Present and Future of Risk Management of Construction Practice in Asia

  • Watanabe, Tsunemi
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.4-5
    • /
    • 2015
  • Owning to rapid infrastructure development, Asia is experiencing dramatic economic growth. There are not a few cases in which, however, economic growth is achieved by increasing the external diseconomy. Pursuit of sustainable development is one of the most important issues for mankind. Under the post-industrial capitalism society, however, there seems a big risk of increase in the external diseconomy worldwide. The objectives of this manuscript are to discuss importance of risk management of construction practice in present and future. Regarding the latter, a particular attempt is made to discuss how project risk communication should be done to reduce the external diseconomy. Presently, one of the important issues in implementation of infrastructure projects is practice of risk management to properly manage time, cost, quality, and safety: mainly maximization of internal economy. Multi-party risk and uncertainty management process (MRUMP) is one of tolls to assist it. The idea on MRUMP can be used to reduce the external diseconomy through identifying, sharing, and tuning people's rhythms.

  • PDF

Development of Fuzzy Model for Analyzing Construction Risk Factors (건설공사의 리스크분석을 위한 퍼지평가모형 개발)

  • Park Seo-Young;Kang Leen-Seok;Kim Chang-Hak;Son Chang-Bak
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.519-524
    • /
    • 2001
  • Recently, our construction market recognizes the necessity of risk management, however the application of practical system is still limited on the construction site because the methodology for analyzing and quantifying construction risk and for building actual risk factors is not easy. This study suggests a risk management method by fuzzy theory, which is using subjective knowledge of an expert and linguistic value, to analyze and Quantify risk. The result of study is expected to improve the accuracy of risk analysis because three factors, such as probability, impact and frequency, for estimating membership function are introduced to quantify each risk factor.

  • PDF

Market Expansion Strategies for Small or Medium-sized Construction Companies by Developing Quantitative Risk Assessment Model

  • Yoo, Jinhyuk;Koh, Seungyoon;Seo, Induck;Cha, Heesung
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.742-743
    • /
    • 2015
  • Korean construction industry has developed with national economy growth for a couple of decades. However, because of slump of real estate, the domestic construction industry was intimidated. In this situation, many construction company has no choice but to go abroad to find construction projects. However, almost small or medium-sized construction companies are very hard to operate their business because they have small funding ability and weak labor power. Therefore, this study aims to propose an assessment tool through analyzing risk factors of overseas construction projects for small or medium-sized companies by examining preceding research and interviewing industry experts. Weights of the risk factors are determined through the surveys of the industry practitioners. All of the data is configured into the assessment tool and this converts the quantitative information which leads to the optimal of strategies choice. This paper provides a quantitative measurement of possible performance and detailed assessment of each itemized risk factors. This assessment tool is qualified for industry experts so that it can safely be applied to the future projects. Ultimately, many small or medium sized construction companies will benefit from the tool proposed in this study to examine the potential of the overseas market expansion.

  • PDF

Plans for Reducing Risk through a Case Study of Risk Factors at a Construction Site -Focused on Earth work, Foundation Work, Reinforced Concrete Construction- (건설현장의 위험요소 사례연구를 통한 위험저감 방안의 고찰 -토공사, 기초공사, 철근콘크리트공사를 대상으로-)

  • Kim, Jin-Ho
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.4
    • /
    • pp.83-93
    • /
    • 2010
  • With construction projects continuously becoming more massive and complex, risk factors have been consistently increasing. To achieve a successful project, it is very important to identify and cope with such risk factors. Therefore, the purpose of this study is to suggest plans of reducing risk, not only for describing the drafting process for construction planning but also for systematically organizing constraints and risk factors in earth work, foundation work and reinforced concrete construction. To achieve these objectives, this study 1) analyzes previous theories about risk classification structure, 2) performs a case study of an actual project to embody the problems of safety management by analyzing the results of an interview with a construction engineer. In conclusion, the following factors were systematically organized: 1) characteristics of construction site (purpose, structure, floor, etc.); 2) the actual application conditions of the main construction methods; 3) the relationship between constraints and risk factors.

Risk Assessment for Disaster Reduction in Small-Scale Construction Sites (소규모 건축현장 재해감소를 위한 위험성평가 방안)

  • Choi, Hyun-Jun
    • Journal of the Society of Disaster Information
    • /
    • v.18 no.2
    • /
    • pp.395-404
    • /
    • 2022
  • Purpose: Small-scale construction sites have insufficient systematic safety management activities, and due to the characteristics of the construction site, the production structure is complex due to external environmental factors, and the risk of construction equipment is very high. We would like to propose a checklist method among practical risk assessment techniques that can derive risk factors for disaster prevention at small construction sites and reduce disasters. Method: Risk factors were derived by analyzing literature research and disaster cases, and detailed work for a checklist of risk assessment suitable for small-scale construction sites was classified based on risk factor items. Result: Hazard factors were divided into 6 major categories, and 29 detailed types of work were classified based on actual work types, and 80 detailed works were classified accordingly. Conclusion: By arranging risk factors suitable for small-scale construction sites according to the classification system, the lack of expertise in the construction site can be supplemented, and risk factors can be derived more easily and disaster reduction can be expected through establishment of safety measures.

Risk analysis for sidetrack construction during subway tunnel operation (기존 지하철 터널 운영 중 대피선 건설 시공 리스크 분석)

  • Jun, Jonghun;Chung, Heeyoung;Koh, Sung-Yil;Yoon, Hee Taek;Yi, Na Hyun;Choi, Hangseok
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.22 no.4
    • /
    • pp.401-417
    • /
    • 2020
  • As an increasing demand for rapid railway transportation, the construction of sidetrack is inevitable to operate local and express trains simultaneously. However, the current technologies for the sidetrack construction method require a long construction period by interrupting the operation of the existing subway line, as well as cause a huge economic loss. Thus, it is necessary to study the sidetrack construction method under the special situation that the subway is in operation and to analyze the risk of the existing tunnel enlargement process for the sidetrack construction. Therefore, in this paper, the Government Complex Gwacheon station on Subway Line 4 was considered as a target station for the virtual sidetrack construction and the optimal sidetrack construction plan was derived. Subsequently, the application of risk management process was carried out in the order of identifying risk, risk response planning, performing a risk analysis, risk monitoring and control for potential risk events during the construction of sidetrack under the subway operation. A total of eight potential risk events and risk mitigation methods were selected, and a risk assessment matrix was established using the five-step risk probability and impact level criteria to perform the risk assessment including residual risks. Based on the results of the risk assessment, the risk grade and the reduction effect of each risk mitigation method were confirmed.

Development of a Risk Management Procedure Model for the Construction Project Using Construction Risk Management System (CRMS를 활용한 건설공사의 리스크관리 절차모형 개발)

  • Kim, Chang Hak;Kang, Leen Seok;Park, Hong Tae
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.4D
    • /
    • pp.423-432
    • /
    • 2010
  • This study suggested CRMS (construction risk management system) which is a new risk analysis model after analyzing existing risk management process for to guarantee a successful performance at the construction planning and work phase. CRMS is risk management procedures in order that the contractor identify, analyze and administrate the risk during performing construction project. This model may give much help to quantify and be ready the right managing methods about identified risk by the contractor. Especially, the most important and difficult things of all risk management may be to identify risk in the project. This study make more focusing on the developing a procedure that can identify risk more easily in the construction project. The risk is divided into global risk and local risk of a project. Also, this study suggests methods which are using the RBS (risk breakdown structure) related with WBS. This result will be useful as basic materials for developing computerizing system for risk management.

The Analysis of the Weights of Country Risk by Participants of Overseas Construction Projects (건설사업 참여주체 별 해외건설공사 국가리스크 핵심요인 도출 및 비교분석)

  • An, Byung-Ho;Kim, Jin-Eon;Kim, Yea-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.2
    • /
    • pp.150-159
    • /
    • 2013
  • The government has focused on activation of overseas construction projects and strengthening competitiveness in the long term. In recent years Public construction contract as well as design, engineering, construction management(CM) are gradually expanding into other countries, but risk analysis cases in the field are slight. In this study, We utilized PI scale and drew a conclusion about the importance of overseas risk by participants. We compared its features from the risk factor based on Risk Matrix. As a result of this study total of 6 section 31 Country Risk factors for the importance of overseas risk by participants were drawn, and the key risk factors (17 constructor, 14 designers, 17 CMr) based on Risk Matrix were derived. By utilizing the result of this study will be used as the basic data for establishing risk management strategy to meet each business and planning evaluation model.

Feasibility Analysis of Introducing CM at Risk Delivery Method to the Korean Public Construction Industry by Analyzing Attributes of the Projects (대상공사의 특성요인 적합도 분석에 의한 공공부문 'CM at Risk 방식' 도입의 타당성 분석)

  • Koh, Min-Hyeok;Kim, Yea-Sang;Kwon, Soon-Wook;Chin, Sang-Yoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.2
    • /
    • pp.3-14
    • /
    • 2010
  • A high degree of management skills and functions is essential to the success of construction projects. While the various construction management delivery methods have been realized as the solutions, Korean government is planning to introduce 'CM at Risk Method' to the public construction projects. However, even if its effect has been verified successful in the international market, it must be considered before legally adapting the method that it would be suitable to our public sector, In this respect, the purpose of this study is to evaluate and analyze feasibility of 'CM at Risk Method'. In order to do that, 15 attributes of construction projects were found, which were suitable to 'CM at Risk Method' in general, 'CM at Risk-GMP Method', and 'CM at Risk-Cost Reimbursable Method' and suitability of each attribute to each of 9 categories of public construction facilities was evaluated by questionnaire survey to CM specialists. Results showed that 'CM at Risk Method' might not bring improper effect to the industry but due to the characteristic of public sector, the effect would be very limited.

PRACTICAL APPROACHES TO RISK MANAGEMENT FOR GLOBAL CONTRACTORS

  • Seung Heon Han;Du Yon Kim;Han Him Kim
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1231-1236
    • /
    • 2005
  • Global construction projects manifest more risks than do other industries. Often, firms doing business in construction markets find these risks intimidating. To secure corresponding profits, many global contractors attempt to forecast the effects of risks and establish risk management strategies. However, one key problem with present-day risk management methods is that they are basically analytical or mathematical-oriented approaches which are not easy to adopt in real business. Based on preliminary investigations and evaluations of current tools, this research elicits more practical algorithms for risk checklist by constructing risk scenarios over the whole period of project execution. For the application of the algorithms, a "SE/RF" (Source-Event/Regular-Floating) checklist is suggested, which sorts out risk sources and their subsequent events, as well as dividing various risk factors into either regular or floating categories. In addition, the "PIS" (Probability-Impact-Significance) method is introduced, in place of traditional "PI" (Probability-Impact) methods, by adding the additional criterion of "risk significance" to determine the degree of risk exposure in a more realistic way. As a result, we draw the significant finding that the "PIS" method presents a closer evaluation regarding degree of risk exposure as compared to the level of expert judgments than those from traditional methods. Finally, we provide an integrated procedure for international project risk management with all of the research achievements being incorporated.

  • PDF