• Title/Summary/Keyword: Construction Project Performance

Search Result 955, Processing Time 0.026 seconds

A Development of Project Performance Predicting System(PPS) considering Construction Project Characteristics (건축 프로젝트의 특성을 고려한 성과 난이도 예측 시스템 개발)

  • Ko, Young-Jin;Cha, Hee-Sung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.1
    • /
    • pp.62-72
    • /
    • 2011
  • Currently, The failure of construction project is increasing to be caused by a changing construction environment. According to this circumstances, Researches of project success factors affecting performance have been presented to develop strategies for efficient construction project management in the construction industry. However, Conducting efficient construction project management is difficult because project manager could not know which project success factors can be improved or not. Especially, although the project characteristics were derived the level of difficulty for performance, research of the project characteristics which could not be improved as influence factor to performance is lacking. Therefore, This paper has developed the Performance Predicting System(PPS) with Fuzzy set theory to establish. PPS has been developed to establish efficient project management strategies and to save time and effort. As Contractor inputs the project characteristics, PPS can predict the level of difficulty of performance.

The Effect of Conflict on Collaboration and Performance in Nuclear Power Plant Construction Projects (원자력 발전소 건설 프로젝트에서 갈등이 협력과 성과에 미치는 영향에 관한 연구)

  • Yu, Yeong Seok;Jo, Dong Hyuk;Choi, Hye Soo
    • Journal of Korean Society for Quality Management
    • /
    • v.47 no.3
    • /
    • pp.553-569
    • /
    • 2019
  • Purpose: The purpose of this study is to identify the impact of conflicts and cooperation on project performance in the nuclear power plant construction project, thus contributing to the successful performance of project participants and the achievement of project objectives. Methods: This study used a method of conducting a survey of participants in the nuclear power plant construction project and verifying the hypothesis statistically. Results: The results of this study are as follows; First, role conflicts and relationship conflicts have negative effects on collaboration. Second, role conflicts have a negative effects on project performance, but conflict in relation has no significant effects on project performance. Third, collaboration has a positive effects on project performance. Finally, the communication quality in the relationship between conflict and collaboration has been shown to have a Moderated effect. Conclusion: In order to achieve the goal in the nuclear power plant construction project, the level of collaboration should be improved based on conflict management among project participants.

UTILITY-BASED PERFORMANCE MEASUREMENT SYSTEM (UBPMS) FOR COMPARISON OF CONSTRUCTION PROJECTS

  • Ki-Hyun Kim;Hee-Sung Cha;Ju-Yeoun Han;Il-Han Yu
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1509-1514
    • /
    • 2009
  • CII BM&M(Benchmarking & Metrics) in USA and DTI(Department of Trade and Industry) in UK have built up systems that enable performance measuring and made the results of performance measurement comparable between projects to utilize them as benchmarking tools. By comparing the results of performance measurement, it is possible to grasp the success level of project management and to establish the direction of management. However, construction projects are much diversified and even those projects with the same work type have different attributes. Therefore, simply comparing the results of project performance measurement without considering the characteristics of projects is not justifiable and affects the reliability of the benchmarking results. Therefore, to solve this problem, this study presents a methodology that makes it possible to compare the individual construction projects considering various characteristics. The benefits and importance of project characteristics to overall project performance will be quantitatively expressed and they will be reflected on the results of performance management. By maximally converting multiple projects with different characteristics into the same projects through a new methodology to convert different projects into the same level utilizing such utility-bases and comparing the performances of those projects, project performance results can be utilized in project management as a tool for more accurate decision making and as a robust benchmarking tool.

  • PDF

Development of a Construction Performance Causal Map Using System Dynamics (시스템 다이내믹스를 이용한 건설성과 인과지도 개발)

  • Kang, Jin-Young;Park, Hee-Sung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.2
    • /
    • pp.63-68
    • /
    • 2009
  • Construction Performance measurement and management has been interested by construction practitioners. However, current construction project management practices are related to short-term improvement plans rather than long-term and systematic approaches based upon performance analysis. AR a result, there is a need for developing of a collaborative plan over project life cycle. Therefore, this paper reviews extensive literature and proposes the construction performance estimating model using a system dynamics. The paper proposes casual maps for planning, design, procurement, and construction phases. Each casual map includes all performance indicators and factors that impact on performance directly or indirectly. These casual maps that were developed by system thinking will enhance the understanding of the relationships among performances and factors. After further data gathering, these models can be used to estimate construction performance and eventually these will save project costs and shorten project schedule.

INTEGRATED PERFORMANCE MANAGEMENT FOR WHOLE PHASES OF URBAN RENEWAL MEGAPROJECTS

  • Heedae Park;Kang-Wook Lee;Seung Heon Han
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1463-1467
    • /
    • 2009
  • Construction projects are vulnerable to diverse internal and external factors, requiring systematic and consistent performance management along the entire life cycle of a project. In particular, urban renewal projects have a range of performance measures, including policy reconciliation and permits, project development, project financing, design, construction, and occupancy and maintenance. This requires a program-level megaproject approach, which integrates each stage of a project as well as variety of stakeholders' interests in pursuing a project from different perspectives. However, previous research on performance management has focused especially on the limited scopes of factors, including cost, quality, and schedule at the project level or on financial factors at the firm level. Given the lack of current approaches, this study suggests an integrated and systematic performance management scheme to control urban renewal megaprojects at the broadened perspectives of the program level. To this end, this study adopts the balanced scorecard approach and elicits key performance indices associated with various project configurations. Finally, an algorithm is presented for quantitatively assessing the level of performances along whole life cycle of urban renewal megaprojects.

  • PDF

THE IDENTIFICATION OF MALAYSIAN CONTRACTOR SATISFACTION DIMENSIONS: A STRATEGY FOR CONTINUOUS IMPROVEMENT

  • Md Asrul Nasid Masrom;Martin Skitmore;Adrian Bridge
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.335-339
    • /
    • 2011
  • The unique characteristics of the construction industry - such as the fragmentation of its processes, varied scope of works and diversity of its participants - are contributory factors to poor project performance. Several issues are unresolved due to the lack of a comprehensive technique to measure project outcomes including: inefficient decision making, insufficient communication, uncertain site conditions, a continuously changing environment, inharmonious working relationships, mismatched objectives within the project team and a blame culture. One approach to overcoming these problems appears to be to measure performance by gauging contractor satisfaction (Co-S) levels, but this has not been widely investigated as yet. Additionally, the key Co-S dimensions at the project level are still not fully identified. This paper concerns a study of satisfaction dimensions, primarily by a postal questionnaire survey of construction contractors registered by the Malaysian Construction Industry Development Board (CIDB). Eight satisfaction dimensions are identified that are significantly and substantially relate to these contractors - comprising: project cost performance, schedule performance, product performance, design satisfaction, site safety, project profitability, business performance and relationships between participants. -Each of these dimensions is accorded different priority levels of satisfaction by different contractors. The output of this study will be useful in raising the awareness and understanding of project teams regarding contractors' needs, mutual objectives and open communication to help to deliver a successful project.

  • PDF

Selecting Optimum Management Practices according to Project Characteristics for Improving Project Performance (건설 프로젝트 특성에 따른 성과 제고가 가능한 최적 공사 관리기법 선정 방안)

  • Ko, Young-Jin;Cha, Hee-Sung;Shin, Dong-Woo;Kim, Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.1
    • /
    • pp.3-13
    • /
    • 2012
  • The importance of project performance management as an alternative for solving problems is rising, which are followed by the hardships of managing construction project in the construction industry. This research classifies and applies the improvements made by the operator's work, in order to apply factors of success on the construction project, as performance management factors. In addition, in order to predict the results reflecting the project characteristic of performance management factor un-improvable by the operator in the initial stage of construction, the effect of project characteristic to the performance was drawn by performance difficulty. Also, in order to improve the predicted performance, researches on setting valid best practices according to the performance territory through a correlation analysis between the best practices improvable through the operator's work, and the performance was made.

A Conceptual Framework to Study the Effectiveness of Interface Management in Construction Projects

  • KEERTHANAA, K.;SHANMUGAPRIYA, S.
    • Journal of Construction Engineering and Project Management
    • /
    • v.9 no.3
    • /
    • pp.1-21
    • /
    • 2019
  • The management of mega construction projects which incorporate a large number of stakeholders, technologies, data, work culture etc., is cumbersome. The experts in the construction arena advocate that interface management serves as a precise tool in resolving these conflict points due to the intricate nature of the construction projects. Interface management is a current trending management practice in the construction industry which is also a beneficiary to mega/fast track projects in enhancing the project performance. The main objective of this study is to validate a model for assessing the relationships among interface management, IT applications, project performance & project benefits. The mediating effect of interface management in relationship between project performance & interfacial factors was also investigated. The research model was validated using PLS-SEM (Partial Least Square-Structural Equation Modelling) approach. Data were collected from clients, contractors, consultants in large scale projects through questionnaire survey and smart-PLS software was used to analyse the conceptual model. The research model comprises eleven hypothesis and the significance of these hypothesis were tested using T- statistics values. The research implies that people/participants factor is greatly influenced by interface management with the path coefficient of 0.608 and also enhancement of project's schedule performance due to the interface management is strongly appealing (Path coefficient = 0.711). The results also reveal IT application is significantly associated with interface management practice (Path coefficient =0.723) and also the effect of IT application on project performance (schedule, cost, quality & safety) is successfully mediated through interface management practice. The practical application of this validated model was done through case study. The case study aims at measuring the impact of interface management on interfacial factors and role of interface management in improving the project performance in the construction organisations.

Investigation of Key Factors to measure on-site Performance of a Construction firm

  • Lee, Young-Dai;Kim, Jung-Ki;Acharya, Nirmal Kumar
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.6
    • /
    • pp.246-262
    • /
    • 2007
  • The performance of projects has always been an area of interest in the construction industry. Roles of all construction supply chain partners are necessary; however the role of a contractor firm in the construction project is pivotal. So, this research intended to explore a Construction Firm's performance criteria which could measure the level of performance of that firm in an ongoing project. Data was collected from construction professionals working in three principal project participant organizations, namely Owner, Consultant and Contractor. A total of 113 nos. of performance measuring items were sorted from literature review and used to collect data. Statistical tools processed by SPSS program was employed to analyze the data. Out of total 113 items, only 65 nos. of variables were found to be acceptable to every population group of this study. Factor analysis revealed 12 key performance predicting factors (KPPF) with 53 predictive indicators. 12 KPPFS with index weight are: work progress and smoothening (9.3%), change order management and work accuracy (9.1%), business relationship building (8.1%), adequacy of construction work procedure (8.6%), quality performance (8.0%), health and site safety adequacy (8.8%), Innovative contractor (8.0%), adequacy of construction site information (6.8%), compliance with contract plan/specification requirements (8.9%), creditworthiness and financial capability (8.3%), intra-agency relationship and responsiveness (7.0%) and resource management (9.2%). These results could be useful to project management body to evaluate performance of its contractor firm on site as well as the contractor itself to assess own performance and its subcontractors on-site.

Assessing Indonesian Construction Regulations on Quality and Performance

  • Willar, Debby;Rumbayan, Rilya;Manueke, Selfy;Mandagi, Robert
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.481-485
    • /
    • 2015
  • Indonesian construction companies are currently facing high competition both among themselves and with global construction companies. In order to address this issue, the Government of Indonesia has enacted specific regulations and policies relating to the development and implementation of quality management systems (QMSs) ISO 9001 based in construction, acknowledging that the consistency of construction project quality requires a formal quality system as a guarantee to raise quality standards at all project stages. The research has been undertaken to examine the effectiveness of the regulations and policies against several key performance indicators (KPIs) of the ISO 9001 Indonesian construction companies. A comprehensive review of the relevant regulations and policies together with interviews with the Government and National Construction Services Development Board recommend possible additional guidelines and supporting quality system, which intends to measure contractors' project output against defined standards as well as to assess their performance among other similar service providers. The outcomes of the research contribute to the development of the Indonesian own construction industry quality measurement and assessment system.