• Title/Summary/Keyword: Construction Risk Assessment

Search Result 466, Processing Time 0.026 seconds

Safety Management Information System in Plants Construction Work (플랜트 건설공사의 안전관리 정보시스템 개발)

  • Park, Jong-Keun
    • Journal of the Korea Safety Management & Science
    • /
    • v.14 no.4
    • /
    • pp.23-29
    • /
    • 2012
  • There are insufficient models that find problems and solutions for accident prevention through risk assessment and suggest safe work process and work instruction from foundation works to finish work for accident decrease. This paper presents a quantitative risk assessment model by analysis of risk factors in each process such as appurtenant works, temporary works, structural works, equipment work, finishing work and etc based on accident examples and investigation on actual condition in plants construction work. In addition, the safety management system was developed to perform risk assessment of plants construction and use it for effective safety training for labor.

A Fuzzy-based Risk Assessment using Uncertainty Model (불확실성 모델을 사용한 퍼지 위험도분석)

  • Choi Hyun-Ho;Seo Jong-Won;Jung Pyung-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.473-476
    • /
    • 2003
  • This paper presents a systematic risk assessment procedure with uncertainty modeling for general construction projects. Since the approach is able to effectively deal with all the related construction risks in terms of the assumed probability with conditional probability concept that systematically incorporate expert's experiences and subjective judgement, the proposed methods with uncertainty modeling is able to apply to all the construction projects inherent in lots of uncertain risk events. The fuzzy set theory is adopted to enhance risk assessment to effectively handle the vague and dynamic phenomenon of an event Therefore, the fuzzy-based risk assessment is very useful, for those countries, such as Korea, where objective probabilistic data for risk assessment is extremely rare, and thus the utilization of subjective judgmental data based on expert's experiences is inevitable.

  • PDF

Safety Management Information System in Construction Work - Focus on Apartment Work - (건설공사의 안전관리정보시스템 개발 - 아파트공사 중심으로 -)

  • Park, Jong-Keun
    • Journal of the Korean Society of Safety
    • /
    • v.24 no.6
    • /
    • pp.124-131
    • /
    • 2009
  • In any form of construction work, it is essential that accidents be prevented at every stage, from foundation preparation to build completion. For this, it is necessary to use models that can assess risk and provide instructions for safe work processes so that the risk of accidents is reduced. Currently, however, very few models can perform these tasks. In this paper, we present a model that assesses risk quantitatively by analyzing the risk factors involved in each stage of construction, such as foundation work, temporary work, structural work, equipment work, and finishing work. The model performs assessment based on examples of accidents and by investigating actual conditions during construction. In addition, we present in this paper a safety management system developed to assess risk during construction and to effectively train laborers.

Risk Factors Analysis and Quantitative Risk Assessment Model for Tunnel Construction Project (터널 건설 프로젝트 리스크 분석 및 리스크 정량화 모델 개발에 관한 연구)

  • Jeong, Seung-A;Ahn, Sungjin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.363-364
    • /
    • 2023
  • The tunnel construction projects is demanded more efficient risk management measures and loss forecasts to prepare for risk losses from an increase in the trend of tunnel construction. This study aims to analyze the risk factors that caused the loss of material in actual tunnel construction and to develop a quantified predictive loss model, based on the past loss record of tunnel construction projects.

  • PDF

Analysis of Operation System Establishment Cases for Efficient use of Risk Assessment at Construction Sites - H Focusing on Construction Company Cases (건설현장의 위험성평가 효율적 활용을 위한 운영 시스템 구축사례 분석 - H 건설사 사례중심으로)

  • Jae-Bung Lee
    • Journal of the Society of Disaster Information
    • /
    • v.18 no.4
    • /
    • pp.828-838
    • /
    • 2022
  • Purpose: Through the establishment of a computerized system of risk assessment, the purpose is to analyze the case of whether the co-workers who are subject to the risk assessment at the construction site can easily fill it out and expect disaster reduction through efficient risk assessment activities. Method: By providing the risk factors and safety measures for the work by selecting the type of work, the risk estimation and the establishment of countermeasures can be made, and a system has been established to enable practical disaster prevention activities by presenting disaster cases for the work. Result: Through the analysis of the change in the scaled disaster rate for the years following the on-site application after the establishment of the risk assessment computer system of H Construction Company, it was confirmed that the scaled disaster rate of the domestic construction industry increased, while the conversion disaster rate of H Construction Company decreased. Conclusion: Through the computational systemization of risk assessments, workers in the field can easily access the risk assessment, evaluate the risk factors of the process and establish risk prevention measures, and it has been analyzed that there is an impact on the reduction of the disaster rate during the operational analysis period.

Risk analysis for sidetrack construction during subway tunnel operation (기존 지하철 터널 운영 중 대피선 건설 시공 리스크 분석)

  • Jun, Jonghun;Chung, Heeyoung;Koh, Sung-Yil;Yoon, Hee Taek;Yi, Na Hyun;Choi, Hangseok
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.22 no.4
    • /
    • pp.401-417
    • /
    • 2020
  • As an increasing demand for rapid railway transportation, the construction of sidetrack is inevitable to operate local and express trains simultaneously. However, the current technologies for the sidetrack construction method require a long construction period by interrupting the operation of the existing subway line, as well as cause a huge economic loss. Thus, it is necessary to study the sidetrack construction method under the special situation that the subway is in operation and to analyze the risk of the existing tunnel enlargement process for the sidetrack construction. Therefore, in this paper, the Government Complex Gwacheon station on Subway Line 4 was considered as a target station for the virtual sidetrack construction and the optimal sidetrack construction plan was derived. Subsequently, the application of risk management process was carried out in the order of identifying risk, risk response planning, performing a risk analysis, risk monitoring and control for potential risk events during the construction of sidetrack under the subway operation. A total of eight potential risk events and risk mitigation methods were selected, and a risk assessment matrix was established using the five-step risk probability and impact level criteria to perform the risk assessment including residual risks. Based on the results of the risk assessment, the risk grade and the reduction effect of each risk mitigation method were confirmed.

Probabilistic Risk Assessment System Model and Methods for Construction Projects (건설공사의 확률적 위험도분석 시스템 모형 및 해석방법)

  • 조효남;최현호;김윤배
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 1999.04a
    • /
    • pp.3-10
    • /
    • 1999
  • This paper presents probabilistic risk assessment system model and methods for general construction projects and demonstrates the applicability of the approach to a specific subway construction project. The proposed system model entitled Integrated Risk Assessment System(IRAS) for construction projects is composed of four steps, which is newly reorganized and improved in order to be easily adjusted for a systematic PRA of construction projects. Based on the proposed model, and integrated prototype software is then developing for computer-aided PRA of construction projects under the environment of the graphic-user interface, which will be successfully applied to construction projects.

  • PDF

Risk Assessment for Reducing Safety Accidents caused by Construction Machinery (건설장비 안전사고 저감을 위한 위험성평가)

  • Jeon, Hyun Woo;Jung, In Su;Lee, Chan Sik
    • Journal of the Korean Society of Safety
    • /
    • v.28 no.6
    • /
    • pp.64-72
    • /
    • 2013
  • Construction machinery has been utilized to carry out construction works effectively. Using construction machinery enables a builder to reduce the time and the cost needed for the construction, but the fatal accident caused by it has been increased. This study is intended to identify risk magnitude of accident by kind of construction machinery through interviews with experts. Construction machineries surveyed in this research are excavator, tower crane, lift, mobile crane and forklift, those are the machinery which accident occurs more often than the other machinery. To evaluate the risk of the accidents identified, risk category was determined according to the US DOD system safety program (MIL-STD-882B) considering the risk degree and intensity. As a result, accident occurred in the process of material transport & handling was found to be the most dangerous. On the other hand, the accidents caused by the defective machinery and the poor safety gear were considered to be less dangerous relatively. The risk category by type of construction machinery suggested in this study is expected to provide the basic data in developing the safety guidance for construction project.

Determination of Fire Risk Assessment Indicators for Building using Big Data (빅데이터를 활용한 건축물 화재위험도 평가 지표 결정)

  • Joo, Hong-Jun;Choi, Yun-Jeong;Ok, Chi-Yeol;An, Jae-Hong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.22 no.3
    • /
    • pp.281-291
    • /
    • 2022
  • This study attempts to use big data to determine the indicators necessary for a fire risk assessment of buildings. Because most of the causes affecting the fire risk of buildings are fixed as indicators considering only the building itself, previously only limited and subjective assessment has been performed. Therefore, if various internal and external indicators can be considered using big data, effective measures can be taken to reduce the fire risk of buildings. To collect the data necessary to determine indicators, a query language was first selected, and professional literature was collected in the form of unstructured data using a web crawling technique. To collect the words in the literature, pre-processing was performed such as user dictionary registration, duplicate literature, and stopwords. Then, through a review of previous research, words were classified into four components, and representative keywords related to risk were selected from each component. Risk-related indicators were collected through analysis of related words of representative keywords. By examining the indicators according to their selection criteria, 20 indicators could be determined. This research methodology indicates the applicability of big data analysis for establishing measures to reduce fire risk in buildings, and the determined risk indicators can be used as reference materials for assessment.

A Study on the Awareness of Safety and Health for Practical Application of Risk Assessment in Construction Industries -Focused on Worker- (건설업 위험성평가 실무적 적용을 위한 안전보건 인식도 조사 연구 -근로자를 중심으로-)

  • Choi, Soo Hwan;Oh, Tae Keun
    • Journal of the Korean Society of Safety
    • /
    • v.28 no.2
    • /
    • pp.60-65
    • /
    • 2013
  • On the basis of the guideline "2012-104(2012.9.26.)" notified by the ministry of employment and labor, this paper provided the baseline data and the improvement proposal in applying risk assessment to a construction site by group interview & survey of construction workers. The worker's awareness and action plan of safety and health were investigated by numerical analysis. From the result of group interview and the survey of construction workers, it was found that most of construction workers feel the danger during the work. The results also shows that risk assessment can help to change & raise the awareness of safety and to reduce the industrial disaster. In addition, simple safety management activity such as TBM & active education of safety will be necessary for safe workspace and the active TBT(tool box talk) which combines TBM & the education of safety will be also effective.