• 제목/요약/키워드: Construction Progress Measurement

검색결과 65건 처리시간 0.021초

AUTOMATED PROGRESS MEASUREHEMT FOR CONTRUCTION PROJECT

  • Seunghee Kang;Youngsoo Jung
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1068-1074
    • /
    • 2009
  • The progress is widely used as a critical index for successful construction project management. In spite of the importance of progress measurement, the excessive management effort to collect and maintain detailed data has been highlighted as a major barrier to measurement of highly accurate progress. In order to reduce the required workload and to enhance accuracy, several researches have been conducted. These researches can be categorized into two groups. First group focuses on automated data collection utilizing advanced technologies only for limited construction tasks. The second group is a research area where the standard progress measurement methodologies encompassing entire construction tasks are investigated. Topics include the adjusting the level of details, standardizing work processes, and applying flexible WBS. However, the techniques for automated data collection are not fully investigated yet in the second group. Combining these two research areas can provide a solution for more effective progress management in terms of enhancing accuracy and optimizing workload. However, there has been no comprehensive research addressing these two research groups in an integrated manner. In this context, the purpose of this paper is to propose a methodology that identifies the most suitable measurement method and data acquisition technology (e.g., GPS, RFID, etc.) for entire construction tasks of a project. The proposed methodology in this paper will be able to facilitate the selection process of data acquisition technologies for entire construction tasks of a project and to support the overall enhancement of automated progress management.

  • PDF

안면인식(Face Recognition)을 활용한 진도관리 자동화 (Automated Progress Measurement and Management using Face Recognition)

  • 김남준;정영수
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2013년도 춘계 학술논문 발표대회
    • /
    • pp.160-161
    • /
    • 2013
  • Progress measurement is one of key tasks for cost and schedule management in construction management. However, there has been shortage of effort to implement for automated progress measurement. This paper proposes to use a face recognition (FR) technology for automated progress measurement and management in construction sites. The FR technology can acquire detailed progress data that includes the in and out information of labors by location. The expected effectiveness of the proposed system is to provide accurate labor information for progress measurement by utilizing automated data acquisition technology (DAT) with high-speed reading face. In addition, it could be applied to real-time safety and quality management by using the camera images.

  • PDF

공정-원가 통합관리를 위한 진도관리 개선 방안 (A Study on the Improvement of Construction Progress Management for EVMS)

  • 이규현;박찬정;최인성
    • 한국건축시공학회지
    • /
    • 제2권3호
    • /
    • pp.155-162
    • /
    • 2002
  • The Ministry of Construction-Transportation released a plan about EVMS in 1993 in order to prepare measures for an efficient public construction project, and prepared an enforcement proposal concretely in June for 2000 years, and have enforce a public project by an example with a target. Therefore, accurate analysis and evaluation about field progress are required for efficient management of a building construction, and must be established building construction management system for fast action about a problem However, unified management cannot be consisting because a work progress system is different from details estimate system within a country. and There is not still a definite standard in progress measurement for an application of EVMS. A purpose of this study is to present an improvement about a problem of progress measurement for an application of EVMS. The contents of a study, inquired into a progress measurement method and a standard to use in the field of a public construction and private construction and Checks a problem and presented an improvement item necessary for and is as follows. $\circled1$ must establishes a control account and progress measurement standard. $\circled2$ must manage progress in a activity viewpoint. $\circled3$ must use an accurate CPM process management technique.

건설공사의 진도율 산정 방법에 관한 연구 (A study on progress measurement method of a construction project)

  • 박세정;김수용
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2003년도 학술대회지
    • /
    • pp.450-453
    • /
    • 2003
  • 건선 사업에 일어서 초기 계획과 기성의 주기적이고 반복적인 비교 검토는 매우 중요하다. 이를 위해서는 정확한 현장 실적자료가 제공되어야하고, 작업량을 객관적으로 계량화하는 기준 및 진행상황을 정확히 반영한 진도율 산정이 필요하다. 이러한 진도율 산정을 위해서는 전체 사업이 명확한 작업범위를 갖는 단위작업으로 분할되어, 각 단위 작업에 필요한 정보가 할당되어야 한다. 국내 건설 사업에서와 같이 내역중심의 사업관리가 이루어지고 있는 상황하에서는 각 단위작업의 물량, 공사비 둥을 포함한 비용 정보 뿐만 아니라 일정 정보를 반영한 진도율 산정 방법이 필수적이며, 본 연구에서는 두 가지 정보에 의한 가중 진도율 산정방법을 제시하고자 한다.

  • PDF

석유화학 플랜트 EPC 사업의 진도율 산정표준의 제안 (A Standard Method for Progress Measurement in a Petrochemical Plant EPC Project)

  • 조홍연;유호선
    • 플랜트 저널
    • /
    • 제7권4호
    • /
    • pp.77-87
    • /
    • 2011
  • In proportion to continuing growth of overseas plant market and the trend of its mega scale of the project, the importance of management is significantly emphasized for the successful execution of the project. And it is recognized that progress control is the most important management item amongst the others in the management. Progress control is importance of progress measurement for performance measurement and process control of project, but it is hardly obtainable securing the objectivity in the progress measurement since the progress measurement are being applied differently in accordance with the project conditions and the experience level of the person in charge for the progress control. This study has conducted as following to propose a standard method for progress measurement in a petrochemical plant protect. Domestic and overseas plant projects are investigated variously with the applied method of progress measurement, and the deduced problem of progress measurement. And then standard method for progress measurement of engineering, procurement, construction and commissioning has been proposed according to comparison and analysis of practices in domestic & overseas plant project, procedures for progress control in the globally reputed petrochemical client, company rules and recommendation of the expert in progress control.

  • PDF

건설진도율 산정을 위한 진도관리단위에 관한 연구 (Standardized Progress Measurement Package)

  • 정영수;강승희;진상윤;김예상;정문헌;박순찬
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2004년도 제5회 정기학술발표대회 논문집
    • /
    • pp.565-570
    • /
    • 2004
  • 건설진도율은 프로젝트 성과 측정 및 진행관리의 중요한 요소 중의 하나로서 이용되고 있으나, 작업 진도 산출기준 및 방법이 현장 상황에 따라 다르게 운영되기 때문에 진도 산출의 정확성이 각 현장 특성에 크게 의존되고 있는 실정이다. 즉, 현장별 공사 진행 상태 비교 시 상당한 오류-가 발생될 수 있으며, 그 신뢰도 역시 매우 떨어질 수 있다는 것을 의미한다 따라서 본 연구에서는 모든 현장의 공사 진행 상태를 같은 기준으로 파악이 가능한 전사 차원으로서의 공통 기준인 진도관리단위 및 평가요소를 정의하며, 이와 더불어 진도관리단위 적정성 평가 방안 및 진도산정모델의 프로세스를 제안하고자 한다.

  • PDF

사물인터넷을 활용한 BIM기반 건설 진도율 모니터링 시스템 (BIM based Construction Progress Monitoring System Integrated with IOT)

  • 손상혁;이동은
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2015년도 춘계 학술논문 발표대회
    • /
    • pp.130-131
    • /
    • 2015
  • Accurate construction progress measurement is an important issue for successful project delivery. This paper presents a method that keeps track of the progress measurement involved in construction operations and facilities visualization of the data using BIM and IOT. To verify the method, a residential house project was used for the case study. Test case verifies the usability and validity of the method implemented in the system.

  • PDF

대규모 건설프로젝트의 진도율 측정 프레임워크 개발에 관한 연구 (Development of Progress Measurement Framework for Mega Construction Project)

  • 고성진;지석호;김진우;송준호
    • 대한토목학회논문집
    • /
    • 제37권2호
    • /
    • pp.419-425
    • /
    • 2017
  • 다양한 시설의 건설, 다수 이해관계자의 참여, 긴 사업기간 등의 복잡성으로 인해 대규모 건설프로젝트는 이를 관리함에 있어 어려움이 있다. 효과적인 대규모 프로젝트관리를 위해서는 합리적인 진도율 측정이 중요하고, 이를 위한 다양한 방법들이 제안되었다. 하지만 기존의 방법들은 단일 또는 일부 시설의 건설 프로젝트로 한정하였기 때문에 다양한 시설들을 건설하는 대규모 프로젝트에 적용하는 데 한계가 있다. 따라서 본 연구는 대규모 건설프로젝트의 특성을 반영한 진도율 측정 프레임워크를 제안함을 목표로 한다. 프레임워크는 작업분류체계 개발, 주요시설별과 하위시설별 가중치 산정, 통합 진도율 산정으로 총 4가지 단계로 이루어져 있다. 본 프레임워크를 검증하기 위해서 세종시를 대상으로 사례연구를 수행하였고, 활용 가능성을 검증할 수 있었다. 본 연구를 바탕으로 대규모 건설프로젝트의 진도율을 보다 합리적으로 측정할 수 있고 효과적인 프로젝트관리가 이루어질 것으로 기대된다.

성과측정유닛을 활용한 건설 비용 - 일정 통합관리 방안 (Construction Cost-Schedule Integration Management Methodolgy by using Progress Integration Unit)

  • 강남희;최재현
    • 한국건설관리학회논문집
    • /
    • 제18권3호
    • /
    • pp.42-51
    • /
    • 2017
  • 건설 프로젝트의 생산과정에서 성과를 지속적으로 측정하고 평가하는 것은 프로젝트관리의 성공적인 수행을 위한 핵심요소이다. 성과는 일반적으로 목적물에 할당 된 공정과 원가 관련 정보를 정량적으로 평가함으로써 측정되며, 객관적인 성과측정을 위해 공정과 원가가 통합적으로 계획 관리되어야 한다. 본 연구는 공정과 원가의 통합 모델을 통해 성과 측정 방법론을 제안하고 진도관리의 기반을 마련하는데 목적이 있다. 이를 위해 공정계획과 원가계획의 표준화된 업무 프로세스를 개발하였고, EVM과 기존의 통합 모델을 분석하여, 성과측정 유닛을 활용한 WBS와 CBS의 통합 방법론을 제시하였다. 플랜트 프로젝트의 시공단계를 중심으로 공통 성과측정의 대상은 공종으로 선정하여 성과측정 유닛을 규정하고 공정과 비용정보를 연계시켜 성과비율을 산정하였다. 또한 리소스의 적용시 원가요소 중 소모성자원의 비용을 배제하여 진도측정의 객관성을 향상하였다. 본 결과는 실제 플랜트 사례 프로젝트에 적용하여 실증되었으며, 개발된 방법론은 향후 프로젝트의 성과를 보다 객관적인 기준으로 평가할 수 있어 보다 효과적인 진도관리 방법이 될 것으로 판단된다.

내역물량 측정에 의한 건설공사진도율 산정시스템 (Construction Progress Measurement System by tracking the Work-done Performance)

  • 최윤기
    • 한국건설관리학회논문집
    • /
    • 제4권3호
    • /
    • pp.137-145
    • /
    • 2003
  • 건설공사관리체계는 실적자료를 바탕으로 운영되어야 하며, 공사실적을 정확하게 파악하기 위해서는 합리적인 건설공사진도 율 측정기준 및 그에 따른 진도 율 산정방법이 필요하다. 본 연구에서는 건설공사관리체계 구축에 필수적인 건설공사진도율 산정시스템 개발 및 그 시스템의 합리적인 운용 방안을 제시하였다. 그 방법으로서 분할된 단위작업들은 공사 진행에 따라 집행된 내역물량을 기준으로, 상위레벨의 작업범위에 대하여는 실행기성(earned value)을 바탕으로 건설공사의 진도 율을 산정 할 수 있는 시스템(construction progress measurement system; CPMS)을 제시하였다 일반 PC의 Window환경에서 제공되는 프로그래밍 인터페이스(interface) 기능인 ODBC(Open DataBase Connectivity)는 상이한 프로그램간의 데이터 교환을 통해 정보공유를 가능케 하고 있다 본 연구에서 제시하는 건설공사진도 율 산정 시스템은 ODBC를 통해, 상용 일정관리프로그램을 활용해서 생성된 데이터를 그대로 이용하고, 시스템 내에서 생성된 데이터는 일정관리프로그램에 갱신(update)된 정보로 제공된다. 제안된 건설공사진도 율 측정시스템의 실용화를 촉진시키기 위해서는 진도 율 측정에 의한 수치 값을 분석하여 향후 공사의 전망 등을 예측할 수 있어야 하는데 이에 대한 연구가 필요하다.