• Title/Summary/Keyword: Construction Periods

Search Result 422, Processing Time 0.026 seconds

A basic study of manufacturing technology of free-form concrete segments (비정형 콘크리트 생산기술 기초연구)

  • Kim, Geun-Ho;Lim, Chae-Yeon;Kim, Sun-Kuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.12-13
    • /
    • 2013
  • Free-form building is increasing because of request that an order to raise the value and request of the local residents and the government trying to own iconic and beautiful buildings. In addition, the installation and production of free-form concrete segment are now available because of development of construction technology, such as the development of materials and equipment. However, the production of free-form concrete segment requires a lot of time and manpower than shaping. In particular, resources of the mold for the production of free-from segment will be invested excessively because mold can not be recycled. Thus, the problems of increased costs, construction periods and loss of productivity occur. To solve these problems, this study proposes a technique of making the mold of for variable within a short time. Technique proposed in this study can be recycled die and will realize fast and accurate free-form concrete segment.

  • PDF

A Experimental Study on Prediction of Compressive Strength of Concrete Based on Maturity Using Apparent Activation Energy (열량계와 겉보기 활성화 에너지를 이용한 콘크리트의 압축강도 예측에 관한 실험적 연구)

  • Kim, Han-Sol;Jang, Jong-Min;Kim, Yeung-Kwan;Lee, Han-Seung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.11a
    • /
    • pp.73-74
    • /
    • 2020
  • Predicting the compressive strength of concrete is important for shortening construction time and reducing construction costs. In this study, the coefficients required for maturity method and compressive strength prediction equation were calculated by measuring the cement hydration reaction rate, concrete setting time and ultimate strength. The experiment was conducted in an isothermal environment of 10℃, 20℃ and 30℃ using a normal Portland cement, and the experiment was conducted with a total of 9 levels of W/C (40%, 50%, 60%) of 3 levels for each temperature. As a result of comparing the predicted strength and the measured strength for each blend, only an error of less than 5% was found for all blending and curing periods.

  • PDF

Application of storm water management model to designing the sponge city facilities in the Athletes Village of Military World Games in Wuhan

  • Liu, Jian;Liu, Yan;Liu, Ru;Li, Sixin;Wu, Lingyi
    • International conference on construction engineering and project management
    • /
    • 2017.10a
    • /
    • pp.346-352
    • /
    • 2017
  • This study discusses application of the storm water management model (SWMM) to designing the sponge city facilities in the Athletes Village of Military World Games in Wuhan in October 2019. The SWMM was used to simulate the runoff processes and reduction efficiencies of the sponge city facilities. The runoffs of the sponge city facilities were compared with those of traditional drainage system for the design rainfall of 35.2mm and the rainfalls with different recurrence periods. The results show that the hign density sponge city facilities could meet the requirements for 80% of annual runoff control rate, SWMM can determine the scales of the sponge city facilities and effectively simulate the hydrological processes for different layout schemes. The simulation model is also helpful to making optimization of the sponge city facility layout.

  • PDF

Cash flow Forecasting in Construction Industry Using Soft Computing Approach

  • Kumar, V.S.S.;Venugopal, M.;Vikram, B.
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.502-506
    • /
    • 2013
  • The cash flow forecasting is normally done by contractors in construction industry at early stages of the project for contractual decisions. The decision making in such situations involve uncertainty about future cash flows and assessment of working capital requirements gains more importance in projects constrained by cash. The traditional approach to assess the working capital requirements is deterministic in and neglects the uncertainty. This paper presents an alternate approach to assessment of working capital requirements for contractor based on fuzzy set theory by considering the uncertainty and ambiguity involved at payment periods. Statistical methods are used to deal with the uncertainty for working capital curves. Membership functions of the fuzzy sets are developed based on these statistical measures. Advantage of fuzzy peak working capital requirements is demonstrated using peak working capital requirements curves. Fuzzy peak working capital requirements curves are compared with deterministic curves and the results are analyzed. Fuzzy weighted average methodology is proposed for the assessment of peak working capital requirements.

  • PDF

Chloride penetration in anchorage concrete of suspension bridge during construction stage

  • Yang, In-Hwan;Yoon, Yong-Sik;Kwon, Seung-Jun
    • Advances in concrete construction
    • /
    • v.10 no.1
    • /
    • pp.13-20
    • /
    • 2020
  • Steel corrosion in embedded steel causes a significant durability problems and this usually propagates to structural degradation. Large-scaled concrete structures, PSC (Pre-stressed Concrete) or RC (Reinforced Concrete) structures, are usually constructed with mass concrete and require quite a long construction period. When they are located near to sea shore, chloride ion penetrates into concrete through direct or indirect exposure to marine environment, and this leads durability problems. Even if the structures are sheltered from chloride ingress outside after construction, the chloride contents which have been penetrated into concrete during the long construction period are differently evaluated from the initially mixed chloride content. In the study, chloride profiles in cores extracted from anchorage concrete block in two large-scaled suspension bridge (K and P structure) are evaluated considering the exposure periods and conditions. Total 21 cores in tendon room and chamber room were obtained, and the acid-soluble chlorides and compressive strength were evaluated for the structures containing construction period around 3 years. The test results like diffusion coefficient and surface chloride content from the construction joint and cracked area were also discussed with the considerations for maintenance.

Effect of Construction Sites on Water Quality of Small Stream in Rural Area (농촌 소하천 유역의 건설 현장이 하천오염에 미치는 영향에 관한 연구)

  • Kim, Jun-Young;Chang, In-Soung
    • Journal of Environmental Science International
    • /
    • v.17 no.3
    • /
    • pp.297-303
    • /
    • 2008
  • For last couple of years many apartments, roads and bridges are constructed along the Kok-kyo stream which is penetrating Asan city, Chung-Nam Province. The effect of construction on stream environment was investigated in this study. Various kinds of water qualities of the Kok-kyo stream were monitored for 5 months. As it passed through the construction sites, $COD_{cr}$ concentration increased abruptly whereas the increment of the $BOD_5$ was not so great, indicating that non-biodegradable organics were flowed from the construction sites to the stream. Particularly, 0.2 mg/L of N-hexane was measured, which is believed to be mainly responsible for the organic pollution from construction sites. In spite of short periods of water quality monitoring, it could be concluded that there was a good correlation between construction sites and stream pollution. Therefore, legislative activity or enforced management by local government to the construction sites are needed for keeping the small stream environment better.

A Case Study on the Application and History of Improved Method Top-Down Support by the Building Structure (건축 구조체를 이용한 개량 역타공법의 변천 과정과 적용 사례연구)

  • Lee, Jung-Jae;Jung, Kyoung-Sik;Roh, Bae-Young;Hong, Won-Pyo;Kim, Jong-Ho
    • 기술발표회
    • /
    • s.2006
    • /
    • pp.45-53
    • /
    • 2006
  • Top-Down Construction Method has been considered as the steadiest and the most reasonable method of construction since 1984 when it was applied to LG Da-Dong building and its usage in the field construction has since grown rapidly. With increased cases, engineers not only pursue their studies of R & D continuously but also develop various technical methods based on Top-Down Construction in an era of rapid technological change to adopt them to the field construction. Top-Down Construction meets the needs of these challenging points, such as reduction and eliminates of temporary equipment for supporting permanent structures on the ground, improved method of construction, shortening construction periods, cost reduction, and allows for minimal environmental impact.

  • PDF

Hardening Properties of Hardener-Free Epoxy-Modified Mortars by Curing Conditions (양생조건에 따른 경화제 무첨가 에폭시수지 혼입 PMM의 경화특성)

  • Lee, Jae-Hwa;Kim, Joo-Young;Kim, Wan-Ki
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.255-257
    • /
    • 2012
  • Epoxy resin without any hardener can harden in the presence of hydroxide ions in cement mortars and concretes at ambient temperature. The purpose of present study is to examine the hardening properties of hardener-free epoxy-modified mortars by curing conditions. The hardener-free epoxy-modified mortars using diglycidyl ether of A epoxy resin are prepared with various polymer-cement ratios, and subjected to initial moist/dry curing, initial steam(90℃) curing, initial steam/heat(80℃, 100℃) curing.As a result, degree of hardening of epoxy resin in initial moist/dry cured, initial steam cured and initial steam/heat(80℃) cured hardener-free epoxy-modified mortars is decreased with increasing polymer-cement ratio. However, it is markedly improved with additional dry-curing periods. On the other hand, regardless of the polymer-cement ratio and dry curing periods, degree of hardening of hardener-free epoxy-modified mortars with initial steam/heat(100℃) cure is over 95%.

  • PDF

A Study on the Reform-Curriculum of Interior-Architecture in a Junior College (전문대학 실내건축과 교과과정개편에 관한 연구)

  • 신정진
    • Korean Institute of Interior Design Journal
    • /
    • no.7
    • /
    • pp.38-44
    • /
    • 1996
  • To improve and replete many problems which are discovered the present condition and cases of interior architecture education previously, 1) Adopted the sixth semester, the ninth semester of 3 -year course of study as a reform of the school system. 2) Building up Design -basic understandings of design , Design Resources -layout course, factor course and Design Communication three -steps of systematic -educational course of methodical course fro transmitting and 3) Classifying interior space designer , interior factor designer, interior decorator, special -space designer as practical parts. 4) Divided three fields : layout, construction work, factor design , related to interior design works. 5) Also, divided like (Table-2), job-analysis and formation of relating course into layout and construction work. 6) Analyzed and (Table-3) the present condition of four domestic Junior college (Seoul and kyong -ki areas) as a case study. 7) Analyzed and surveyed (Table-4) three American colleges, sixth semester and ninth semester of three year course of study and 8) Have to solidify practical computer education, foreign language education as the terms desired keeping pace with internationalization and the changes of opening periods. 9) As above-mentioned, reenforcing the fundamental education of lower grades and needs fractionizing special education of higher grades. Finally, needs to be prepared the environments which enable to develop the marked educational goals & contents and then be exeucted, which make one do his responsibility after setting out in the world, satisfying a periods wishies : many competent experts that can be produced.

  • PDF

A Study on the Evolutionary Process of Ddeulzip in Andong Kwon's Family at Andong Cultural Area (안동문화권(安東文化圈) 안동권씨(安東權氏) 뜰집의 변천과정(變遷過程) -안동권씨(安東權氏) 복사공파(僕射公派)를 중심으로-)

  • Kim, Hwa-Bong
    • Journal of architectural history
    • /
    • v.25 no.2
    • /
    • pp.45-56
    • /
    • 2016
  • The purpose of this study is to analyze the evolutionary process of Ddeulzip. The subject of this study is a clan family of Andong Kwon in Andong Area. Ddeulzip's evolutionary process of the construction and management is divided into largely three periods in Josun Dynasty. The establishment and changing process of Ddeulzip for Andong Kwon's family are analyzed according to three periods called the early(15~16C), mid(17~18C) and late(19~20C). The characteristics of the early and mid period are that they created their own ancestral building form of Ddeulzip. Those of the late period are in their strong will to make similar scale of Ddeulzip. And during the late period, although the construction of new Ddeulzip was started in the early stage, no more formation of Ddeulzip was made as it approached toward the late stage. And most important point is similar constructional space(gan) of first time. The residential Ddeulzip of Andong Kwon's family created at the 19C can be regarded as an representative example of large space that shows a typical form of housing by noble residents at the time.