• Title/Summary/Keyword: Construction Program

Search Result 2,431, Processing Time 0.063 seconds

A model for evaluating the fire resistance of contour-protected steel columns

  • Kodur, V.K.R.;Ghani, B.A.;Sultan, M.A.;Lie, T.T.;El-Shayeb, M.
    • Structural Engineering and Mechanics
    • /
    • v.12 no.5
    • /
    • pp.559-572
    • /
    • 2001
  • A numerical model, in the form of a computer program, for evaluating the fire resistance of insulated wide-flange steel columns is presented. The three stages associated with the thermal and structural analysis in the calculation of fire resistance of columns is explained. The use of the computer program for tracing the response of an insulated steel column from the initial pre-loading stage to collapse, due to fire, is demonstrated. The validity of the numerical model used in the program is established by comparing the predictions from the computer program with results from full-scale fire tests. Details of fire tests carried out on wide-flange steel columns protected with ceramic fibre insulation, together with results, are presented. The computer program can be used to evaluate the fire resistance of protected wide-flange steel columns for any value of the significant parameters, such as load, section dimensions, column length, type of insulation, and thickness of insulation without the necessity of testing.

Man-hour Reduction with a Regulatory Review Program for a Pressure Vessel Design (관련규정 검토 프로그램 활용 시 압력용기 설계시간 단축 효과)

  • Joo, Jung-Min;Yoo, Ho-Seon
    • Plant Journal
    • /
    • v.8 no.1
    • /
    • pp.60-72
    • /
    • 2012
  • In this study to reduce the review time of the pressure vessel regulations pressure vessel legislation review program has been developed. During the course of this research program to develop the domestic construction in a real project, saving 47% of the time was found.

  • PDF

Representation of Hull Form by Aitken's Iterative Interpolation Methods (逐次揷間法에 依한 船型의 數値表現法에 關하여)

  • Kim, Hyo-Chul;Yang, Yeong-Sun
    • Bulletin of the Society of Naval Architects of Korea
    • /
    • v.14 no.3
    • /
    • pp.1-4
    • /
    • 1977
  • The computer aided ship design and construction has become very popular one in a ship yard recently. For one of such a purpose a program is developed with Aitken's iterative interpolation method. From the sample calculation we can conclude that the program has a reliable acquracy for the calculation of hydrostatic data or loading manual. And also the program can be applicable to a ship construction by careful selecting of input data.

  • PDF

Analysis of the Segmentally Erected Prestressed Concrete Box-Girder Bridges and Pre & Post-Processing (PC 박스거더교량의 해석 및 전후처리 시스템 개발연구)

  • 오병환;이형준;이명규;전세진;박철림;김영진;임선택
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1995.04a
    • /
    • pp.385-390
    • /
    • 1995
  • In segmentally erected bridges, the structural systems are changed as the construction stages progress and redistribution of member forces occurs due to time dependent effects of concrete and relaxation of perstressing steel. Therefore, structural analysis is required at each construction stage. In this study, nonlinear analysis program of the segmentally erected prestressed concrete box girder bridges is developed to raise the efficiency in making input file for the main program and analysis of the results produced by the main program.

  • PDF

Development of Programs for Menu Planning by Using Personal Computer (PERSONAL COMPUTER를 이용한 식단 관리의 전산화 연구)

  • 문수재
    • Journal of the Korean Home Economics Association
    • /
    • v.24 no.4
    • /
    • pp.69-74
    • /
    • 1986
  • The present study investigated the use of a computerized program for construction of menu. The Computer used for this study was the personal computer type IBM-PC OA-16 XT. The program itself used the computer's“DBASE Ⅲ”. Preparation for computer programming: 1) Assigned special code number of menu and input data 2) Assigned special code number of recipe and input data 3) Menu construction The computerized program for the planning of menu according to user's condition was developed.

  • PDF

DEVELOPMENT OF A WEB-BASED COST AND DURATION MANAGEMENT SYSTEM FOR MEGA-PROJECTS

  • Chang-Taek Hyun;Run-Zhi Jin;Myoung-Jin Son;Seung-Yoon Shin
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.510-515
    • /
    • 2011
  • Urban renewal projects, in the form of mega-projects, are being actively implemented both nationally and internationally to revitalize inactive cities. These programs, however, are difficult to manage efficiently due to their need for a large budget over a long period of time and due to conflicts with stockholders. Moreover, existing cost and duration management systems are structured with emphasis on the design and construction stage of unit projects, thus limiting their application to long-term mega-projects that are integrated with various facilities. To solve these problems, this study developed a web-based system that can collectively manage the cost and duration of mega-projects at a program level. The unit modules included in the system--CBS organization, construction cost and duration prediction, and total cost and duration prediction--can support decision-making at the early stage of the program. Furthermore, the modules, which include contract management, execution management, change management, and program progress management, support the program operations for its successful accomplishment. The web-based cost and duration management system developed in this study is expected to be used as a valuable tool that supports the successful accomplishment of mega-projects through their efficient management throughout their life cycle.

  • PDF

The study on frame work of developing and modification with expert system program software (전문가 시스템소프트웨어 유지 보수에 있어서 프레임워크에 관한 연구)

  • Chang-Duck Jung
    • Journal of the Korea Computer Industry Society
    • /
    • v.5 no.4
    • /
    • pp.503-510
    • /
    • 2004
  • The summary of this paper is as follows. The literature on existing expert system maintenance software technique are reviewed in Module program, a case of assembly line process problem at construction industry and planning expert system to solve this problem at construction as a standard configured process system are discussed. the regenerative expert system approach for the construction process expert system and its example for the assembly line construction process appear in the research also, this paper shows the architecture and some feature of the CES.(Construction Expert System), which is a prototype implemented for the regenerative expert system approach. the paper introduce the framework of the regenerative expert approach as a general framework of developing and maintaining a large-scale expert systems.

  • PDF

A Study on The Analysis of Present Condition and Problems of Construction Management Certification Qualification in Korea (국내 건설사업관리 (CM) 인증자격의 현황 및 문제점 분석에 관한 연구)

  • Yu, Hoe-Chan;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05b
    • /
    • pp.181-184
    • /
    • 2009
  • The technical expert standing system of our construction industry is operated by the Ministry of Labor subjective national technical qualification law, as the professional engineer, architect and architect-engineer and so on. The construction management(CM) which is introduced on middle 1990 activates a building industry the condition of the essential indispensability for is becoming, is not officially recognized with is judged as the nostril people for qualification of the civil CM educational institutions ha the certification which is a each educational program and a separate way and it is the actual condition which is become accomplished, In this research, it observes the capital increase reserve problem point which is a domestic CM and the certification integration which is a report and system anger it leads and with national certified qualification it develops to present the improvement program for, it does to sleep.

  • PDF

The Improvement of Point Cloud Data Processing Program For Efficient Earthwork BIM Design (토공 BIM 설계 효율화를 위한 포인트 클라우드 데이터 처리 프로그램 개선에 관한 연구)

  • Kim, Heeyeon;Kim, Jeonghwan;Seo, Jongwon;Shim, Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.5
    • /
    • pp.55-63
    • /
    • 2020
  • Earthwork automation has emerged as a promising technology in the construction industry, and the application of earthwork automation technology is starting from the acquisition and processing of point cloud data of the site. Point cloud data has more than a million data due to vast extent of the construction site, and the processing time of the original point cloud data is critical because it takes tens or hundreds of hours to generate a Digital Terrain Model (DTM), and enhancement of the processing time can largely impact on the efficiency of the modeling. Currently, a benchmark program (BP) is actively used for the purpose of both point cloud data processing and BIM design as an integrated program in Korea, however, there are some aspects to be modified and refined. This study modified the BP, and developed an updated program by adopting a compile-based development environment, newly designed UI/UX, and OpenGL while maintaining existing PCD processing functions, and expended compatibility of the PCD file formats. We conducted a comparative test in terms of loading speed with different number of point cloud data, and the results showed that 92 to 99% performance increase was found in the developed program. This program can be used as a foundation for the development of a program that reduces the gap between design and construction by integrating PCD and earthwork BIM functions in the future.