• Title/Summary/Keyword: Construction Program

Search Result 2,446, Processing Time 0.027 seconds

Development of Vibration Prediction Program of Gas Pipeline by Construction Vibration (건설진동에 의한 가스배관의 진동예측 프로그램 개발)

  • Jeong S. Y.;Hong S. K.;Kim J. H.;Koh J. P.
    • Journal of the Korean Institute of Gas
    • /
    • v.5 no.2 s.14
    • /
    • pp.30-35
    • /
    • 2001
  • Presently, working gas pipelines are being subjected to the influence of construction vibration. Especially on subway and road construction, gas pipelines are being influenced to construction vibration caused by use of construction equipment, passage of a large-sized vehicle and blasting. Buried gas pipelines are subjected to the influence of vibration caused by blast in the vicinity of pipeline, exposed gas pipelines are subjected to the influence of vehicle vibration. Therefore, in the study, it is developed to vibration prediction program of gas pipeline by analyzing measured construction vibration. This program is able to predict vibration of gas pipeline according to field conditions by using the results of structural finite element analysis and empirical equation by reliability analysis. And, this program contains the database of construction vibration. Additionally, this program is able to compute estimated blast vibration equation using measured blast vibration data in the field and to form graph of allowable charging gunpowder per delayed-action with the change of blast velocity. Therefore, field workers are able to predict construction vibration around gas pipeline and estimate safety of gas pipeline.

  • PDF

Development of Program Management Information System Prototype to Support Urban Regeneration Based on System Requirement Analysis (시스템 요구사항 분석을 통한 도시재생사업 수행을 지원하는 종합사업관리 시스템 프로토타입 개발)

  • Yeom, Ji-Woong;Kim, Doo-Whan;Ahn, Byung-Ju;Kim, Ju-Hyung;Kim, Jae-Jun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.4
    • /
    • pp.85-92
    • /
    • 2009
  • Urban regeneration projects have been actively proceeding all over Korea. Urban regeneration has become a critical issue in the domestic construction industry, with environmental-friendly construction and high-rise buildings being emphasized. Because these projectstend to become complex, urban regeneration projects require interest and approach on a level of program management that includes traditional project management. This paper develops aprototype for a new program management information system of a supports the promotion of urban regeneration projects through the deduction of the requirements about system. The prototype of the program management information system includes functions that supply diverse information, support the process and legislation of an urban regeneration project, manage stakeholders, support decision-making, estimate and manage program risks, and manage the program level.

Estimating on The Construction Costs for Public Kindergarten Buildings (공립단설유치원 신설 소요경비 산정)

  • Park, Sung-Chul;Park, Hee-Won
    • The Journal of Sustainable Design and Educational Environment Research
    • /
    • v.13 no.1
    • /
    • pp.1-14
    • /
    • 2014
  • The purpose of this study is to propose different construction costs based on the number of kindergarten classrooms. Literature review reorganized the space program for kindergartens. For suggesting the room sizes of each spaces, this paper collected the three types of analysis; 1) the previous researches, 2) field survey, and 3) construction drawings. Based on the results, building sizes for the individual class sizes were presented. And, this paper made a standard priced BOQ(Bill of Quantity) through analysis on the existing priced BOQ. Finally, the recommendable construction costs were proposed by applying the building sizes to the standard priced BOQ. The practitioners of school districts and government organizations can make appropriate budgets considering the building sizes.

Performance assessment of precast concrete pier cap system

  • Kim, T.H.;Kim, Y.J.;Shin, H.M.
    • Computers and Concrete
    • /
    • v.13 no.4
    • /
    • pp.501-516
    • /
    • 2014
  • The purpose of this study was to investigate the performance of precast concrete pier cap system. The proposed precast pier cap provides an alternative to current cast-in-place systems, particularly for projects in which a reduced construction time is desired. Five large-scale pier cap specimens were constructed and tested under quasistatic monotonic loading. The computer program, RCAHEST (Reinforced Concrete Analysis in Higher Evaluation System Technology) was used for the analysis of reinforced concrete structures. A bonded tendon element is used based on the finite element method, and can represent the interaction between the tendon and concrete of a prestressed concrete member. A joint element is used in order to predict the inelastic behaviors of segmental joints with a shear key. This study documents the testing of the precast concrete pier cap system under monotonic loading and presents conclusions and design recommendations based on the experimental and analytical findings. Additional full-scale experimental research is needed to refine and confirm design details, especially for actual detailing employed in the field.