• Title/Summary/Keyword: Construction Program

Search Result 2,439, Processing Time 0.025 seconds

TAGUCHI OPTIMIZATION OF DISPLACEMENTS DURING THE DESIGN PHASE OF A CONSTRUCTION PROJECT

  • E.S. N. Telis;G. J. Besseris
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.721-728
    • /
    • 2007
  • The prediction of quality characteristics during the design phase of a construction project was fragmented, because no particular method exists. One of the most important key responses is the total displacements (horizontal and vertical). A brainstorming session produces the quality parameters i.e. the control factors which here are identified as: the steel joint, the pile's length, the excavation depth and angle, the distance between the piles, the anchor stretch and length to name just some of the most engaging in the design. The purpose of this study is to optimise these parameters to minimize the total displacements following a methodology based on Taguchi method. For this reason, a 2-level, L8 orthogonal array has been employed to organize the experimentation. Data is obtained from a real-life excavation project designed on the Plaxis v.8 CAE package. Taguchi analysis is performed in the statistical package Minitab.

  • PDF

Prediction and validation of the stability for the excavated ground using numerical analysis (수치해석을 이용한 굴착지반의 안정성 검토와 예측)

  • Song, Joon-Hwa;Jang, Yeon-Soo;Kwon, Oh-Kwoo
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2005.03a
    • /
    • pp.1448-1454
    • /
    • 2005
  • Horizontal displacement of slurry wall with strut is analyzed using 2-D numerical stress-displacement program, FLAC. Validation of the program results are performed using the pre- and ongoing excavation sections and further displacement is predicted in the stage of strut removal. The result show that the calculated displacement was very close to the measured displacement when 40% in-situ strut preloading is applied to the strut loading of the program considering the horizontal spacing of struts in the field. It was found that construction efficiency can be improved by partially removing the struts before putting slabs in the stage of subway structure construction.

  • PDF

A Study of iPMIS(Intelligent Program Management Information System) Information Inference an Searching System Based on Ontologies (온톨로지 기반 정보 검색 시스템을 이용한 iPMIS (지능형 종합사업관리시스템) 정보 추론에 관한 연구)

  • Ahn, Hyoung-Jun;Lim, Jae-Bok;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05b
    • /
    • pp.175-179
    • /
    • 2009
  • Researches of current PMIS(Project Management Information System) information searching focus on providing personalized results as well as matching needed queries in an enormous amount of information. This paper aim at discovering hidden knowledge to provide personalized and inferred search results based on the ontology with categorized concepts and relations among construction data. The current PMIS searching occasionally presents too much redundant information or offers no matching results from large volumes of data. In this paper, we propose a service searching system, which becomes aware of users device using iPMIS(Intelligent Program Management Information System). And we design and plant the ontology-based iPMIS, which is aware of the context in its environment.

  • PDF

A STUDY ON DEVELOPING DECISION SUPPORT MODULES OF iPMIS(INTELLIGENT PROGRAM MANAGEMEN INFORMATION SYSTEM) FROM ONTOLOGICAL PERSPECTIVE

  • Jae-Bok Lim;Ju-Hyung Kim;Jae-Jun Kim
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.717-724
    • /
    • 2009
  • Most recent programs in and out of the country are related to urban renewal projects. Contemporary project management information systems have been developed was to manage single or multiple projects focusing on their construction phase, and those have limitations to apply to large-scale complicated mega projects. So, this study explain the core concept of decision support modules for iPMIS (Intelligent Program Management Information System) and its major functions to support project owner and participants by introducing ontology in the web environment. This study confined the scope of research to the planning phase of urban environment improvement projects. Ontological logic structure and relation about planning works is essential parts and three functions to implement decision support module are developed.

  • PDF

A study on the program in Kazuyo Sejima's Architecture (카즈요 세지마의 건축에서 나타나는 프로그램에 관한 연구)

  • Jung, Dong-Ho;Kim, Dong-Jin
    • Korean Institute of Interior Design Journal
    • /
    • v.16 no.2 s.61
    • /
    • pp.32-39
    • /
    • 2007
  • The Program from modern architecture is an indispensable condition which must put in all buildings today and it is a relationship setting of a various functions. According to changing society consequently, a complicated form and program in modem appear again. Through this background from, we intend to observe the meaning which the program is having in the construction in this manuscript. Sejima is the architecture who try to use variously special formation of the program. Specially, we are planning to research the quality which his program is haying form Sejima's architecture and how it is reflected ill this construction. Resultantly, each program which appears from Sejima's architecture makes a gap space and irregular arrangement. The characters of the space which is put each through the gap don't have a deceptive plan each other and they are compounded. Also, each character to have their territories is intersected and putting out of the various features in the program coat. First, form of the maze plane, Intersecting each territory. Second, forming the territory as fitting their act oneself in the space where can be existing. Third, having more interest in the event that happens inside than existence problem of thing.

Construction of a Computation Web Server for Genome Analysis (제놈 분석용 계산 Web 서버의 구성)

  • Park, Kie-Jung;Lee, Byung-Wook;Park, Yong-Ha
    • Microbiology and Biotechnology Letters
    • /
    • v.24 no.1
    • /
    • pp.132-136
    • /
    • 1996
  • A comutation server is needed to provide analysis programs to Korean biologists, especially genome researchers, on GINet. For each analysis program, we implmented an input form with HTML and a CGI program for interface between an input form and an analysis program with C language on GINet computatin Web server. We made two construction methods of CGI programs for analysis programs, and implemented all CGI programs based on the methods followed by modifying each CGI program for specific processing of each program. On the server ten programs are availabel now, which include most frequently used ones and those developed by our team, and most programs with will be ported or developed by our team will be available on the Web server.

  • PDF

Reliability Analysis and Utilization of BIM-based Highway Construction Output Volume (BIM기반 고속도로 공사 물량산출 신뢰성 검토 및 활용)

  • Jung, Guk-Young;Woo, Jeong-Won;Kang, Kyeong-Don;Shin, Jae-Choul
    • Journal of KIBIM
    • /
    • v.3 no.3
    • /
    • pp.9-18
    • /
    • 2013
  • In case of applying the BIM method in the civil engineering of irregularly shaped structure, BIM method began to be introduced in the current building engineering area compared with the expected effects of the relatively high construction productivity has been recognized. In this paper, I have developed quantity calculation algorithms applying it to earthwork and bridge construction, tunnel construction, retaining wall construction, culvert construction and implemented BIM based 3D-BIM Modeling quantity calculation. Structure work in which errors occurred in range between -6.28% ~ 5.17%. Especially, understanding of the problem and improvement of the existing 2D-CAD based of quantity calculation through rock type quantity calculation error in range of -14.36% ~ 13.07% of earthwork quantity calculation. It's benefit and applicability of BIM method in civil engineering. In addition, routine method for quantity of earthwork has the same error tolerance negligible for that of structure work. But, rock type's quantity calculated as the error appears significantly to the reliability of 2D-based volume calculation shows that the problem could be. Through the estimating quantity of earthwork based 3D-BIM, proposed method has better reliability than routine method. BIM, as well as the design, construction, maintenance levels of information when you consider the benefits of integration, the introduction of BIM design in civil engineering and the possibility of applying for the effectiveness was confirmed. In addition, as the beginning phase of information integration, quantity document automation program has been developed for activation of BIM. And automatically enter the program code number, linkage and manual volume calculation program, quantity document automation programs, such as the development is now underway, and step-by-step procedures and methods are presented.

A Study on Construction Management System for Settlement in Korea through the Case of Program Management of IIA Project (IIA Project PM 적용사례를 통한 CM체계 정착방안)

  • Oh Myung-Kap
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.96-101
    • /
    • 2001
  • Incheon International Airport Construction Project the biggest national multi-complex construction project in a single area in Korea, the necessity for introducing the Program Management System has been brought up from the development stage due to its specific characteristics and environment and with the Project Management Services Contract in December 1994 the system has been established and operated. At the time of contracting, there were controversies over the expected effect of the system since there were no related laws and regulations in domestic construction codes. Furthermore the situation was very hard in which some practical problems have been found in the process of applying and operating the system due to the lack of recognition and infrastructure in Korea. Incheon. In spite of these difficulties, thanks to the devotion and efforts of the project participants along with thoughtful concerns from the industries and the academies, the project goal has been successfully accomplished. This paper will analyze the various problems arose in the process of applying the Project Management System to Incheon International Airport and present more practical and desirable ways so that it can help to make the environment for properly settling Construction Management at the earliest.

  • PDF

Development of Time-Cost Models for Building Construction Projects in Bangladesh

  • Rahman, MD. Mizanur;Lee, Young Dai;Ha, Duy Khanh;Chun, Yong Hyun
    • Journal of Construction Engineering and Project Management
    • /
    • v.4 no.3
    • /
    • pp.13-20
    • /
    • 2014
  • Estimating time and cost is an important mission in the early phase of a construction project, especially in feasibility study. It provides a foundation for making decision whether or not the project is performed on schedule and within budget. Thus, reliability of this estimate plays a key role in measuring the success of a project. This study was carried out to investigate the time-cost relationship in building construction projects in Bangladesh. The mathematical equation used in this study is based on Bromilow's equation. The research data were collected from sixty-three completed building projects through questionnaire survey. Type of clients, type of projects, and tender methods are the project characteristics considered in this study. The results of analysis indicated that the Bromilow's time-cost (BTC) models developed for each project characteristic are appropriate due to quite high coefficient of determination and relatively small mean percent errors. Among them, the forecasted model for time and cost according to tender methods is the best fit model. It is concluded that the BTC model could be applied in building construction project to predict its time and cost in Bangladesh. Four different regression models were also developed in this study. The results of BTC model between some selected countries were compared to gain the comprehensive view.

A Study on the Behavior of Steel Curved Girder Bridge during Construction (곡선 강박스 거더교의 가설중 거동 파악 연구)

  • Gil, Heung Bae;Pae, Chang Kyu;Kang, Sang Gyu
    • Journal of Korean Society of Steel Construction
    • /
    • v.17 no.5 s.78
    • /
    • pp.511-518
    • /
    • 2005
  • The behavior of steel curved bridges is more complicated than straight bridges, thus the analysis, design and construction process of curved bridges require much more attention. In design of curved bridges, the grillage analysis using general structural analysis program or special program is mainly used. Comparative study in coherence between these analytical results and actual behavior of curved bridges has been rarely conducted. To study the behaviour of curved bridges and verify the current design method, field measurements and analyses using general structural analysis program and 3-D refined analysis program were carried out for simple and continuous bridges in this study. The study focused on the behavior of curved steel bridges during construction. Measured and analytical results had quantitative difference mutually, but there were qualitatively similar. Stress variations in transverse direction of flange were observed and grillage analysis models yielded more conservative values than 3-D refined analysis models.