This paper is developed with software system for the construction of periodic maintenance. The system includes records of equipment, maintenance work, failure mode analysis and work standards of maintenability, inspection & repair to establish periodic maintenance system. And the software program is designed with user-oriented to analyze maintenance data and maintenance system of periodic interval times. Also machine operator can easily apply maintenance management system in production & manufacturing field. Visual Basic in the environment of Window system is used as computer program language for graphics and data base management in IBM PC.
The 3th International Conference on Construction Engineering and Project Management
/
pp.537-543
/
2009
Noting the changes within the Singapore construction industry, fuelled by the government's 'green' initiatives in tandem with the prolonged effect of the 1997-2005 recession, this paper investigates Singapore contractors' attitudes towards environmental sustainability. Data were collected from 34 interviews with senior management of large and medium-sized general building contractors and the firms' archival records. The results show that the majority of the contractors embrace positive attitudes towards environmental sustainability. The respective contractors explicitly express their environmental drives by incorporating keywords such as 'quality', 'sustainability' and 'environmental and social benefits' into their firms' mission statements. The results also show that three environmental-related measures implemented by all contractors are: (i) stricter housekeeping procedures in construction sites; (ii) stricter wastage rates for construction materials; and (iii) greater focus on Just-In-Time delivery to minimise materials deterioration due to inappropriate site storage.
Lee Du-heon;Kim Kyoon-tai;Kim Hyun Bae;Jun Jin-taek;Han Choong-hee
국제학술발표논문집
/
The 2th International Conference on Construction Engineering and Project Management
/
pp.30-40
/
2007
The demand for light-rail construction projects has recently been increasing, and they are mostly supervised by private construction companies. Therefore, a private construction company that aim to raise gains from the operation of the facilities during the contract period greater than what they invested should b able to accurately calculate the costs from the aspect of Life Cycle Cost (LCC). In particular, a light-rail transit bridge that has a heavier portion from the aspect of the cost of light-rail transit construction requires a more accurate calculation method than the conventional LCC calculation method. For this, an LCC analysis model was developed and a cost breakdown structure was suggested based on literature review. The construction costs by shape of the upper part of a light-rail transit were calculated based on the cost breakdown system presented in this paper, and the cost generation cycle and cost unit price were collected and analyzed based on records on maintenance costs, rehabilitation and replacement. In addition, after forming some hypotheses in order to perform the LCC analysis, economic evaluation was conducted from the aspect of the LCC by using performance data by item.
Cho, Bit Na;Kim, Young Hwan;Kim, Min Seo;Jeong, Tae Woon;Kim, Chang Hak;Kang, Leen Seok
국제학술발표논문집
/
The 6th International Conference on Construction Engineering and Project Management
/
pp.612-613
/
2015
As a construction project is recently becoming large-scaled and complex, construction process plan and management for successful performance of a construction project has become more important. Especially a reasonable estimation plan of activity duration is required because the activity duration is directly related to the determination of the entire project duration and budget. However, the activity duration is used to estimate by the experience of a construction manager and past construction records. Furthermore, the prediction of activity duration is more difficult because there is some uncertainty caused by various influencing factors in a construction project. This study suggests an estimation model of construction activity duration using neural network theory for a more systematic and objective estimation of each activity duration. Because suggested model estimates the activity duration by a reasonable schedule plan, it is expected to reduce the error between planning duration and actual duration in a construction project. And it can be a more systematic estimation method of activity duration comparing to the estimation method by experience of project manager.
본 연구는 기록관리 현장에서 클라우드 기록관리시스템을 구축 운영하면서 발생한 문제점을 분석하고 개선방안을 제시하였다. 클라우드 기록관리시스템은 다음과 같은 문제점을 가지고 있다. 법제도의 변화 없이 시스템 변화만 이뤄진 상태이고, 클라우드 기술의 장점을 전혀 활용하지 못하고 있다. 또한 시스템 도입 이후의 변화는 전혀 고민하지 않고 있다. 이를 해결하기 위해서 3가지 개선방안을 제시하였다. 첫 번째, 법제도 정비와 관련하여 기록관리 단위(기록철-기록건 구조)의 다양화, 기록의 접근제한 재검토를 제시하였다. 두 번째 종이문서 기반의 현행 업무프로세스 개선을 통한 시스템 재설계를 제시하였다. 세 번째, 범정부적으로 발생하는 기록관리 현안을 해결하기 위해 국가기록원의 적극적인 대응 및 거버넌스 기구 설치를 제안하였다.
본 연구는 근 현대 지역사료 수집, DB 구축 및 공동 활용 방안의 네 가지 측면을 다루었다. 첫째, 한국 지역사의 개념은 향토사, 지방사, 지역사 등으로 쓰이는데 근 현대사와 관련해서는 지역사의 개념이 확대되고 있는 추세이다. 둘째, 국가기록원은 1999년에 제정된 공공기관의 기록물관리에 관한 법률에 의거하여 근 현대 지역사료를 체계적으로 수집하여 관리하고 있으며 현재 중앙행정기관, 지방자치단체 및 교육청, 대학, 기타 공공기관의 기록물을 관리하고 있다. 국사편찬위원회는 2004년부터 2010년까지 10개년 계획으로 각 지역에 산재해 있는 근 현대 지역사료를 시군별 자료수집과 더불어 주제별 자료조사도 병행하고 있다. 한국학중앙연구원은 초기에는 현대사연구소를 중심으로 근 현대사사료를 수집하였다. 1997년부터 2005년까지는 수집된 사료는 해방기를 전후한 자료들이다. 셋째, 국가기록원의 중앙기록관리시스템 및 나라기록포털시스템, 국사편찬위원회의 한국사데이터베이스시스템, 한국학중앙연구원의 한국향토문화대전시스템의 특성이 기술되었다. 넷째, 세 기관 사이의 공동협의회의 구성은 국가기록물관리위원회 산하에 '근 현대 지역사료 협의회'를 두고, 국가기록원이 주도적인 역할을 하고 각 기관과 연대해 나가며, 근 현대 사료의 디지털화된 자원의 공유를 위한 기술개발, 콘텐츠의 이용과 개선, 공공의 이용과 참여, 국제적인 이용이 가능하도록 하려면 국가기록원, 국사편찬위원회, 한국학중앙연구원의 분담된 역할이 있어야함을 강조하였다.
This paper presents a system architecture and database of construction quality management system which encourages real time information tracking and monitoring. It improves the real time quality record tracking by using QR code technology in the project delivery. The advantages and issues relative to QR code and the database structures of the tracking system are presented. Conventional project scheduling system, operation modeling and analysis system, and quality management system are hybridized using QR code technology. The system improves project quality management by tracking the atomic tasks which consists of a construction process at the lowest level of construction hierarchy. It analyzes the quality records to determine the causes of abnormality and/or nonconformity. Using QR code technology, the construction quality management system may be more effective than the conventional one. It was confirmed that the quality management processes in construction project delivery can be more visible and controllable by integrating QR code technology, project scheduling system, and quality management system.
The 3th International Conference on Construction Engineering and Project Management
/
pp.747-753
/
2009
Planning the construction for a system of bored piles in building foundation engineering is (1) to predict the time duration required to complete all the bored piles with due consideration of relevant engineering factors and site constraints; then (2) to predict the total project time generally by aggregating the predicted working duration for construction of each bored pile. The duration for construction of an individual bored pile results from analyzing various working sequences and different activity duration (such as predrilling, excavation, steelfixing, air-lifting, and concreting, etc.), which is informed by experiences and site records of previous projects. However, determining the project duration for constructing many bored piles on one site is much more complicated than adding up the time duration for individual piles. In practice, project schedules are often found to be unrealistic and incorrect during the construction stage. This is because construction planning is not based on a exhaustive and comprehensive evaluation of site factors, such as site layout plan, site constraints, quality control, environmental control, safety control and logical relationships between different trades. In this paper, we identify those factors based on a foundation engineering site in Hong Kong with ninety-seven bored piles and address their effects on uncertainties in activity time and project time.
In the Spring of 2000, the Banking Commission of the ICC decided to appoint a working group to draft a supplement to the UCP 500 to clarify the position regarding electronic presentation under a documentary credit. Provisions was drafted to supplement its existing rules for documentary credit, that is, UCP 500. These new provisions known as Supplement to UCP 500 for Electronic Presentation was approved by the ICC Banking Commission at the beginning of November 2001 and came in force as of 1 April 2002 The eUCP covers matters such as definitions of key terms such as electronic record, electronic signature, format, paper document, received. An eUCP Credit must specify the formats in which electronic records are to be presented and if not, electronic records may be presented in any format. Electronic records may be presented separately and need not be presented at the same time. The purpose of this paper is to understand the main substance of eUCP and to facilitate the introduction of electronic letter of credit by studying the problems and revision of eUCP and new electronic UCP. The main substances of eUCP are electronic address as place for presentation of electronic records, flexibility of the formats of electronic records to be presented, endowment of the notice of completeness of presentation to the beneficiary, one electronic record satisfying one or more originals or copies of an electronic record, the electronic records to be examined including the electronic record at the hyperlink to an external system or the referenced system, no remark as to the time period for the examination of documents. The Roles of eUCP are the Promotion of the Electronic Trade, the Supply of Basis on the Uniform Rules for Electronic Letter of Credit, the introduction of Electronic Trade Model. The characteristics of eUCP are a supplement to the UCP, no address of any issues relating to the issuance or advice of Credit electronically, independence of specific technologies and developing electronic commerce system, that is, Bolero Service. The Problems of eUCP are flexibility of format of electronic record, heavy burden on the side of banks, and the problems regrading the number of presentation, the notice of completeness of presentation, no provision in regard to the time to examine the electronic records, and representation of the electronic records. In the revision of eUCP to resolve the problems, the things to be taken into consideration are as follows; the designation of the format allowing the banks to examine electronically, prohibition of the paper documents, the development of the system receiving the electronic records, the addition of the reception notice on the side of the banks, the setting of the time to examine the electronic records, the construction of the backup system or the dual processing system.
기록물의 생산주체라 할 수 있는 처리과를 접점에서 관리하고 있는 기록관의 기능 및 역할이 매우 수동적이고 국한적임에 따라 이에 대한 변화와 더불어 업무 및 조직의 확장에 대한 요구가 많아지고 있다. 기록관 기능 및 역할을 강화하기 위해서는 제도적 장치의 보완과 더불어 기록관 소관 기록물에 대한 보존 및 활용의 가치의 규명, 다양한 업무 개발, 독자적 기록관 건립 등을 통해 내실화를 이루어낼 필요성이 있다. 이에 본고에서는 법무부 기록관의 건립 배경과 과정, 남은 과제에 대하여 살펴보고, 해당 사례를 토대로 중앙행정기관이 기록관 건립 시 필수적으로 고려해야 하는 사항과 절차는 무엇이 있는지에 대하여 알아보고자 한다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.