 수주구조는 플랜트분야가 약 645억 달러(전체의 73%)로 타 건설분야에 비해 압도적이며 수주금액 또한 역대 최고액을 기록하였다. 이러한 플랜트 건설시장의 비중과 수주율은 당분간 지속될 전망이다. 하지만 국내 기업이 보유한 플랜트 건설기술은 상세설계와 건설시공 분야에서 비교적 높은 경쟁력을 보이나, 엔지니어링의 원천기술 및 기본설계 분야와 사업관리 분야는 기술 선진국의 60%~70% 내외이다. 국내 기업의 사업관리 경쟁력을 향상시키기 위해 플랜트 건설 공정관리 기술의 고도화와 프로젝트 수행과정에서 발생하는 리스크의 체계적인 평가 방안을 마련하는 것이 시급하다. 본 연구에서는 산업플랜트 건설프로젝트의 주요 공정 시퀀스 모델을 개발하여 프로젝트 초기에 공정계획 수립의 주요 항목설정과 공사의 흐름 및 공정 간의 연관관계 등을 명확하게 정립할 수 있도록 하였다. 특히 공종별 주요 액티비티 분석을 통해 주요 공정 시퀀스를 도출하였고, 퍼지이론을 활용하여 프로젝트 수행 단계별 위험도 평가 방안의 개발 및 중점 관리 공정 프로세스를 제시함으로써 산업플랜트 건설 프로젝트 공정개발과정과 주공정 수행과정의 리스크 분석에 용이성을 향상할 수 하도록 하였다.

Design Structure Matrix: An Approach to Reduce Iteration and Acquire Optimal Sequence in Construction Design and Development Projects

  • 살만 아크람;김정환;서종원
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2008년도 정기학술발표대회 논문집
    • /
    • pp.638-641
    • /
    • 2008
  • Design is an iterative, generative, and multidisciplinary process by its nature. Iteration is frequent in most of the engineering design and development projects including construction. Design iterations cause rework, and extra efforts are required to get the optimal sequence and to manage the projects. Contrary to simple design, isolation of the generative iterations in complex design systems is very difficult, but reduction in overall iterations is possible. Design depends upon the information flow within domain and also among various design disciplines and organizations. Therefore, it is suggested that managers should be aware about the crucial iterations causing rework and optimal sequence as well. In this way, managers can handle design parameters related to such iterations proactively. Numbers of techniques are available to reduce iterations for various kinds of engineering designs. In this paper, parameter based Design Structure Matrix (DSM) is chosen. To create this DSM, a survey was performed and then partitioned using a model. This paper provides an easy approach to those companies involved in or intend to be involved in "design and build projects."

  • PDF

BIM-Based Simulator for Rebar Placement

  • Park, U-Yeol
    • 한국건축시공학회지
    • /
    • 제12권1호
    • /
    • pp.98-107
    • /
    • 2012
  • Reinforcing bars (rebar) comprise an integral part of a concrete structure, and play a major role in the safety and durability of the building. However, the actual placement or installation of rebar is not planned and controlled by the detailer. Recently, 4D simulations, using 3D model and scheduling software, have been used to improve the efficiency of the construction phrase. However, 4D simulators have not been introduced at the detailed level of work, such as rebar placement. Therefore, this paper suggests a BIM-based simulator for rebar placement to determine the sequence with which rebar is placed into the form. The system using Autodesk Revit API automatically generates rebar placement plans for a building structure, and labels the placement sequence of each individual bar or set of bars with ascending numbers. The placement sequence is then visualized using Autodesk Revit Structure 2012. This paper provides a short description of a field assessment and limits.

티타늄 금속을 활용한 수열온도 예측용 간이측정장치 개발에 관한 기초적 연구 (A Fundamental Study on Development Hydrothermal Temperature Measuring Tools Using Titanium)

  • 심상락;류동우
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2016년도 춘계 학술논문 발표대회
    • /
    • pp.199-200
    • /
    • 2016
  • Accurate fire diagnoses are needed to properly repair and strengthen buildings affected by fire. The current diagnosis method of fire takes time and is ineffective. In previous research, Melting point temperature of each sequence to grasp easily the temperature of the concrete up to 200 ~ 600 ℃ was to estimate the temperature by utilizing a different sequence representing material.But In the form of conventional hydrothermal temperature prediction simple measuring device, it is difficult in the future buried in application to the construction site, there is a problem of damage when concrete pouring, and only the extension of life measured by the zinc has a problem does not distinguish between 400 ℃ and 500 ℃. Therefore this study is conducted by utilizing a titanium metal changes the color depending on the temperature to check for the applicability of the simple apparatus for measuring the temperature prediction sequence.

  • PDF

MODEL FOR DESIGN MANAGEMENT IN COLLABORATIVE ENVIRONMENT USING DESIGN STRUCTURE MATRIX AND DESIGN PARAMETERS' INFORMATION

  • Salman Akram;Jeonghwan Kim;Jongwon Seo
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1307-1312
    • /
    • 2009
  • Design is an act based on multidisciplinary information. The involvement of various stakeholders makes it difficult to process, plan, and integrate. Iteration is frequent in most of the engineering design and development projects including construction. Design iterations cause rework, and extra efforts are required to get the optimal sequence and to manage the projects. The simple project management techniques are insufficient to fulfill the requirements of integrated design. This paper entails two things: design structure matrix and design parameters' information based model. The emphasis has been given to optimal sequence and crucial iteration using design structure matrix analysis technique. The design projects have been studied using survey data from industry. The optimal sequence and crucial iterations results have been utilized for proposed model. Model integrates two things: information about produced- required key design parameters and information of design changes during the design process. It will help to get familiar with Design management in order to fulfill contemporary needs.

  • PDF

접원의 전방향 경로이동에 의한 오프셋 알고리즘 (An offset algorithm with forward tracing of tangential circle for open and closed poly-line segment sequence curve)

  • 윤성용;김일환
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2003년도 학술회의 논문집 정보 및 제어부문 B
    • /
    • pp.1022-1030
    • /
    • 2003
  • In this paper we propose a efficient offset curve construction algorithm for $C^0$-continuous Open and Closed 2D sequence curve with line segment in the plane. One of the most difficult problems of offset construction is the loop problem caused by the interference of offset curve segments. Prior work[1-10] eliminates the formation of local self-intersection loop before constructing a intermediate(or raw) offset curve, whereas the global self-intersection loop are detected and removed explicitly(such as a sweep algorithm[13]) after constructing a intermediate offset curve. we propose an algorithm which removes global as well as local intersection loop without making a intermediate offset curve by forward tracing of tangential circle. Offset of both open and closed poly-line segment sequence curve in the plane constructs using the proposed approach.

  • PDF

Construction sequence modelling of continuous steel-concrete composite bridge decks

  • Dezi, Luigino;Gara, Fabrizio;Leoni, Graziano
    • Steel and Composite Structures
    • /
    • 제6권2호
    • /
    • pp.123-138
    • /
    • 2006
  • This paper proposes a model for the analysis of the construction sequences of steel-concrete composite decks in which the slab is cast-in-situ for segments. The model accounts for early age shrinkage, such as thermal and endogenous shrinkage, drying shrinkage, tensile creep effects and the complex sequences of loading due to pouring of the different slab segments. The evolution of the structure is caught by suitably defining the constitutive relationships of the concrete and the steel reinforcements. The numerical solution is obtained by means of a step-by-step procedure and the finite element method. The proposed model is then applied to a composite deck in order to show its potential.

Resource and Sequence Optimization Using Constraint Programming in Construction Projects

  • Kim, Junyoung;Park, Moonseo;Ahn, Changbum;Jung, Minhyuk;Joo, Seonu;Yoon, Inseok
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.608-615
    • /
    • 2022
  • Construction projects are large-scale projects that require extensive construction costs and resources. Especially, scheduling is considered as one of the essential issues for project success. However, the schedule and resource management are challenging to conduct in high-tech construction projects including complex design of MEP and architectural finishing which has to be constructed within a limited workspace and duration. In order to deal with such a problem, this study suggests resource and sequence optimization using constraint programming in construction projects. The optimization model consists of two modules. The first module is the data structure of the schedule model, which consists of parameters for optimization such as labor, task, workspace, and the work interference rate. The second module is the optimization module, which is for optimizing resources and sequences based on Constraint Programming (CP) methodology. For model validation, actual data of plumbing works were collected from a construction project using a five-minute rate (FMR) method. By comparing actual data and optimized results, this study shows the possibility of reducing the duration of plumbing works in construction projects. This study shows decreased overall project duration by eliminating work interference by optimizing resources and sequences within limited workspaces.

  • PDF